HomeMy WebLinkAboutMINUTES Light and Power Committee 1993-10-07(n
RECORD OF PROCEEDINGS
Light and Power Committee
October 7,1993
Committee:Trustees Hix and Dekker
Attending:All
Also Attending:Administrator Kiaphake,Light &Power Director
Matzke,Clerk O’Connor
Absent:None
Trustee Hix called the meeting to order at 10:00 A.M.
U.S.WEST REPORT ON CONSTRUCTION PROGRAM FOR ESTES PARK AREA.
Phil Vasquez,Engineering Manager and Edie Ortega,District
Operations Manager/U.S.West,appeared before the Committee at the
request of the Public Works Committee to review the construction
program for the Estes Park area.Mr.Vasquez presented fact
sheets,as follows:
Pending Service Requests:
new service 36
additional service 28
regrade service 126
Of those requesting new service,32 will be completed by the end of
the year.Mr.Vasquez confirmed that customers without service are
given highest priority.Those requesting regrades of their service
are multi—party customers requesting private lines.
Completed Service Requests:
new service 95
additional service 23
regrade service 36
Capital spending for 1993 and proposed for 1994 were also reviewed.
Boundaries for the Estes Park area include oniy those customers
with a 586-exchange.Engineering is now being performed to
determine the construction required for the four remaining
customers desiring service.Ms.Ortega stated that U.S.West
recently installed a new switch in Estes Park;a major Service
Improvement Plan is underway an integral part of which is the rural
upgrades within the state;investments continue to be made in Estes
Park;and the area geography provides a challenge for service
installation.Regarding installation information provided to the
customer,it is at times difficult to pin point a time-frame for
installation.This situation is unacceptable both to the company
and the customer,and U.S.West admittedly could improve in this
area.Ed Heinz,Engineer/U.S.West confirmed that 1993
construction projects include Dry Gulch,Carriage Hills and
miscellaneous small projects in the Estes Park exchange area.Mr.
Heinz also reviewed proposed capital projects for 1994.Pertaining
to growth,Ms.Ortega confirmed that growth throughout the country,
not just in Estes Park,has far exceeded forecasts.The Committee
expressed their appreciation to the U.S.West representatives and
recommends U.S.West return March 10,1994 with a progress report.
1993 ELECTRIC RATE STUDY -PRESENTATION.
N.E.Kiburz and Associates prepared said electric study for the
purpose of updating the Town’s retail rates established in 1991 to
incorporate PRPA’s wholesale rate change,and it is “revenue
neutral.”The study recommends:(1)a decrease for the
residential,small commercial and municipal energy rates;(2)a
small increase in the winter season demand and energy charges for
BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS
Light and Power Committee -October 7,1993 -Page 2
the residential demand rate;(3)significant reduction in the
summer season demand charge;(4)for the large commercial rate —a
slight increase in the energy charge and a decrease in the demand
charge;and (5)elimination of the minimum demand ratchet for most
large commercial customers,reserving the right to impose a 60%
minimum demand charge by season for a customer that peaks only in
a month coincident with PRPA’s seasonal peak load.Staff reported
that Town Attorney White has not completed his review to ensure
that the Outdoor Area Lighting Rate conforms to TABOR.
Mr.Kiburz thoroughly reviewed the methodology utilized to prepare
the rate study and subsequent rate classifications.The study
confirmed that it is now appropriate to include weekends and
certain holidays in the off peak period for the time of day rate.
This category reflects a slight increase in the on—peak energy
charge and a slight decrease in the off—peak energy charge for the
residential time of day rate.A small increase in the on—peak
energy charge is recommended for the large commercial time of day
rate.The off-peak demand charge for both time of day rates would
be eliminated.New rates include the Outdoor Area Lighting Rate,
Residential Time of Day Energy Rate and a Small Commercial Time of
Day Energy Rate.The Purchase Power Rider,which allows the Town
to pass through wholesale rate changes to all rate classes,will
now be based upon the PRPA rate in effect since April,1993.The
amount of the purchase power rider will be zero until the wholesale
rate from PRPA changes.
The Committee recommends the rate changes included in the 1993
Electric Rate Study be forwarded to the Town Board for
consideration at a public hearing on November 23,1993.
PROSPECT MOUNTAIN LEASE AGREEMENT -PRESENTATION.
Director Matzke presented the proposed lease agreement between the
National Park Service and Robert and Nell Heron allowing the Town
to construct and maintain its radio facilities on Prospect
Mountain.The previous agreement,which expired at the end of
1992,included a 5—year term,covered an unspecified number of
transmitters,and cost the Town $1,000/year.The proposed
agreement lists the Towns existing facilities,calls for additional
rent if the Town installs facilities in addition to those listed,
the rent for the first year is $2,400 with annual increases indexed
to the Denver CPI,and includes a 5—year term with an option to
renew for two additional 5—year terms.The agreement provides the
Town a long—term location to operate its radio equipment.The
Police,Water and Fire Departments will pay $600.00/each and the
remaining $600.00 will be divided among the balance of the Town
departments.Staff confirmed that the lease would remain in force
should the property be sold and that Town Attorney White has not
completed his review to ensure the Agreement conforms to TABOR.
The Committee recommends approval of the lease as presented.
REPORTS.
The Committee reviewed the August financial report and associated
graphs.
Project Updates.The Meter Department recently began a current
transformer metering test program.A current transformer
accurately passes a fraction of the customer’s total load through
the electric meter.For this reason,a multiplier is applied to
the meter readings at these locations to determine the actual
consumption.The Department presently serves ±7,200 customers of
which 103 have multipliers.The vast majority of these accounts
are commercial customers.After testing five current transformer
installations,Meter Department personnel discovered errors in the
C C
RECORD OF PROCEEDINGS
Light and Power Committee -October 7,1993 -Page 3
billing multiplier for three of those accounts.Two customers were
being overbilled and one customer was being underbilled.The
customers that were overbilled have received a refund and the
remaining customer will not be “back billed.”These three
multipliers have been corrected and the remaining 98 verified.Due
to the recent amendment to the Open Records Law,identification of
the three accounts was not provided.The testing program will
continue.
The hand-held meter reading equipment has been implemented.Meter
Department personnel received three days of on—site training and
the system was activated on Friday,October 1.Personnel
efficiency should be realized in the Finance Department as the
previous paper meter book system will be eliminated and meter reads
will no longer be keyed-in by hand.
The Prospect Mountain extension has been completed and additional
dormitories have been connected at the Honda School.
There being no further business,Trustee Hix adjourned the meeting
at 11:28 A.M.
Vickie O’Connor,CMC,Town Clerk
Fe
0CT121993
f
C I