Loading...
HomeMy WebLinkAboutMINUTES Light and Power Committee 1994-12-08BRADFORD PUBLISHINGCO.RECORD OF PROCEEDINGS Light and Power Committee December 8,1994 Committee:Chairman Dekker,Trustees Miller and Pauley Attending:All Also Attending:Assistant Administrator Widmer,Light &Power Director Matzke,Assistant to the Light & Power Director Mangelsen,Clerk O’Connor Absent:None Trustee Pauley called the meeting to order at 8:15 A.M. 1994-95 WINTER SEASON PEAK REDUCTION STRATEGIES. The Department has implemented a number of strategies over the years that attempt to reduce the Town’s winter season system peak. The cost to serve load that appears only at the time of system peak,is $64.68/kW.Some of these programs include demand and time—of—day rates for customers with electric heat,energy audits, highway lighting replacement,Municipal Building efficient lighting and electric thermal storage heat,and purchase of low loss distribution transformers.Although the Department has no control over these programs,the equipment has been installed and they should be working at the time of system peak. In addition,a number of strategies which require active involvement by staff to be successful include: •Substation Voltage Reduction.A 1%reduction in substation voltage results roughly in a 1%reduction in system load.A 2%voltage reduction with a system load of 18,000 kW would result in a load reduction of approximately 360 kW. •Emergency Generator Rebate Program.The Town will most likely have 140 kW of load that can be offset by customer—owned emergency generators in time for this winter season. •Street Light Override.The Department now has the capability to override the photocontrols on approximately 35kW of decorate street lights in the downtown area.In addition,the Christmas twinkle lights (14 kW)can be turned-off on peak days. •Beat—the—Peak Program.This is a public awareness program through Channel 8,KRICI and flyers requesting customers to voluntarily conserve electricity between 5:00 and 8:00 P.M. These four programs require that the Department anticipate the day that the peak might occur and then take appropriate action.The potential savings in purchase power costs can be significant. Staff will review these programs to determine their value. LOOP TRANSMISSION SERVICE TO MARYS LAKE SUBSTATION -REPORT. Director Matzke reported on this project that involves several agencies,including WAPA,PRPA,and BOR.In summary,the project will provide a second source of power to the Marys Lake Substation. The total system load can be switched most of the time to be fed from one substation during emergencies;however,this situation is not the most desirable.In addition,should the Estes Power Plant substation experience an outage,a blackout of the entire system CO.RECORD OF PROCEEDINGS Light and Power Committee -December 8,1994 -Page 2 could occur.At this time,two designs are being considered: install an additional breaker at the Estes switchyard,or,bypass the Estes switchyard,and construct the line directly to the Narys Lake Substation and back to the Estes switchyard.The scope of the project is still being negotiated;there is no cost to the Town as this is a standard service to PRPA members,and estimated project costs are $3.3 Million.Rebuilding of the existing 69 kV transmission line is estimated at $700,000,and costs to underground the line is being reviewed.Additional information will be presented when available. REPORTS. The November Financial Statement was unavailable;however,staff reviewed associated graphs concerning year—to—date revenues and purchased energy. Project Update:In November,the Finance Department processed 7,644 electric bills,which reflects an increase of 367 customers from November 1993--an all-time record.Electric facilities have been completed for the Stanley Views Addition and have commenced for Prospect Estates,Phase 3.All Christmas decorations have been installed,including Bond Park.Inventory has begun and the Department’s goal is to be completed by Christmas.PRPA has completed the first radio computer link-up which will eventually connect all shop computers with the mainframe computer via microwave radio. Assistant Administrator Widmer reported that PRPA will present their Business Plan to the Town Board December 13.The plan will review/explain industry trends and provide a guide for PRPA in the future. There being no further business,Chairman Dekker adjourned the meeting at 9:13 A.M. /2 t--z Vickie O’Connor,CMC,Town Clerk i 0EC131994 .i_s