Loading...
HomeMy WebLinkAboutMINUTES Light and Power Committee 1997-07-10Q. RECORD OF PROCEEDINGS ‘Light and Power Committee July 10,1997 Committee:Chairman Hix,Trustees Baudek and Pauley Attending:Chairman Hix and Trustees Baudek and Pauley Also Attending:Assistant Administrator Widmer,Light &Power Director Matzke,Line Superintendent Dragon,and Deputy Clerk Kuehi Absent:None Chairman Hix called the meeting to order at 8:00 a.m. TRENCHING CONTRACT FOR HIGHWAY 7 CROSSINGS -AWARD CONTRACT Director Matzke reported that the 1997 budget contains $15,000 for underground crossings at 7 locations to be installed in conjunction with the Hwy.7 widening project.Line Superintendent Dragon reported that one crossing has been installed at a cost of $2,500,and explained that Cable TV is also installing underground at some locations,and total project length is subject to change.The following bids were received: Coulson Excavating $30,000 COMSCO $24,300 ($8,400 if no rock sawing is required) Fiske Electric No Bid Chief’s Landscaping No Bid It is recommended the contract be awarded to COMSCO.The project will be under budget if no severe rock conditions are encountered;however,there is adequate funding to cover this contract if all the crossings require rock sawing.The Committee recommends that COMSCO be awarded the contract to install Highway 7 underground crossings at a cost not to exceed $26,700 (includes 10%variation in total length of project). INSTALLATION OF DECORATIVE STREET LIGHTS AT THE CONFERENCE CENTER It is recommended that two decorative street lights be installed behind the sidewalk on either side of the Conference Center entrance at a cost of $3,815,to replace one standard highway light that was removed prior to the Hwy.7 widening project.The Committee recommends the Light &Power Dept.replace the highway lighting in front of the Conference Center with decorative Street lights at a cost of $3,815,to be reimbursed by the General Fund. REPORTS Platte River Power Authority:Assistant Administrator Widmer reported that the APPA Conference included several sessions on fiber optics and the uses to cities in addition to utilities,such as internet access and Cable TV.PRPA will complete a fiber optics business plan for member cities. Trustee Pauley agreed that this should be studied. Director Matzke presented the Financial Reports for May. Project Updates:Undergrounding on the south end of Hwy.7 is complete, and the installation of street lights will begin next week.The first capacitor bank has been installed on Manford Ave.at the Fairgrounds entrance.In addition to the primary functions of voltage improvement, power factor correction and reduction in circuit losses,the installation of capacitors is part of the minor circuit improvements recommended by ESC,Inc.in the long-range plan.The Municipal Parking Lot lights are being installed. Chairman Hix adjourned the meeting at 8:31 a.m. APPROVEI% __ JUL 2 2 1997 Tina Kuehl,Deputy Town Clerk TOWN OF ESTES PK BOARD OF TSTW