Loading...
HomeMy WebLinkAboutMINUTES Light and Power Committee 1997-12-11RADFORO PUBLISHING CO. n RECORD OF PROCEEDINGS 0 Light and Power Committee “December 11,1997 Committee:Chairman Hix,Trustees Baudek and Pauley Attending:All Also Attending: Absent: Town Administrator Kiaphake,Assistant Administrator Widmer,Light &Power Director Matzke,and Deputy Clerk Kuehl None Chairman Hix called the meeting to order at 8:00 a.m.The agenda was rearranged to accommodate citizens in the audience. FALL RIVER HYDRO PLANT HISTORIC PRESERVATION --APPROVAL OF A CITIZENS ADVISORY COITTEE Administrator Kiaphake explained that the Light &Power Department has requested $100,000 in the 1998 budget for the Fall River Hydro Plant Historic Preservation Project.The 1998 budget also includes $65,000 as a match for anticipated grant funds.A citizen advisory committee has been appointed to assist in the planning and grant application process.Chairman Hix announced the following were appointed by the Town Board,December 9,1997: Mike Mangelsen,Chairman Art Anderson Mayor Dekker Frank Hix Betty Kilsdonk Gene Oja Frank Parks Tom Watts The first meeting will be scheduled in early January 1998.Museum Director Kilsdonk noted that because there are very few hydro electric plants of historic vintage in the state,it is anticipated the State Historical Fund office will be interested in this project. LONG RANGE FINANCIAL PLAN PRESENTATION Max Kiburz,M.E.Kiburz &Assoc.,presented a summary of the Long Range Financial Study.The purpose of the study was to analyze the financial impact on the Light &Power Dept.of the proposed capital improvements.The financial study shows that the proposed capital improvements cannot be fully funded from revenue alone.Many variables,such as long-term debt financing,deregulation,rate increases,will affect this forecast,which can be recalculated as any of these events occur.The Committee accepted the report and directed staff to evaluate alternatives for long-term financing of capital projects as the need arises.Trustee Pauley requested a rate comparison with other Colorado municipalities. LAKE ESTES TRANSMISSION LINES -REPORT Max Kiburz also presented an assessment of alternatives to repay the cost of undergrounding the Lake Estes transmission lines estimated at $4,000,000: Repayment at 7%interest 5 years: 10 years: Based on charge per bill 5 years: 10 years: Based on charge per kwh 5 years: 10 years: $975,600 $569,800 (99,543 total bills) $9.80 $5.72 (103,188,000 kWh) $.0095/kwh $.0055/kwh fl fl RECORD OF PROCEEDINGS Light &Power Committee,December 11,1997 -Page 2 TRANSFER PORTION OF EXISTING 6900 VOLT LINE TO TOWN -APPROVE CONTRACT WITH WESTERN AREA POWER ADMINISTRATION Director Matzke presented a proposed contract with Western Area Power Administration (WAPA)which transfers ownership of the WAPA Estes/Marys Lake 6.9kv transmission line from pole 1/6 to 1/23 and the right to utilize WAPA easements to operate and maintain the transferred transmission line.WAPA will retain the underlying easements.This will provide a ioop service to Prospect Estates Subdivision which would not be available otherwise.If this contract isn’t accepted,the poles and lines will be removed.The Committee recommends acceptance of this contract with WAPA. STREET LIGHTING STANDARDS AND PRACTICES Trustee Baudek expressed concern regarding “stray light”from the light fixtures used in Town.Director Matzke presented examples of the various lighting fixtures presently used,noting that the newer flat lens fixtures alleviate the stray light problem and operate at lower wattage.The flat lens fixtures are being used when current light fixtures need replacement and are required in newer subdivisions.All highway lights along Highways 34 and 7 are flat lens.Each year,$10,000 is budgeted to replace residential fixtures with the flat lens.The Committee recommends increasing the budget for yearly residential light fixture replacement,and that flat lens fixtures be purchased using the remaining 1997 budget with installation of these fixtures completed when time allows. Due to other commitments,Trustees Baudek and Pauley left the meeting. REPORTS Platte River Power Authority:No report. Director Matzke presented the Financial Reports for November. Project Updates:The improvements at the Marys Lake Substation are underway,with construction completion in mid-February 1998. Chairman Hix adjourned the meeting at 9:35 a.m. Tina Kuehl,Deputy Town Clerk