Loading...
HomeMy WebLinkAboutMINUTES Light and Power Committee 1997-09-110 0 RECORD OF PROCEEDINGS “Light and Power Committee September 11,1997 Committee:Chairman Hix,Trustees Baudek and Pauley Attending:Trustee Baudek Also Attending:Administrator Kiaphake,Light &Power Director Matzke,and Deputy Clerk Kuehl Absent:Chairman Hix and Trustee Pauley Trustee Baudek called the meeting to order at 8:00 a.m. CHRISTMAS DECORATIONS INSTALLATION AND MAINTENANCE -AWARD CONTRACT Director Matzke explained that installation and maintenance of the Christmas decorations was contracted last year for the first time to Rocky Mountain Lawn Care (RMLC)for $49,750.RMLC has submitted a 1997 proposal in the same amount,with additional suggestions of steel bracing to the Three Wise Men displays to improve mechanical strength,$5,000,and light bulbs and supplies,$4,000.The Committee recommends approval of the proposal from Rocky Mountain Lawn Care totaling $58,750 to install and maintain the Christmas Decorations,providing the contract include dates for installation and removal. LONG RANGE SYSTEM PLAN -PROGRESS REPORT Director Matzke presented a summary of recommendations for the Light &Power Long Range System Plan,including dates of completion for each project.One major 1997 project,Lexington Lane circuit tie,will be completed in-house.The second major 1997 project, Allenspark reconductor from one phase to three phase,will be contracted,and if completion is not possible in 1997,the funds will be encumbered for 1998.Trustee Baudek expressed appreciation for the summary presentation.Director Matzke noted that the 10- year capital and revenue financial study results will be presented at the next meeting. LIGHT &POWER DEPARTMENT POLICY AND PROCEDURE MANUAL -PROPOSED ADDITIONS AND REVISIONS Director Matzke presented three additions to the Light &Power Policy and Procedure Manual,which was approved in May: •Uncollected Bill Policy •Customer Termination of Utility Service •Automated Payment of Utility Bills (ACH) This request will formally establish these policies in writing. After discussion,the ACH policy will be revised by removing reference of a specific charge for returned checks and replace the wording with:“The Customer...will be assessed the bank’s non- sufficient check charge...“The Committee recommends approval of the three sections to the Light &Power Policy and Procedure Manual as presented. REPORTS Platte River Power Authority:No report. Director Matzke presented the Financial Reports for July and August.Administrator Klaphake requested future reports include a comparison between PRPA peaks and Town peaks. Q RECORD OF PROCEEDINGS Light &Power Committee Meeting -September 11,1997 -Page 2 Project Updates:The Rocky Mountain National Park is now served completely from the Town’s electric system and the project is nearing completion of cleanup work,including overhead line removal.The Hwy.7 conduit project is near completion,and street lights are being installed and energized in phases as the widening project is completed.A new contractor may need to be located to complete painting of the poles.The Arapaho Estates electric system is 75%complete. Two major power outages occurred in the past month: •Black Canyon Subdivision:This outage was caused by underground cable that failed.Approximately 4,000’of cable was replaced.Director Matzke explained that older subdivisions were not equipped with loop feeds,so no alternate service was available to customers during the replacement process.However,loop feed installations are being scheduled in these subdivisions,including Black Canyon which is planned for 1999.Loop feeds are required in new subdivisions. •Prospect Estates SuiDdivision:This outage was caused by a failed electrical switch following a lighting storm. Power was restored by bypassing the switch.A new switch has been ordered,and will require a scheduled outage for installation.Trustee Baudek suggested at least one switch be placed in inventory for future problems. Prospect Estates does not currently have a loop feed; however,the Marys Lake project transmission service, when complete,will establish a loop feed to the north end of the subdivision. Trustee Baudek requested verification and Director Matzke explained that all contractors are required by State law to request locates prior to digging and that most contractors do follow that requirement. Trustee Baudek adjourned the meeting at 8:32 a.m. KQQ Tina Kuehl,Deputy Town Clerk SEP23 1997 (OAR OF j