Chairman Hix called the meeting to order at 10:00 a.m.
Three Reel Wire Trailer —Authorization to Purchase
Fleet Manager Mahany explained that the Department has a three-reel
trailer,accommodating reel sizes up to 60”diameter,and capable
of overhead and underground installations.The larger cable sizes
used need to be special ordered on non—standard reel sizes causing
longer lead times and higher purchase prices.The proposed trailer
will accommodate standard reel sizes (72”)and has many features,
which will allow more efficient installation and provide improved
safety.The existing trailer will continue to be used for overhead
construction and smaller underground jobs.The following bids were
received:
Sauber Manufacturing $23,520
Viking Utility Sales (3 bids)
Option 1,Basic Trailer $21,300
Option 2,Basic Trailer with
Payout brake (not needed)$24,300
Option 3,Deluxe Trailer —demo $26,800
The 1998 budget includes $21,500 for this purchase.The Sauber
trailer,although $2,020 over budget,meets all specifications,
including safety,better ground clearance,and easy turret removal
for hauling equipment.The total vehicle purchases will remain
within the 1998 budget.The Committee recommends approval of the
purchase of the three—reel wire trailer from Sauber Manufacturing
for $23,520.
Meadowdale Hills and Retreat Three Phase Conversion Projects —
Authorization to Execute Construction Contract
Director Matzke reported that the Meadowdale Hills and Retreat
Three—Phase Conversion Projects were recommended in the Long—Range
Plan.A brief history was given along with slides of the areas
showing current pole placement.Director Matzke explained where
underground would be placed in each project if the Committee chose
to do so.Approximately 800’of underground will be included in
the Retreat project surrounding a picnic area,as requested by the
Forest Service and the cost is included in the original design
proposal.The 1998 budget for Meadowdale is $240,000 and the
Retreat,$225,000.following is a summary of total estimated
costs,including labor cost of the recommended contractor:
0 0
RECORD OF PROCEEDINGS
Light &Power Committee,May 28,1998 —Page 2
Original Design:Meadowdale Retreat
Labor $110,174.85 $198,285.00
Material 32,600.00 31,000.00
Engineering 27,000.00 18,000.00
TOTAL $169,774.85 $247,285.00
Original Design w/Underground:Meadowdale Retreat
Labor $192,229.85 $277,085.00
Material 54,820.00 40,375.00
Engineering 27,000.00 18,000.00
TOTAL $274,049.85 $335,460.00
Bids were received from five companies following both designs as
outlined above.The Committee recommends the Town contract with
TSI to construct the two projects following the original design at
a cost of $110,174.85 for Meadowdale and $198,285 for the Retreat.
PCB Treatment Contract Negotiations —Request to Enter Executive
Session
The Committee entered Executive Session to discuss contract
negotiations at 10:26 a.m.Attorney White joined the meeting.The
Committee adjourned the Executive Session at 10:35 a.m.Attorney
White left the meeting.
PCB Treatment,Inc.Steering Committee —Request to Accept
Settlement Offer
The Committee recommends the Mayor execute the Settlement Agreement
and that the PCB,Inc.Steering Committee be paid the amount of
$8,200.
Estes Substation Transformer —Authorization to Contract for
Maintenance Services
Director Matzke explained that the Department has attempted several
times to correct a mineral oil leak on Transformer #1 at the Estes
Substation.Bids were requested to remove the cooling radiators,
replace the gaskets,and repack the shutoff valves.The following
quotes were received:
LTC Transformer
Included Only
Solomon Corporation $13,848.10 $11,811.43
S.D.Meyers,Inc.$16,790.00 $12,740.00
Western States Recloser No Bid
The load tap changer (LTC)regulates the voltage,and needs to be
serviced at this time.The work requires de—energizing the
transformer,draining and filtering the oil,refilling the
transformer.This work will require a three-day outage of the
transformer.The load will be switched to the remaining
transformers and no customer outages are expected.The Committee
recommends approval of the bid from Solomon Corporation for
$13,848.10.
0 0
BRADFORD PUBLISHINGCO.RECORD OF PROCEEDINGS
Light &Power Committee,May 28,1998 —
REPORTS
Fall River Hydro Plant Update:Assistant to the Light &Power
Director Mangelsen reported that the fall River Hydro Plant has
received National Historic designation.On July 13,notification
is expected regarding the requested $45,000 planning grant.A tour
of the Plant will be conducted following the June 11 Light &Power
meeting.
Director Matzke presented the April Financial Reports.
Project Updates:Service to the Estes Park Sanitation District
Sewer Plant is being transferred to new underground cable and pad
mount transformer this morning.The Marys Lake Project is near
completion,and the portable substation has been disconnected.A
tour will be scheduled in July.PRPA fiber contractors have started
work in Town.SCADA equipment will be tested in June.Small
projects associated with the Long—Range Plan have been completed.
Chairman Hix adjourned the meeting at 11:02 a.m.