Loading...
HomeMy WebLinkAboutMINUTES Light and Power Committee 1998-06-11BRADFORD PUBLISHINOCO.RECORD OF PROCEEDINGS “I1ight and Power Committee June 11,1998 Committee:Chairman Hix,Trustees Barker and Jeffrey Attending:All Also Attending:Assistant Town Administrator Widmer,Light & Power Director Matzke,and Deputy Clerk Kuehi Absent:None Chairman Hix called the meeting to order at 8:00 a.m. PRPA Organic Contract —Authorization to Execute amended Contract Assistant Administrator Widmer explained that,due to the rapidly changing utility industry,Platte River wishes to broaden the scope of purpose under the organic contract,and extend the expiration of both the organic and the power supply contract from December 31,2020 to December 31,2040.The revised contracts would include additional services and remove the wholesale limitation.Wholesale power costs to member cities will not be impacted by these changes.The contract extensions would allow PRPA greater flexibility in obtaining long—term financing.There is no impact on the current and future budgets.The Committee recommends approval of the amended and restated organic contract establishing Plate River Power Authority as a separate governmental entity and the amended contract for the supply of electric power and energy,extending the expiration date of both contracts to December 31,2040. Estes Substation —Authorize Staff to Develop Implementation Plan Director Matzke explained that the Long-Range Plan included two alternatives to either rebuild the present Estes Substation or build a new station adjacent to the Estes Power Plant Switchyard. The Board had previously agreed that relocating the substation would be beneficial because of land value at the present location,overhead line removal,improved reliability without additional transmission lines,and the ability to provide continual power during construction.The engineer’s estimate for the total project cost is $3,179,000.Due to the long lead—time required to bring this project to fruition,initial planning needs to begin soon.Recent outages at Estes Substation have reinforced the importance of the reliability of the station. Electrical Systems Consultants is developing a proposed scope of services including a site requirement report and preliminary layout.There may also be legal costs associated with preparation of the special use permit with the Bureau of Reclamation.The 1998 budget for Engineering Services is $15,000.The Committee recommends the Town staff develop an implementation plan and schedule for the Estes Substation Replacement project and return the scope of services proposal to the Committee for approval. Intermountain CableConim —Notification of Rate Increase Michael Pfeiler,District Manager of Fanch Communications and representative of Intermountain CableComm,explained CableComm’s recent upgrades including billing and telephone systems,employee •C Q BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS Light &Power Committee,June 11,1998 —Page 2 training,system improvements,and additional channels.Due to additional costs of providing cable in mountain communities,a rate increase took effect June 1,raising the basic cable cost $3.00 per month and installation charges to $69.95.Mr.Pfeiler explained that present technology does not allow basic cable to be programmed per customer requests.Trustee Barker expressed his frustration regarding service through the 800 number.Mr.Pfeiler explained that FCC guidelines require a response regarding audio or video loss within 24 hours.Assistant Administrator Widmer is the local contact person for cable complaints.The Town chose not to have control over cable television rates,because this involvement would require certification and additional staff. Upon Mr.Pfeiler’s suggestion,the Committee recommends the Town write a letter to CableComm expressing concern regarding service complaints. Pine Valley Three—Phase Conversion Project —Approve Engineering Scope of Services Director Matzke explained that this project was recommended in the Long Range Plan and involves conversion of 1.8 miles of single phase #6 copper overhead line to three phase #1/0 aluminum conductor east of Allenspark.Electrical Systems Consultants has proposed to design the line and staking sheets at a cost of $18,000.This project was not budgeted in 1998;however,the Meadowdale Hills and Retreat projects are $47,940.15 under budget.The Committee recommends Town staff request Electrical Systems Consultants complete the line design and staking sheets for the Pine Valley three-phase conversion project for a total cost of $18,000,and that Staff negotiate a contract proposal with TSI (the contractor for Meadowdale Hills and the Retreat) for presentation at a future Committee meeting. REPORTS Platte River Report:Assistant Administrator Widmer reported that the Board had a presentation by the Colorado PUC staff regarding their Retail Wheeling Study,has adopted the 1998 Strategic Financial Plan,explained that PRPA owns two wind turbines in Wyoming as a result of contractor bankruptcy,and that an arson dog is available for use by member cities. Director Matzke presented the May Financial Reports. Project Updates:All transformers at Marys Lake Substation are in service and all load has been transferred from the portable substation.The 69KV line between Marys Lake and the Estes Power Plant is being rebuilt.WAPA’s overhead 6900 volt lines have been removed along Peak View.Fiber installation progress was explained. The Committee will tour the Fall River Hydro Plant following the meeting.Chairman Hix adjourned the meeting at 8:55 a.m. J Tina Kuehl,Deputy Town Clerk Li