Loading...
HomeMy WebLinkAboutMINUTES Light and Power Committee 1968-01-15nfl LIGHT AND POWER CONMITTEE Committee Report January 15,1968 COMMITTEE:Brodie -Tregent -Petrocine -Sweetland -Bailey ATTENDING:Brodie -Tregent -Sweetland -Bailey ABSENT:Petrocine OLD BUSINESS: 1.Committee gave Sweetland authorization to secure quotations from three or four different auto manufacturers for a new line truck.Anticipated cost:$21,000.00. 2.Committee asked for rate study of light and power rates to be conducted by a competent engineering firm.Mr.Clarence Hoper was contacted and will attend the next regular meeting of the Committee on February 19,1968 at 3:00 P.M.to explore possi1i1ities. NEW BUSINESS: 1.Committee gave authorization to purchase ten new 250 watt street light fixtures at approximate cost of $70.00 each. This does not include installation cost.It is planned to install them where most urgently needed. 2.Committee gave approval for purchase of one new oil circuit reclosure switch which will replace the one which has been in service on the South line near El Rancho.Estimated cost: $1,600.00 3.Committee gave approval for Sweetland to purchase a new cal culator and trade in the one now in use. 4.Sweetland explained to the Committee the possibility of abondoning about one and one-half mile of the Town’s primary system located near Stead’s Ranch and located within National Park boundaries.Two Town customers would be affected and subsequently served by the National Park system if such an agreement should be found to be beneficial or desirable by both government agencies. 5.A progress report was given to the Committee on data pro cessing for light and power bills.From all indications, the January billing will be prepared by the data processing center in Fort Collins.Mailing will be done locally.In order to properly adminster collections under the new system, it would be most effectively accomplished under a new and slightly different policy (resolution or ordinance)recommend ed to read as follows: Bailey 1/15/68 —2— Light and Power Committee January 15,1968 BEGINNING JANUARY 1968,ALL LIGHT AND POWER BILLS WILL BE MAILED APPROXIMATELY ON THE FIRST DAY OF EACH MONTH AND BECOME AUTOMATI CALLY DUE AND PAYABLE BY THE TENTH DAY FOL LOWING.IF NOT PAID BY THE TWENTY-FIFTH DAY OF THE MONTH,A NOTICE WILL BE MAILED DECLAR ING THE BILL DELINQUENT AND SHOWING SERVICE WILL BE DISCONNECTED AS OF THE TENTH DAY OF THE FOLLOWING MONTH.NO FURTHER NOTICE WILL BE MADE. IF SERVICE IS DISCONNECTED FOR FAILURE TO PAY BILL,A CONNECT CHARGE IN THE AMOUNT OF $2.50 IN ADDITION TO PAYMENT IN FULL OF THE BILL,WILL BE REQUIRED BEFORE SERVICE IS RE SOTRED. The above proposal is about the same policy as we are now using from the stand point of time allowed the customer for making payment.The main difference is that the method now in use is based on no more than sixty days credit which has to be figured individually;whereas the new policy,as outlined above,applies directly to a specific service bill which required no figuring and is more readily understood by the consumer There being no further business,the meeting was adjourned. io;j1 uF E3 Bailey 1/15/68