RECORD OF PROCEEDINGS
Light and Power Committee Meeting
Nay 4,1973
Committee:Chairman Petrocine;Trustees Wagner and Burgess
Attending:Trustee Wagner
Also Attending:Town Administrator Hill,Superintendent Dekker,
Business Office Manager Duncan,Engineer Van Horn
Absent:Chairman Petrocine;Trustee Burgess
LIGHT &POWER SERVICE BUILDING:
Superintendent Dekker presented a copy of the newspaper ad requesting
proposals for various phases of work to be done on the Service Building
including excavation,plumbing,carpentry,electrical,heating and con
crete work.Superintendent Dekker also presented a copy of the architect’s
foundation detail drawings and explained a necessary change from the
original plan.The Committee recommends that Superintendent Dekker proceed
according to plan.
SERVICE BUILDING CONTRACT FOR STRUCTURE:
Superintendent Dekker advised that a contract has been executed with
Burton Builders for a steel building to be erected on a prepared foundation.
RODEO GROUNDS P.A.SYSTEM:
Superintendent Dekker presented a proposal to revamp the entire PA.
system at an estimated cost of about $1,500.00.The Committee recommends
approval.
BARN LIGHTS CONVERSION COSTS-RODEO GROUNDS:
Superintendent Dekker advised that fire proof bulb enclosure assemblies
will cost $5.53 each.The number required is 70 and labor to install
will amount to approximately $75.00.The Committee recommends approval.
SOUTH LINE UNDERGROUNDING COSTS:
Superintendent Dekker reported that the cost for duct,not including
cement,for undergrounding 1,243 feet in a joint project effort with
Mountain Bell,will amount to approximately $10,000.00.The Committee
recommends proceeding.
STORM TROUBLE COSTS:
Superintendent Dekker reported that the trouble caused by snow April 24
and 25,1973,cost the department approximately $1,000.00 to repair.
POWER LINE DAMAGE CAUSED BY TRUCK:
Superintendent Dekker reported that replacing a primary pole and re
pairing three spans of wire resulted in billing the trucking firm
$929.71 for the damage on May 2,1973.
There being no further business,the meeting adjourned.