Chairman Petrocine,Trustees Burgess and Wagner
Chairman Petrocine,Trustee Wagner
Town Administrator Hill,Director of Light &Power
Dekker,Assistant to the Light &Power Director
Engelhardt,and Tom Radnoti of Miner and Miner,Con
sulting Engineers,Inc.
Trustee Burgess
MARYS LAKE SUBSTATION -TRANSFORMER AND SWITCHGEAR BIDS:
Mr.Radnoti of Miner and Miner,Consulting Engineers,Inc.read aloud
the following submitted bids for the Marys Lake Substation Transformer
and Switchgear:
TRANSFORMER BIDS
SWITCHGEAR BIDS
Bidder
Abbott Power Corporation
Hamilton Associates,Inc.
Allis-Chalmers
Gould,Inc.
Electric Power Equipment Co.
Empire Electric Sales,Inc.
Ryall Electric Supply Co.
Golden Gate Switchboard Co.
E.A.Pedersen Co.
Systems Control Corporation
N (Alternate)
Graybar Electric Co.,Inc.
Base Bid
$67,514
72,946
89,190
67,650
64 ,689
69,673
85,348
68,000
65,100
73,697
63,898
66,105
Preliminary
Base Bid
Adjusted *
$68,339
73,771
90,015
66,358
68,514
70,498
86,173
68 ,000
65,100
73,697
63,898
66,930
Delivery
Date
9/15/77
9/30/77
24 wks
20-26 wks
8/10/77
9/1977
34 wks
7/18/77
8/15/77
22 wks
22 wks
9/01/77
*Preliminary adjustments include items such
escalation,and additional shipping costs.
as service engineer’s time,
Total Cost
Base Bid of LossesBidder
G.F.Supply Co.
RTE
Ryall Electric
Supply Co.
Graybar Elec
tric Co.,Inc.
Preliminary
Adjusted
Price*
$105,578
108,000
99,085
102,203.10
Total Base
Bid with
Losses
$133,788
128,652.80
123,789
$28,210
20,652.80
24,704
28,210
$142,660.35
131,225.85
133,338.45
Delivery
Date
24 wks
30 wks
8/1977
24 wks130,413.10 139,116.70
BRADFORD PUEIJSHING CO.,DENVER R E C 0 R D 0 F P R 0 C E E D I N G S
Light and Power Committee
January 6,1977
Page Two (2)
The Committee acknowledges receipt of the above stated bids and will
make a final recommendation to the Board of Trustees at the January
11,1977 Special Light &Power Committee meeting at which time the
Committee will receive the Consulting Engineer’s recommendation.
There being no further business,the meeting adjourned.