CABLEVISION REPORT:
Town Administrator Dale Hill reviewed a Memo dated August 20,1982,
submitted to the Light and Power Committee from Director Dekker
and Town Administrator Hill.This memo is attached to and made
a part of these proceedings.Mr.Wayne Unze,President of Cablevision,
and Mr.John Kenmeir,Manager of Cablevision,were present to respond
to the memo.The comments are as follows:
7 D -Director Dekker stated that the pole audit is scheduled
to begin on September 13th and would take 4-6 weeks
to complete.Mr.Unze requested that John Kenmeir not
be required to be present all the time.Director Dekker
agreed but stated that there were times when it would
be necessary to have Mr.Kenmeir there.
8 A —Mr.Unze stated that they would have a proof of performance
for 1982 after year-end.
8 D -Mr.Unze stated that a copy of the equipment purchase
order had been given to Director Dekker.Director Dekker
concurred.
8 E —The emergency audio override has not been done.Mr.
Unze stated they would be putting more effort in getting
this accomplished.They hope to have this working within
the next two months.
9 A —Mr.Unze stated they have some flood funds which will
be allocated for new antenna equipment.Mr.Unze requested
more power and Director Dekker agreed to discuss this
with him.
9 B -Same as 9 A.
9 C -A former employee had been putting complaints into his
glove compartment —he has since been terminated.
11 A -Same as 9 C.
11 D -Same as 9 C.
19 E -This has been true,but they will comply with the
regulations from this point on.
21 -They will comply.
26 -Mr.John Kenmeir stated that he had brought in maps
for Public Works Director Widmer to review and that
the maps for the new system would be brought in when
they are available.
0 0
BRADFORD PUBLJSHING CO.,DENVER R E C 0 R D 0 F P R 0 C E E D I N G S
Mr.Unze reported to the Committee that Cablevision will be putting
up a new building which will house the stand-by power equipment.
Town Administrator Hill informed the Committee that according to
the Permit,they would need to either give Cablevision an extension
or assess a penalty for the deficiencies.The Committee recommends
giving Cablevision an extension until January 1,1983,to correct
the deficiencies but made it clear that this would be the last
extension given.Any further deficiencies would be assessed a
penalty.
The Committee received a letter from Mr.Unze dated August 13,1982,
requesting a new pole rate of $1.90 per pole per year.The Committee
recommends waiting until after the pole audit to determine what
the pole rate should be.
RESIDENTIAL DEMAND CHARGE INQUIRIES:
Mr.Kevin Colleran appeared before the Committee to express his
displeasure with the new “demand charge”electric rates.Mr.
Colleran explained that he had recently purchased a condominium
and was being charged a demand rate which had been established by
the builder.Director Dekker explained that this was a PUC regulation
and as such,the Town did not have any control over this situation.
The Committee concurred that they could do nothing to help Mr.
Colleran.Director Dekker suggested that when the rate consultant
comes up again,they have him look into this situation.
1983 BUDGET:
The draft of the 1983 budget was presented to the Committee for
their review.
REPORTS:
Director Dekker reported on the progress that has been made since
the flood.
1982 KWH sales through July were 35,536,065 compared with 30,630,089
for the same period in 1981 —an increase of 16%over last year.
August 1982 KWH sales were 4,712,309 compared to August 1981 sales
of 5,133,380 —a decrease of 8.2%.There is an increase of 11.14%
for sales during the first eight months of 1982.
Director Dekker reported that the Mutual Aid Agreement has been
revised to meet our attorney’s requests.It will be presented to
the Committee when it is finished.
Rawhide Power Plant is on schedule.