Loading...
HomeMy WebLinkAboutMINUTES Light and Power Committee 1984-07-05a BRADFORD PUBLSHINGCO.RECORD OF PROCEEDINGS V Light and Power Committee July 5,1984 Committee:Chairman Graves,Trustees Laing and Brown Attending:Chairman Graves,Trustee Laing Also Attending:Mayor Dannels,Trustee Hix,Town Administrator Hill,Liqht and Power Director Dekker,Clerk O’Connor Absent:Trustee Mark T.Brown FALL RIVER HYDRO PLANT -CASCADE DAM: As recommended by the Committee June 18,1984,Mayor Dannels wrote a letter to the National Park Service advising the Town will try to inform them within sixty days whether or not the Town will rebuild Cascade Dam.The decision in part will be based upon additional work performed by Warzyn Engineering through their proposal which includes:Sediment Transport Analysis, Additional Stream Flow Analysis,Review of Plant Records, Preliminary Diversion Structure Design,Project Cost Update, Update Benefit—Cost Figures,and Produce and Present Report,for a fee of $4,500 -$5,500.Discussion followed regarding the possibility of this proposal being added to a “DSR”,flexible funding and the effect this project would have on the Fall River Water Treatment Plant.The Committee recommends the Light and Power Department be authorized to proceed with Warzyn’s Proposal to further determine the outcome of the hydro plant and dam. HIGHWAY LIGHTING: Director Dekker gave a brief report on additional street lighting on South Saint Vram,Beaver Point and Highway 34.Following discussion,the Committee recommends Director Dekker submit street lighting plans and budget sheets for each lighting sec tion. REPORTS: 1984 KWH Sales for January through June indicate a 10.5%increase over 1983. Elkhorn Avenue street lights,which have been shipped to date, are installed and operating. The Light and Power Service Building approaches require rebuild ing again with an approximate cost of $2,000.00. There being no further business,the meeting adjourned. Vickie O’Connor,Town Clerk 0 ]UL101984 I ‘C r TF(JSTrES 44...