HomeMy WebLinkAboutMINUTES Utilities Committee 2008-02-21RECORD OF PROCEEDINGS
Town of Estes Park,Larimer County,Colorado,February 21,2008.
Minutes of a Regular meeting of the UTILITIES COMMITTEE of the Town
of Estes Park,Larimer County,Colorado.Meeting held in the Town Hall in
said Town of Estes Park on the 21st day of February 2008.
Committee:Chairman Homeier,Trustees Newsom and Pinkham
Attending:Chairman Homeier and Trustee Pinkham
Also Attending:Town Administrator Halburnt,Deputy Town Administrator
Richardson,Director Goehring,Finance Officer McFarland,
Asst.Utilities Dir.Mangelsen,Town Clerk Williamson
Absent:Trustee Newsom
Chairman Homeier called the meeting to order at 8:05 a.m.
PUBLIC COMMENT
None.
LIGHT &POWER DEPARTMENT
Rebar Tree LED Upgrade —Request Approval.
The Town owns and operates 120 rebar Christmas trees that are placed on light poles
throughout Town and two season’s greetings Christmas displays.These displays
presently utilize incandescent bulbs which consume large amounts of energy.These
incandescent bulbs have on the average a 3,000 hour burn time and cost $.25/ea.
Through technology,another bulb is now available on the market that consumes much
lower amounts of energy.This bulb,the LED,has an 80,000 hour burn time but costs
$1 .25/ea.During last year’s Christmas season,two rebar trees were equipped with these
LED energy saving bulbs on a trial basis.With environmental concerns and global
warming issues being paramount in today’s society,it is important to reduce greenhouse
gas emissions whenever possible.Therefore,staff requests approval to purchase LED
bulbs to install in the rebar trees and the season’s greetings displays.After further
discussion,the Committee recommends approval to purchase LED bulbs for the
rebar trees and Christmas displays for a cost of $6,800 from #502-6501-560-2615
as budgeted.
Primary Wire Trailer —Request Approval.
The Light &Power Department budget includes $15,000 for a new primary wire trailer.
The trailer would be used for transporting primary power wire to the job site;the trailer
has a turret to better align the wire reel when un-spooling wire in tight areas.
Sauber Manufacting Company -Virgil,IL.
2008 Sauber Model #1519 Turret Wire Trailer $14,671
Freight $1,250
Bid Price $15,921
Sherman &Reilly Inc.-Chattanooga,TN.
2008 Sherman &Reilly Model TRT-172-6K-T Turret Wire
Trailer I f.o.b.factory Bid Price $18,500
Henry &Wright Corporation,-Cleveland OH.
2008 Henry &Wright Model #Single Turret Wire Trailer NO RESPONSE
The Committee recommends approval for the purchase of the primary wire trailer
from Sauber Manufacturing Company for a cost of $15,921 from #502-6501-560-26-
43 as budgeted.
RECORD OF PROCEEDINGS
Utilities Committee —February 21,2008 -Page 2
WATER DEPARTMENT
One-Ton Truck Purchase —Request Approval.
The 2008 Vehicle Replacement Fund budget includes $42,000 for the purchase of a new
1-ton truck w/utility body and crane for use in the Water Department.
Weld County Garage —Greeley CO.
2008 GMC K-3500 4x4 w/utility body $39,789
Spradley Barr Ford —Ft.Collins,CO.
2008 Ford F-350 4x4 w/utility body $40,078
Phil Long Ford -Colorado Springs,CO.
2008 Ford F-350 4x4 w/utility body $42,225
Transwest GMC -Henderson,CO NO RESPONSE
The used truck will be absorbed by the Fleet Department and used as a response
vehicle when equipment breaks down in the field.The Fleet Department will contribute
to the Vehicle Replacement Fund a prorated amount based on a trade in value of
$10,000.The Committee recommends approval for the purchase of a 2008 GMC
K-3500 4x4 wlutility body and crane from Weld County Garage for a cost of
$39,789 from #635-7000-435-3442 as budgeted.
System Development Charge Report —Request Approval.
HDR Engineering,Inc.(HDR)was retained by the Water Department in February of
2007 to prepare the water utility system development charges and water rights fees.
The objective of this study was to calculate cost-based fees for new customers
connecting to Estes Park’s water system.By establishing cost-based system
development charges,Estes Park will assure that “growth pays for growth”,and existing
utility customers will,for the most part,be sheltered from the financial impacts of
growth.
Estes Park currently has water system development charges,called water tap fees or
connection charges,which have not been updated since 1995.The water rights fees
were last updated in 2003.General industry practice recommends adjusting these fees
annually for changes in the costs of construction and to update the fees every three to
five years,or whenever comprehensive planning documents for the systems are
updated.Estes Park recently completed a financial plan for the utility and the
Evaluation of the Water Treatment Facilities.The fees are calculated in conformance
with regulatory requirements and are based on Estes Park’s planning and design
criteria.The charge is related to the impact the customer has on the system and the
benefit the customer derives from the system.The fee methodology uses a
replacement cost approach,meaning that as time increases,so does the cost to replace
the existing system.The fee methodology has both a “buy-in”and a “future”component
to the calculation.With the increases in the value of the existing system,and those
improvements needed to meet demand in the future,the fee is increasing accordingly.
These costs need to be included in the fee to ensure that existing customers are
sheltered from the impacts of growth.The report also recommends the fee is updated
annually to eliminate large increases.
After further discussion,the Committee recommends approval of the report and
setting an action item for the March 11,2008 Town Board meeting to discuss the
fee increases and setting a public hearing for the fee increases on April 22,2008.
0
RECORD OF PROCEEDINGS
Utilities Committee —February 21,2008 -Page 3
Reports
Light and Power
1 Light and Power Dept.Financial Report —Dir.Goehring and Finance Officer
McFarland reviewed the financial reports.
Water
1.Water Financial Report —Dir.Goehring and Finance Officer McFarland
reviewed the financial reports.
MISCELLANEOUS
Dir.Goehring stated this winter has been particular cold and windy.Typically the
department does not encounter service line freezes until later in the winter.This year
the department has received a number of calls and has had to turn on additional bleed
lines to keep lines from freezing.This can be very expensive for the customer.
Trustee Pinkham stated the Governor’s Energy Office has announced the launch of a
statewide residential Solar Residential Program.The GEO would partner with
interested cities,towns,utilities and nonprofits by offering matching grants of up to
$25,000 to develop local solar electric and solar domestic hot water rebate programs.
He questioned if the Utilities Department had investigated the program.Dir.Goehring
stated the department is also waiting to see if the legislators will require the utility to
allocate 2%of its annual budget for a rebate program.If not,during the next budget
cycle the department may request .5 to 1%be used to fund a local rebate program.
Trustee Pinkham questioned whether or not Platte River Power Authority (PRPA)is
investigating solar as a power source.Dir.Goehring stated PRPA is looking at all
renewable energy sources;however,currently wind energy is the most cost effective.
PRPA can produce renewable energy at one quarter the cost of a stand alone system.
In addition,the Town’s Organic Contract allows the Town to produce up to 50 Kwh of
renewable energy.
There being no further business,Chairman Homeier adjourned the meeting at 8:53 a.m.
Jaie Williamson,Town Clerk
APPROVED