Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
EPURA RESOLUTION 224
ccccRESOLUTIONNO.224ARESOLUTIONOFTHEESTESPARKURBANRENEWALAUTHORITYAWARDINGACONTRACTTOROCKYMOUNTAINCONSULTANTSTOPROVIDEDESIGNSERVICESFORTHEEASTELKHORNAVENUEPEDESTRIANTRAFFICSIGNALWHEREAS,theEstesParkUrbanRenewalAuthorityhastheresponsibilityfortheconstructionoftheEastElkliornAvenuepedestriantrafficsignal;andWHEREAS,timeisofessencetogetthesignalinstalledpriortoMemorialDay;andWHEREAS,RockyMountainConsultantshassubmittedaproposaltoprovidedesignservices.NOW,THEREFORE,BEITRESOLVEDBYTHEESTESPARKURBANRENEWALAUTHORITYTHAT:1.TheBoardofCommissionersoftheEstesParkUrbanRenewalAuthorityacceptstheattachedproposalfromRockyMountainConsultantsandherebycontractswiththemfordesignservicesfortheEastElkhornPedestrianTrafficSignalaspertheattachedproposal.2.Thecostofthiscontractshallnotexceed$4,520.ADOPTEDthis16thdayofJanuary1995.ESTESPARKURBANRENEWALAUTHORITYL-7L4-9Chairman/ATTEST:/%LSecretary C)(flROCKYMOUNTAINCONSULTANTS,INC.\._R437SouthSt.VramEstesPark,CO80517(303)586-2458Metro(303)825-8233Fax(303)825-8912‘Jovetuber28.1994ArtAndersenEstesParkUrbanRenewalAuthoritvTownofEstesParkP.O.BOX1200EstesPark.CO80517RE:PedestrianTrafficSignalonFastElkhornAvenueDearArt:Thankyoufortheopportunitytosubmitthefollowingscopeofservicesandcostofengineeringservicesforthepedestriantrafficsignalat350EastElkhornAvenue.TheprojectcallsfortheinstallationofapedestriantrafficsignaltoassistpedestriansincrossingEastEi.khornAvenueandalleviatetheneedforacrossingguardduringhight,rafficperiods.Placementofthesignals,polesandmastarmistobeperformedbytheTownofEstesParkwiththepurchaseandinstallationofthecontrollersbyColoradoDepartmentofTransportation.Adetaileddescriptionofthescopeofservicesfollows:1.Preparationofaplanandprofileconstructiondrawingandtechnicalspecificationsoftheproposedlightingsystemwithinstallationdetails.Thedesignwillrequireaminimumoffoursignals,providingoneperlane.Apolewit.hmastarmistohelocatedoneachsideofEastFikhornAvenuewithIwosignalssuspendedfromeachmastarm.ConduitwillbeplacedacrossFlkhornAvenuebeneaththestreetfortheelectricalwiring.2.MeetingswiththeTownofEstesParkandColoradoDepartmentofTransportationtocoordinateasmoothdesignprocess.3.PreparerequiredsubmittalstotheColoradoDepartmentofTransportationforapproval.4.Provideconstructionobservationservicesduringtheconstructionphaseoftheproject.CIVILANDENVIRONMENTALENGINEERING•PLANNING