HomeMy WebLinkAboutMINUTES Planning Commission 1994-11-15BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS
Planning Commission
November 15, 1994
Commissioners:
Attending:
Also Attending:
Absent:
Chairman Al Sager, Commissioners Mark Brown,
Harriet Burgess, Alma Hix, Edward Pohl and
David Thomas
Chairman Sager, Commissioners Brown, Burgess,
Hix, and Pohl
Community Development Director Stamey, Deputy
Clerk Kuehl
Commissioner Thomas
Chairman Sager called the meeting to order at 1:30 p.m.
1. MINUTES.
Minutes of the October 18, 1994 meeting were approved as
submitted.
2.DEVELOPMENT PLANS.
2.A. Development Plan 94-10, Lots 16 & 17, Crags Subdivision,
Johnson & Maria Lin/Applicant. Continued to the December 20th
meeting.
2.B. Development Plan, 94-11, Lot 1, Mount View Park and a
Portion of Meyer's Addition, Black Canyon Inn, Jim Sloan/
Applicant. Continued to the December 20th meeting.
2.C. Development Plan. 94-7. Lot 2, Block 5, Fall River
Estates, Darold and Lois Rohrbaugh/Applicants. Applicant's
representative Bill Van Horn reported the Applicants are
requesting approval to build commercial accommodations
consisting of one office/living quarters, and six single story
duplex units with associated parking and site improvements.
The lot size is 1.814 acres and is zoned C-0 Commercial
Outlying, with no existing use of the land. The major issue
regarding this development is a discrepancy between the FEMA
floodplain map and the map completed by Van Horn. Van Horn
offered to provide the technical analysis required if the Town
would submit the request to FEMA for the map amendment. The
Applicant would like approval of the project from the Town
prior to FEMA's review and modification. Van Horn stated that
FEMA had allowed the Town to do this during an EPURA project.
Director Linnane questioned the possibility of construction
during the revision process as FEMA's response may have a
major affect on this site.
Van Horn presented two parking configurations — one parallel
and one angle. The parallel parking spaces measure 10 feet by
20 feet and the angle spaces vary from 16 feet to 19 feet in
length. Commissioners noted two disadvantages of parallel
parking: planned traffic direction and the necessary
destruction of existing trees. The angle parking would save
trees, but would require a request to the Board of Adjustment
for a setback variance. The owners did not wish to do this as
it would delay their project. The construction of the parking
area and foot bridge will be included in Phase I and the walk
to the handicapped unit will be hard surfaced. Concerns of
the Commission were: (1) handicapped parking should be
BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS
r> November 15/ 1994 = Page 2
situated closer to the handicapped unit, and (2) offering only
two spaces for check-in creates the possibility of overflow
parking onto the access road.
Units 6A and 6B are located between the current river channel
and the former channel. It may not be advisable to place
buildings in this location as water continues to run in the
former channel. The full width of the old channel should be
shown on the plan. Van Horn reported that the Corps of
Engineers verified the location of Units 6A and 6B are outside
the wetlands and stated further that a berm can be built and
reinforced to protect the property. Staff stated that no fill
or excavation can occur in the wetlands. The wetlands area
should be fenced off and protected during construction. The
finish floor elevations for Units 6B, 6A should be raised
above 100-year flood elevation. Minimal changes are requested
in the natural features of the site, such as the large rock
outcropping and mature vegetation. Improvement Guarantees are
needed for both phases of construction.
The area for Units 3A and 3B appear level to the water line.
Van Horn explained that fill will be used in this area along
with a retaining wall constructed in the back of Units 2A and
2B. Director Stamey noted there are some restrictions to
using fill in the flood plain.
An extension to five years for project completion is obtained
through a Special Review of the Town Board.
A1 Work, 2700 Fall River Road, stated the following concerns:
(1) constructing a berm around Units 6A and 6B will protect
that property but force more water onto their property, and
(2) parking may overflow to their driveway. Van Horn assured
Mr. Work that the Corps of Engineers has reviewed the location
of Units 6A and 6B and the river flow will not be diminished
or altered. Parking will not overflow to Mr. Work's property
due to the steep bank between the two properties and the
availability of parking on the development property.
Director Stamey listed required information not shown on the
submitted plan: Proposed contours, outdoor lighting and sign,
number and location of handicapped accessible units and
parking serving those units, location of underground electric,
drainage, size and quantity of proposed plantings, parking
pavement. The proposed electric extension will be developer
expense and is required to show on the Development Plan.
Van Horn requested the Town approve the plan with the
condition that FEMA will revise the floodplain map to the
correct location. Director Stamey was unable to verify the
information submitted by Van Horn regarding the floodplain.
There does appear to be an error on the current map but the
extent of the error is unknown. Van Horn further requested
that permits be issued for Units lA through 3B while awaiting
FEMA approval. Director Linnane referred to the elevation of
Unit 3B. The southwest corner is 7,906 and the flood
elevation is 7,907.7. If phasing is acceptable, it is better
to be conservative in terms of safety and only include through
Units 2A and 2B in Phase I. Commissioners were concerned that
if construction was allowed in phases, the completion of the
project would become more difficult due to access constraints.
Van Horn has not been in contact with FEMA for an estimate on
the map revision time frame. Commissioner Brown was hesitant
to allow applicant to proceed with the impression that the
Planning Commission has accepted this plan when the health and
safety aspect, which is an important function of the Planning
Commission, has not been determined.
BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS
“Planning Commission/ November 15/ 1994 — Page 3
Director Stamey recommends that this item be continued to the
next meeting because the floodplain and required finished
floor elevations are not verified at this time. Linnane
requested Van Horn supply a hec 2 model and run cross sections
through the site to determine the floodway and floodplain for
review by FEMA. Van Horn is to acquire a letter from FEMA
approving construction prior to FEMA's decision. It was moved
and seconded (Brown-Hix) that consideration of this project be
continued to the December 20th meeting due to the uncertainly
of the floodplain, and it passed unanimously.
3.REPORTS.
The granting of a water service easement between the Kob1s and
the Glover's is necessary for the development of Twisted
Pines. Judith Kob reported that an agreement had been reached
between both parties regarding location of a new easement.
Director Stamey verified that prior to the issuance of a
building permit, an access permit from the State needs to
submitted.
There being no further business. Chairman Sager adjourned the
meeting at 3:02 p.m.
T
Tina Kuehl, Deputy Town Clerk