HomeMy WebLinkAboutMINUTES Estes Park Planning Commission 1999-03-16BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS
Estes Park Planning Commission
March 16,1999
Commission:
Attending:
Chair Al Sager, Commissioners Harriet Burgess, Stephen
Gillette, Alma Hix, Edward Pohl and David Thomas
Chair Sager, Commissioners Burgess, Gillette, A. Hix, Pohl
and Thomas
Also Attending: Director Stamey, Senior Planner Joseph, and Recording
Secretary Wheatley
Absent:None
Chair Sager called the meeting to order at 1:35 p.m.
1. MINUTES of the February 16,1999 were approved as presented.
ANNOUNCEMENT
For the benefit of those present, an announcement was made at this time that
the Development Plans for Lots 3 and 4, Block 4, Fall River Estates had been
withdrawn. As several people were there to discuss the recent fish kill that had
occurred shortly after construction had been performed in the Fall River near this
location, comments were made by Staff to clarify permitting requirements and
procedures. In the formal review process, problems that have occurred with an
earlier approved Development Plan cannot be related to the current
Development Plans under review. The Corps of Engineers regulates
construction activities in the river channel. The Municipal Code makes reference
that appropriate permits must be obtained from the Corps of Engineers prior to
commencing work. The Town requires a floodplain development permit based
on the Corps of Engineers permitting process and, in this case, one had not been
issued.
AUDIENCE COMMENTS: Ron Hildebrand, 635 B Steamer Drive, asked how the
Department of Wildlife is responsible if they were not advised. Staff noted that
the decision to involve the DOW in the permit process is usually made by the
Corps of Engineers. Rick Spowart from the Colorado DOW responded that the
Division does not have the responsibility of permitting, but rather limiting impacts.
Jim Tawney, owner of Ponderosa Lodge, noted that an anonymous letter had
been sent to lodge owners along Fall River to attend this meeting on the basis
that this development was having an impact on the overall nature of the Fall
River area. He was also concerned on a related matter with the pipe that was
draining into Lake Estes from another hotel development. Director Stamey
advised that that development was not located within Town limits but he would
follow up with the County regarding the drainage pipe.
2. SUBDIVISIONS
a. Pawnee Meadows Subdivision, West of Carriage Drive and
Highway 7, Scott Miller/Applicant. Staff has met and reviewed the
sidewalk construction that was required at the January 19, 1999
Planning Commission meeting. It is Staff’s opinion that the original
staff recommendation is reflective of a more consistent approach to
sidewalk development in that area.
BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS
Estes Park Planning Commission - March 16, 1999 Page 2
It was moved and seconded (Hix/Gillette) to modify the condition
of the Preliminary Plat of Pawnee Meadows Subdivision and it
passed unanimously with one absence with the condition to be:
1. “Preliminary street construction plans shall be prepared to a
level of detail sufficient to allow Town Staff to determine if the
proposed right-of-way width is adequate to accommodate future
design and construction of public pedestrian and bicycle
connections. The applicant shall submit these plans for Town Staff
review prior to submitting a Final Plat and related final construction
plans.”
(Commissioner Mark Brown has tendered his resignation and it has
been accepted by the Town Council.)
b. Preliminary Plat, Apache Acres Subdivision, Erickson’s
Addition to the Town of Estes Park, East of Cherokee Meadows
Subdivision, south of Majestic Pine, Don Darling/Applicant.
This is a proposal to subdivide 3.86 acres zoned R-S, Residential
into four lots. Each lot is to be restricted to one single family
residence by a note on the plat. Lots 1 and 2 will be zero lot line.
The existing residence is to have an addition to create a duplex that
will straddle the new property line in a zero lot line configuration. All
future access is to be restricted to Pawnee Court. The right of way
for Pawnee Court and the improvement guarantee for the road
construction from Cherokee Drive is to be a part of the Final Plat of
this Subdivision. Tom Scobell from Rocky Mountain Consultants
representing the applicant gave a summary. He advised they agree
to all of the staff recommendations; however, they had a concern
over vacating the access easement to the north as it was also used
by another property owner in the adjacent Steele Subdivision. If it
only applied to Apache Acres, it could be vacated. Senior Planner
Joseph reviewed staff report. Proposal is faithful to the
comprehensive plan and also to lot sizes which are typical of the
neighborhood. The portion of the public street that is the cul de sac
has not yet been dedicated so one of the assumptions is that at the
time of final plat, the participation of neighboring landowners will be
achieved to provide dedication of Pawnee Court. Staff recommends
approval of the Preliminary Plat with conditions.
AUDIENCE COMMENTS:
Rollie Hinze, neighbor to the east, pointed out that the notation
regarding the possible bike path goes through the wetland area. He
inquired as to setbacks along the east lot line. Zoning requires a 10
ft. setback from that lot line, but there is no required set back from
the wetlands.
Bernie Dannels asked for clarification regarding the access
easement being vacated. It is currently being used for Lot 1. The
subdivision plat will note that only the cul de sac is to be used for
vehicular access to the new subdivision.
It was moved and seconded (Gillette/Burgess) the Preliminary
Plat of Apache Acres Subdivision be approved with the
following conditions, and it passed unanimously with one absence.
BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS
Estes Park Planning Commission - March 16,1999 Page 3
1. A shared access easement for Lot 1 and Lot 2 shall be shown
on the Final Plat. A shared maintenance agreement for this
access shall also be provided with the Final Plat submittal. A
note shall be placed on the Final Plat restricting access to
Pawnee Court, and the existing drive to Lot 1 shall be
abandoned, removed and revegetated.
2. The existing utility services for the home on Lot 1 should be
located and shown on the Final Plat. Any of these service
lines that are to remain in service and that also cross onto a
neighboring lot shall be located within utility easements on the
Final Plat.
3. The Final Plat shall clarify the width of the utility easement to
be dedicated along the west line of the subdivision where a 25
ft. building setback is shown. The building envelopes and the
utility easements shall be clearly delineated and labeled on
the Final Plat.
4. Wetlands exist on the southern edge of Lots 3 and 4 outside
the proposed building envelopes, these wetlands shall be
shown on the Final Plat and be placed in an open space
outlet.
5. The Final Plat submittal for Apache Acres shall include the
following (provided it is not preceded by a Final Plat submittal
for Phase II of Cherokee Meadows):
(a) Legal description of the public street right of way to be
dedicated for all of Pawnee Court. This would be a joint
submittal and filing requiring the signatures of the owriers
and lien holders of the property from which the new right
of way is to be dedicated (Cherokee Meadows Phase II).
(b) Complete Construction Plans and Profiles for both water
main and street construction along Pawnee Drive and
Pawnee Court from Cherokee Drive to the end of the cul
de sac on Pawnee Court with associated engineer’s
estimate for construction costs to be included in the
improvement guarantee.
c. Final Plat, Sleepy Hollow Subdivision, a portion of the South 1/2
of Section 22, T5N, R73W, of the 6th P.M., Fall River Road, Tejas
IncyApplicant. Tom Scobell of Rocky Mountain Consultants
representing Tejas Inc. gave a summary of the project. There will be
shared access drives for Lots 1 & 2 and Lots 9 & 10. Shared
driveway maintenance agreements will be filed. They had no
exceptions to the conditions provided by Staff and all will be done
prior to going to Town Board. The name “Hollow Court may be
confusing per comments made by the postmaster so this will be
changed. In response to an inquiry during the Preliminary Plat
review, he stated that it was a 13% slope going up to Lots 5 and 6.
Senior Planner Joseph reviewed the staff report. The neighboring
property owners have failed to come to an agreement regarding the
potential widening of the bridge. There is a new note on the plat
which eliminates the possibility of widening the bridge to two lanes.
Staff recommends approval of the Final Plat with conditions. There
is still some question regarding the boundary line around the bridge
which may or may not lead to a revision. Town position is that it is
accepting the legal description shown on the plat since a
professional land surveyor has signed it. On the Final Plat, the
BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS
Estes Park Planning Commission - March 16,1999 Page 4
emergency access at the west end of the private street which
connects to Lot 5 should be shown. Senior Planner Joseph received
a phone call from owner Mr. Harris saying that Scott Dorman as fire
chief checked the access and found it usable for fire fighting access.
Mr. Dorman has verified that the existing bridge is adequate.
In response to Mr. Scobell’s inquiry as to the time frame for deeding
the bridge to the homeowners association or developer, Public
Works Director Linnane advised that it was uncertain. The actual
deeding would be done through the Town Attorney. The provision
simply states that they want to have the homeowners association
accept it if and when it is deeded.
AUDIENCE COMMENTS:
Mr. Jim Tawney of Ponderosa Lodge expressed his concern that the
emergency exit is not adequate and that there is still a disagreement
regarding the existing property line. He also inquired about the
provision for runoff. Mr. Scobell responded that the emergency
access and property lines have been reviewed and approved by the
proper authorities. Drainage was addressed in the construction
plans with ditch improvements along the south side of Sleepy Court.
It was moved and seconded (Thomas/Burgess) the Final Plat of
Sleepy Hollow Subdivision be favorably recommended to the
Board of Trustees subject to the following conditions, and it
passed unanimously with one absent.
1. The developer be responsible to construct and pave all of the
shared private drives located within “Outlet C” and for the
construction of the shared access drives serving Lots 1 & 2,
and Lots 9 & 10.
2. The general note #1 on the plat restricting the use of the lots
to single family residential shall be revised to read: “Zoning is
currently R-M, Residential Multi-Family. The lots depicted
herein are restricted to one single family residence per lot.”
3. In the event the Town Board takes action to transfer
ownership of the existing bridge to the developer or the
homeowners association they shall be obligated to accept the
ownership of the bridge.
4. The protective covenants shall be revised to provide for
maintenance of the roads and the bridge, including the
obligation to replace the bridge as noted on the Plat. All
general notes on the Plat that refer to the homeowners
association shall be incorporated by reference into the
protective covenants. The protective covenants shall also
contain adequate language stating that if maintenance of the
easements, the road or the access is neglected by the
homeowners, then the town can assess the lot owners and
use those funds to perform the maintenance.
5. The National Park Service label shall be removed from the
west boundary and the private owner be noted at this location.
6. A full 50 ft. radius be provided at the cul-de-sac right of way.
7. A note be added: “Outlets A and B are too high for water
service.”
BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS
Estes Park Planning Commission - March 16, 1999 Page 5
8. All recommendations concerning utilities contained in Bill
Linnane’s memo of March 5,1999 be complied with.
9. The property line boundaries in the vicinity of the one lane
bridge shall be reviewed in consultation with adjacent property
owners before going to Town Board.
10. The street name “Hollow Court” shall be changed.
DEVELOPMENT PLANS
a. Fall River Estates, Lot 3, Block 4, Fish Hatchery and David
Drive, Randy Collins/Applicant. - Withdrawn
b. Fall River Estates, Lot 4, Block 4, Fish Hatchery and David
Drive, Randy Collins/Applicant. - Withdrawn.
REPORTS
There were no Staff reports.
Commissioner Pohl made comment that the vicinity map is vague on
Apache Acres and the developments in the area that have occurred in the
last few years are not shown. Mr. Scobell advised they would make that
revision to the Final Plat.
ADJOURNMENT
There being no further business, Chair Sager adjourned the meeting at
2:50 p.m.
Meribeth Wheatley, Recording ^cretary