The purpose of this study session was to further discuss and refine the projects
previously identified as long-term EPURA projects.
Completion of Riven/valk
Parking/Transportation/Pedestrian Links
Moraine Avenue Redevelopment
Affordable Housing Development
Immediate Projects/Education/Policy
Other areas identified for consideration in 1999-2000 were:
• Prepare a land use plan for the Knoll and adjacent Town-owned space
including Bond Park. This plan will be the backbone of the downtown portion
of the linkage goal.
• Conduct a study evaluating and ranking potential affordable housing
locations. Potential land/development costs should be defined.
• Start the master plan for linkages from destination nodes to transportation,
parking and bike paths.
. Authorize a detailed existing conditions/topographic survey for the West
Elkhorn Riverwalk base maps.
• Master plan the West Elkhorn Riverwalk
• Develop the parking district concept for presentation to the Town Board.
The above projects were categorized into year 1999 projects and year 2000 projects.
RECOMMENDED 1999 PROJECTS
. Mountain Discovery Center - A possibie funding source for Kf d of
transportation system. A projected 400 parking spaces can be linked tr^^^he
downtown area. If indeed, parking on the Knoll inay be a™l'ab'en^h|! "ou“
be a convenient transit system station. The Developer has ™da a
commitment yet Economic studies are currently being completed. The
Chamber Resort Association will assist in educating/informing the public once
we have a firm commitment from the developer.
. Riverwalk - Survey (estimated at $50K) - Request bids as soon as possible.
The requests should be sent to companies both inside and outs'^® To^ e
The su^eys and base maps should be completed as so°" Posslbl®;.
su^ev^willbe complicated Cross sections of river should be done while the
river is lot (befrMay - at high water). The entire area should be surveyed
at one time.
BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS
Estes Park Urban Renewal Authority - January 20,1999 - Page 2
• Knoll Property - Work sessions needed to complete the Master Plan
(Willows, Bickle, Bond Park, Lot 8 Stanley Historic District). Time frame:
Summer/Fall (should begin by photo documenting the entire area). Other
issues include: view corridor, important areas to protect, and grading issues.
• Milestones for Affordable Housing: 1) Completion of Housing Survey by
Forward Estes Park Foundation, 2) Housing Authority’s Definition of their
Position, 3) Revisit the topic. EPURA should be the facilitator.
• Parking District recommendations - Review, discuss, and respond to the
Town Board.
RECOMMENDED 2000 PROJECTS
• Master Plan of circulation (assumption - we have a transit system in place
with defined route). The National Park and the Town of Estes Park are in the
process of developing a transportation plan study. A joint venture with Upper
Front Range might be appropriate. Circulation plans from previous years
could be used as a resource.
• Moraine Avenue Redevelopment - EPURA should act as facilitator.
• Complete a Master Plan of the Riverwalk
Another study session has been scheduled for February 3, 1999 at 8:00 a.m.
The next EPURA Board Meeting is scheduled for February 17, 1999 at 8:00 a.m.