HomeMy WebLinkAboutMINUTES Estes Valley Board of Adjustment 2004-05-04RECORD OF PROCEEDINGS
Regular Meeting of the Estes Valley Board of Adjustment
May 4, 2004, 8:00 a.m.
Board Room, Estes Park Municipal Building
Board:
Attending:
Chair Bill Horton, Members Chuck Levine, Wayne Newsom, Al
Sager, and Cliff Dill
Chair Horton, Members Levine, Newsom, and Sager
Also Attending: Director Joseph, Planner Shirk, Planner Chilcott, and Recording
Secretary Williamson
Absent:Member Dill
Chair Horton called the meeting to order at 8:00 a.m. The following minutes reflect the
order of the agenda and not necessarily the chronological sequence.
1. CONSENT AGENDA
a. The minutes of the April 6, 2004 meeting.
b. Portion of SE Va of the SE Va of Section 27, T5N, R73W
continue item to the June 1,2004 meeting.
Applicant request to
It was moved and seconded (Sager/Newsom) that the Consent Agenda be
accepted and it passed unanimously with one absent.
2- UNITS C. D, & E. RIVER BEND CONDOMINIUMS. 525 PINE RIVER LANE-
APPLICANTS: EDWARD & KIM BREHON. ROBERT & MICHELLE GROSS.
RAY & JANET BETKA - VARIANCE REQUEST FROM SECTION 7.6.E.1.A
(2)(b) AND SECTION 6.3.C.1 OF THE ESTES VALLEY DEVELOPMENT CODE.
Planner Chilcott reviewed the staff report. The applicants are requesting variances
to the Estes Valley Development Code to allow decks added to the nonconforming
Units C, D, and E to remain within the river setback. The decks did not require
building permits because they are not more than thirty inches above grade. There
are no special circumstances associated with this lot. Staff believes the decks will
not substantially alter the essential character of the neighborhood. The exiting
residences can continue to be used if the variance is not granted; however the decks
would need to be removed. Staff believes that sufficient discussion occurred with
the applicant about the nonconforming status of the residential use and the
prohibition of expansion of a nonconforming use for the applicant to be aware of this
Code requirement. These discussions took place with the review of a deck permit
for Unit A and review of the River Bend condominium map.
Chair Horton questioned if the decks where on the condominium map when it was
approved by the Town Board in 2002. Planner Chilcott responded that the decks
where not on the approved condominium map; however there where Limited
Common Elements (LCE) around each of the units.
Tom Fisher, 525 Pine River Lane Unit A, was present to represent the applicants.
He provided some history of the property. Mr. Fisher stated that he informed each
potential buyer that the cabins were nonconforming and changes to the footprint of
the cabin was prohibited. He does not feel the decks are an addition. The decks
were built within the LCE areas around each cabin. Mr. Fisher feels the decks have
enhanced the property and allow beneficial use of the area behind the cabins
nearest the river. He was told by the Building Department that a building permit was
not need if the decks were less than 30 inches off the ground. He stated there has
been miscommunication on both side.
Ed Brehon, 525 Pine River Lane Unit C, stated he spoke with the Building
Department and was told he did not need a building permit for the decks he was
proposing. He advised that the purpose of the decks is to provide access to elderly
and handicapped family members.
RECORD OF PROCEEDINGS
Estes Valley Board of Adjustment
May 4, 2004
Will Birchfield, Chief Building Official, advised the new International Residential
Code (IRC) will require permits for all decks once adopted by the Town. He stated
that staff may want to look at providing handouts or use permits to prevent this
situation from occurring in the future.
Ray Betka, 525 Pine River Lane Unit E, stated there are special circumstances with
this request due to the insufficient information provided and the fact existing
buildings are already within the setbacks. He also stated the decks help to provide
handicap access to the buildings.
Public Comment:
None.
Based on the fact staff and petitioner acted In good faith; the decks are not
detrimental to the neighborhood; 2 existing buildings are closer to the river
than the decks; the pedestrian path is crossing the river before it reaches this
area; and the Building Official will put in place a regulation to eliminate this
situation from occurring in the future it was moved and seconded
(Newsom/Levine) to approve a variance from Section 7.6.E.1.a (2) and Section
6.3.C.1 to allow decks on Units C (sixteen foot variance), D (seventeen foot
variance) and E (sixteen foot variance), River Bend Condominiums to remain
and the motion passed unanimously with one absent.
1. Compliance with the submitted plans.
2. Submittal of setback certificates from a registered land surveyor
demonstrating compliance with the setback requests.
3- M.ETES AND BOUNDS. 911 MORAINE AVENUE. APPLICANT: SHAWN MAY
zlYARIANCE request from section 4. TABLE 4-5 OF THE ESTES VALLEY
DEVELOPMENT CODE. '—---------------------------- valu=y
Planner Chilcott reviewed the staff report. This is a request for a twenty-five foot
variance from the twenty-five foot front yard setback to build a handicapped
accessible entrance. At 14,220 square feet, the lot is undersized for “CO” zoninq
district. The building was built in 1937 and the location of the building on the site
also creates special circumstances. The building encroaches onto the property to
h®, eaf^t' a encroaches into the twenty-five foot front and fifteen foot side yard
setbacks with the eave encroaching into US 36/Moraine Avenue right-of-way The
proposed addition will not substantially alter the essential character of the
neighborhood or affect the delivery of public services.
Shawn Mays, the applicant, was present. He stated he would like to provide
handicapj^d accessibility for his use and for future use. The ramp will not affect the
flow of traffic and will not extend any further than the current awning.
Public Comment:
None.
It was moved and seconded (Sager/Levine) to approve a twenty-five foot (25)
variance from the twenty-five foot (25) front yard setback to build a
handicapped accessible entrance to the building and the motion passed
unanimously with one absent. All variances granted by the Board of
Adjustment shall become null and void If a Building Permit has not been
issued and paid for, and the work commenced within twelve (12) months from
the date the variance is granted.
1. Compliance with the submitted plans.
2. A registered land surveyor shall verify compliance with the variance and
provide a setback certificate.
I. REPORTS
Director Joseph stated the Bylaws have been approved by the Town and Countv
Commissioners.
RECORD OF PROCEEDINGS
Estes Valley Board of Adjustment
May 4, 2004
Chair Horton welcomed Board Member Levine to the Board.
There being no further business, Chair Horton adjo\i ed the m^ing at 9:20 a.m.