Loading...
HomeMy WebLinkAboutMINUTES Estes Valley Board of Adjustment 2001-12-04BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS Regular Meeting of the Estes Valley Board of Adjustment December 4, 2001, 8:00 a.m. Board Room (Room 130), Estes Park Municipal Building Board: Attending: Chair Jeff Barker, Members Joe Ball, Judy Lamy, Wayne Newsom and Al Sager Vice Chair Sager, Members Lamy and Ball Also Attending: Director Joseph, Planner Shirk and Recording Secretary Wheatley Absent:Chair Barker and Member Newsom Vice Chair Sager called the meeting to order at 8:00 a.m. 1. CONSENT AGENDA a. The minutes of the November 13,2001, meeting were accepted as presented. 2. LOT 22A. OLYMPUS HEIGHTS SUBDIVISION: TBD BELLEVUE DRIVE, APPLICANT: REX ROSS WALKER - SETBACK VARIANCE REQUEST FROM SECTION 4.3. TABLE 4-2 OF THE ESTES VALLEY DEVELOPMENT CODE Joe Coop of Van Horn Engineering was present representing the applicant. He confirmed that the third fence post (normally used by the Sanitation District) does not indicate a manhole or line within the property boundary. Upper Thompson Sanitation District has reviewed the plan and did not mention a problem. The Board recommended caution when digging in the vicinity of the post. Planner Shirk gave a brief recap of the staff report. This item was continued from the November 13, 2001 meeting to allow for the proper staking of the property. Public Comment: None. Based on staff findings. It was moved and seconded (Ball/Lamy) to approve a rear yard property line setback of 8 feet as opposed to a 15-foot setback as required in the “R” zoning district with the following conditions. Motion passed unanimously with two absent. All variances granted by the Board of Adjustment shall become null and void if a Building Permit has not been issued and paid for, and the work commenced within twelve (12) months from the date the variance Is granted. 1. A certificate prepared by a registered land surveyor shall be submitted at the foundation inspection. 2. Compliance with the submitted site plan. 3. LOT 17. BELLEVUE HEIGHTS SUBDIVISION: 2141 BIG THOMPSON AVENUE. APPLICANT: ROBERT K. GRAY - VARIANCE REQUEST FROM SECTION 4.3. TABLE 4-2 OF THE ESTES VALLEY DEVELOPMENT CODE William Kizer, contractor, was present representing the applicant. He confirmed that the deck encroachment would be removed during construction. Planner Shirk reviewed the staff report. The applicant requests a variance to allow for a side yard setback of 2 feet in lieu of the 10 feet required by the EVDC in order to build a kitchen addition. The Larimer County Building Department has made recommendations regarding a fire wall construction, foundation ^d prior electrical building permits. These have been incorporated into the conditions of approval. It is Staffs opinion the location and orientation of the original cabin and the location of the existing kitchen combine to create special circumstances BRADFORD PUBLISHING CO.RECORD OF PROCEEDINGS Estes Valley Board of Adjustment December 4,2001 Page 2 associated with this lot; however, the existing use of the property could continue. Due to the relatively small scale of the proposed addition, It Is Staff’s opinion the variance request is not substantial and the essential character of the neighborhood would not change. The Applicant has owned the property since at least 1991. At that time, the setbacks were 7 feet. The proposed addition could not be built without the requested variance. Mr. Kizer confirmed that the State Electrical Inspector did sign off on the electrical permits noted in the Larimer County Building Department memo. He also confirmed that the roof overhang will not go over the property line. The floor plan will be revised to accommodate the required fire wall. Public Comment: None. Based on staff findings, it was moved and seconded (Lamy/Ball) to approve a side yard property line setback of 2 feet as opposed to a 10-foot setback as required in the “R” zoning district with the foiiowing conditions. Motion passed unanimousiy with two absent. Aii variances granted by the Board of Adjustment shaii become nuii and void if a Buiiding Permit has not been issued and paid for, and the work commenced within tweive (12) months from the date the variance is granted. 1. Prior to pouring a foundation, submittal of a setback certificate prepared by a registered land surveyor. 2. Compliance with the submitted site plan. 3. A certificate prepared by a registered land surveyor verifying that roof overhangs do not extend beyond the property line and the deck does not encroach on the adjoining property shall be submitted to the building official at final inspection. 4. Construction materials shall be similar to the existing structure. 5. As per Larimer County Building Department: a. The foundation shall be stamped by a Registered Structural Engineer (to verify that the addition and existing structure will react properly together, and to verify that the new structure loads are properly supported without adding any structural stress to the existing older structure). b. The proposed addition shall be built to UBC fire rating. c. The Larimer County Wildfire Coordinator shall be consulted prior to submittal of building permit application. d. Prior to issuance of building permit, proof shall be provided that final electrical approval was obtained under Permits 95-E3505 and GO­ BI 897. 6. REPORTS None. There being no further business. Vice Chair Sager adjourned the meeting at 8:29 a.m. Al Sager, Vice Chair Merlbeth Wheatley, Recordin^^Secretary