Loading...
HomeMy WebLinkAboutORDINANCE 16-76ORDINANCE NO./t—74 AN ORDINANCE AMENDING SECTIONS 13.12.010, 13.12.020 C,13.12.030 C,13.12.040 C, 13.12.050 C AND D,13.12.060 C AND D, 13.12.070 B AND 0,13.12.080 C AND D,AND 13.12.090 C OF THE MUNICIPAL CODE OF THE TOWN OF ESTES PARK,COLORADO,RELATING TO LIGHT AND POWER RATE SCHEDULES CONTAINING CHARGES FOR THE SERVICE OF ELECTRIC POWER AND ENERGY BY THE LIGHT AND POWER DEPARTMENT OF THE TOWN OF ESTES PARK,COLORADO. BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE TOWN OF ESTES PARK,COLORADO: Section 1.Sections 13.12.010,13.12.020 C, 13.12.030 C,13.12.040 C,13.12.050 C and D,13.12.060 C and D,13.12.070 B and 0,13.12.080 C and D,and 13.12.090 C of the Municipal Code of the Town of Estes Park,Colorado, are amended to read as follows: 13.12.010 Generally.The schedules of rates set forth in this chapter for the service of electric energy by the Town of Estes Park shall remain in effect until repealed or amended. 13.12.020 C.Rate: The first 30 kwh per month $2.48 The next 20 kwh per month, per kwh at .08242 The next 50 kwh per month, per kwh at .05542 The next 200 kwh per month, per kwh at .03042 All additional kwh used per month,per kwh at .02462 Minimum —Net minimum charge per meter per month 2.48 13.12.030 C.Rate: The first 30 kwh per month $2.48 The next 20 kwh per month, per kwh at .08242 The next 50 kwh per month, per kwh at .05642 The next 150 kwh per month, per kwh at .03042 The next 250 kwh per month, per kwh at .02142 All additional kwh used per month,per kwh at .02462 Minimum -Net minimum charge per meter per month 2.48 13.12.040 C.Rate: The first 100 kwh per month----$7.06 The nextl50 kwh per month, per kwh at .03142 The excess kwh per month,per kwh at .02142 Minimum per month 7.06 13.12.050 C.Rate:For all energy used between meter readings taken approximately between May 20th and September 20th,the rate shall be: First 22 kwh used per month----$2.66 The next 78 kwh used per month,per kwh at .09842 The next 100 kwh used per month,per kwh at .07342 The next 800 kwh used per month,per kwh at .06442 The next 1500 kwh used per month,per kwh at .04842 The next 2500 kwh used per month,per kwh at .03642 All additional kwh used per month,per kwh at .02672 For all energy used between meter readings taken approximately between September 20th and May 20th,the rate shall be: First 23 kwh used per month----$2.66 The next 77 kwh used per month,per kwh at .08742 The next 100 kwh used per month,per kwh at .04642 The next 800 kwh used per month,per kwh at .04142 The next 2000 kwh used per month,per kwh at .03342 All additional kwh used per month,per kwh at .02672 —2— n Section 2.Except as herein specifically amended, Title 13 and all ordinances or parts of ordinances of the Municipal Code of the Town of Estes Park relative to the Light and Power Department shall be and are hereby designated to remain in full force and effect and are hereby ratified, confirmed and approved. Section 3.The Board of Trustees hereby authorizes the Town Clerk and other officials of the Town to file with the Public Utilities Commission of the State of Colorado such documents and to take such action,including the employment of personnel and the payment therefor,as may be required to obtain the approval of said Public Utilities Commission as may be required under the applicable law,but subject only to such jurisdiction as may exist in the Public Utilities Commission relative to service provided outside the municipal boundaries of the Town. Section 4.The Board of Trustees of the Town of Estes Park,Colorado,herewith finds,determines and desig nates that this ordinance is necessary for the immediate preservation of the public peace,health and safety,for electric rates affect the public peace,health and safety; and whereas,in the opinion of the Board of Trustees,an emergency exists,this ordinance shall take effect and be in force as of the first electric billing period commencing after July 2,1976,or as of the first billing period commenc ing after the final approval of the rates set forth in this ordinance relative to the service provided outside the municipal boundaries of the town is obtained from the Public Utilities Commission of the State of Colorado,whichever date is the later to occur,and after its final passage, adoption and publication. PASSED BY THE BOARD OF TRUSTEES AND SIGNED THIS 25th DAY OF MAY,1976.- Mayor TOWN OF ESTES PARK,COLORADO5: AT Town —4—