HomeMy WebLinkAboutORDINANCE 16-76ORDINANCE NO./t—74
AN ORDINANCE AMENDING SECTIONS 13.12.010,
13.12.020 C,13.12.030 C,13.12.040 C,
13.12.050 C AND D,13.12.060 C AND D,
13.12.070 B AND 0,13.12.080 C AND D,AND
13.12.090 C OF THE MUNICIPAL CODE OF THE
TOWN OF ESTES PARK,COLORADO,RELATING TO
LIGHT AND POWER RATE SCHEDULES CONTAINING
CHARGES FOR THE SERVICE OF ELECTRIC POWER
AND ENERGY BY THE LIGHT AND POWER DEPARTMENT
OF THE TOWN OF ESTES PARK,COLORADO.
BE IT ORDAINED BY THE BOARD OF TRUSTEES OF THE
TOWN OF ESTES PARK,COLORADO:
Section 1.Sections 13.12.010,13.12.020 C,
13.12.030 C,13.12.040 C,13.12.050 C and D,13.12.060 C
and D,13.12.070 B and 0,13.12.080 C and D,and 13.12.090
C of the Municipal Code of the Town of Estes Park,Colorado,
are amended to read as follows:
13.12.010 Generally.The schedules of rates set
forth in this chapter for the service of electric energy
by the Town of Estes Park shall remain in effect until repealed
or amended.
13.12.020 C.Rate:
The first 30 kwh per month $2.48
The next 20 kwh per month,
per kwh at .08242
The next 50 kwh per month,
per kwh at .05542
The next 200 kwh per month,
per kwh at .03042
All additional kwh used per
month,per kwh at .02462
Minimum —Net minimum charge
per meter per month 2.48
13.12.030 C.Rate:
The first 30 kwh per month $2.48
The next 20 kwh per month,
per kwh at .08242
The next 50 kwh per month,
per kwh at .05642
The next 150 kwh per month,
per kwh at .03042
The next 250 kwh per month,
per kwh at .02142
All additional kwh used per
month,per kwh at .02462
Minimum -Net minimum charge
per meter per month 2.48
13.12.040 C.Rate:
The first 100 kwh per month----$7.06
The nextl50 kwh per month,
per kwh at .03142
The excess kwh per month,per
kwh at .02142
Minimum per month 7.06
13.12.050 C.Rate:For all energy used between
meter readings taken approximately between May 20th and
September 20th,the rate shall be:
First 22 kwh used per month----$2.66
The next 78 kwh used per
month,per kwh at .09842
The next 100 kwh used per
month,per kwh at .07342
The next 800 kwh used per
month,per kwh at .06442
The next 1500 kwh used per
month,per kwh at .04842
The next 2500 kwh used per
month,per kwh at .03642
All additional kwh used per
month,per kwh at .02672
For all energy used between meter readings taken approximately
between September 20th and May 20th,the rate shall be:
First 23 kwh used per month----$2.66
The next 77 kwh used per
month,per kwh at .08742
The next 100 kwh used per
month,per kwh at .04642
The next 800 kwh used per
month,per kwh at .04142
The next 2000 kwh used per
month,per kwh at .03342
All additional kwh used per
month,per kwh at .02672
—2—
n
Section 2.Except as herein specifically amended,
Title 13 and all ordinances or parts of ordinances of the
Municipal Code of the Town of Estes Park relative to the
Light and Power Department shall be and are hereby designated
to remain in full force and effect and are hereby ratified,
confirmed and approved.
Section 3.The Board of Trustees hereby authorizes
the Town Clerk and other officials of the Town to file with
the Public Utilities Commission of the State of Colorado such
documents and to take such action,including the employment
of personnel and the payment therefor,as may be required to
obtain the approval of said Public Utilities Commission as
may be required under the applicable law,but subject only
to such jurisdiction as may exist in the Public Utilities
Commission relative to service provided outside the municipal
boundaries of the Town.
Section 4.The Board of Trustees of the Town of
Estes Park,Colorado,herewith finds,determines and desig
nates that this ordinance is necessary for the immediate
preservation of the public peace,health and safety,for
electric rates affect the public peace,health and safety;
and whereas,in the opinion of the Board of Trustees,an
emergency exists,this ordinance shall take effect and be
in force as of the first electric billing period commencing
after July 2,1976,or as of the first billing period commenc
ing after the final approval of the rates set forth in this
ordinance relative to the service provided outside the
municipal boundaries of the town is obtained from the Public
Utilities Commission of the State of Colorado,whichever
date is the later to occur,and after its final passage,
adoption and publication.
PASSED BY THE BOARD OF TRUSTEES AND SIGNED THIS
25th DAY OF MAY,1976.-
Mayor
TOWN OF ESTES PARK,COLORADO5:
AT
Town
—4—