Loading...
HomeMy WebLinkAboutPACKET Public Works, Utilities and Public Safety 2017-02-09Thursday, February 9, 2017 Public Safety, Utilities 8:00 a.m. & Public Works Committee Town Board Room 1. PUBLIC COMMENT 2. PUBLIC SAFETY a) RECOMMENDATIONS TO THE TOWN BOARD i. None. b) REPORTS i. Introduction of New Officer Matt Golon.Chief Kufeld ii. Report on 2016 Statistics.Capt. Pass iii. Estes Valley Crisis Advocates Annual Report Dir. Hankin iv. Verbal Updates and Committee Questions. 3. UTILITIES a) RECOMMENDATIONS TO THE TOWN BOARD i. None. b) REPORTS i. Verbal Updates and Committee Questions. 4. PUBLIC WORKS a) RECOMMENDATIONS TO THE TOWN BOARD i. Art in Public Places: 6 Pikas in the Park.Mgr. McEachern . b) REPORTS i. Public Works Annual Report.Dir. Muhonen ii. Space & Staffing Needs Assessment.Mgr. Landkamer iii. Verbal Updates and Committee Questions. 5. ADJOURN AGENDA 1 2 2/6/2017 Presented by: Captain Corey P. Pass February 9, 2017 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 2014 2015 2016 17880 14591 13446 Total CAD Stats (PD Only) 3 2/6/2017 1600 1650 1700 1750 1800 1850 1900 1950 2014 2015 2016 1728 1903 1880 Police Report Numbers 0 50 100 150 200 250 300 350 400 450 Hit and Run Injury Non Injury Unknown Injury Total 53 29 271 8 361 79 38 282 8 407 83 36 275 5 399MOTOR VEHICLE ACCIDENTS 2014 2015 2016 2 MVA FATALITIES 4 2/6/2017 0 10 20 30 40 50 60 70 80 90 100 Cleared byArrest Cleared byExceptional Means In Suspense OtherIncidents Total Cases 41 10 77 65 49 12 10 10 81 42 26 16 13 97 INVESTIGATIONS 2014 2015 2016 CLEARANCE RATES: 2014 78% 2015 75% 2016 70% 15000 16000 17000 18000 19000 20000 21000 2014 2015 2016 20235 17217 20295 EPCC Total Calls for Service (All entities) 5 2/6/2017 0 100 200 300 400 500 600 700 800 900 2014 2015 2016 761 846 618 EMERGENCY MEDICAL DISPATCHED CALLS Changed Call Flow to allow for a quicker initial notification to first responders of medical incident. Implemented I AM RESPONDING software which enables quicker notification to Fire of incidents. In process of adding EMS. Creation of Pre-page system to unique agency partners: Allenspark Fire Pinewood Springs Fire Protection District Big Elk Meadows Fire Working towards providing double coverage during peak hours (10-12 hours per day). 6 2/6/2017 4500 4600 4700 4800 4900 5000 5100 5200 5300 2014 2015 2016 4813 5250 5071 911 Calls 40500 41000 41500 42000 42500 43000 43500 2014 2015 2016 41496 42157 43144 Administrative Calls 7 2/6/2017 45000 45500 46000 46500 47000 47500 48000 48500 2014 2015 2016 46309 47407 48215 Total Phone Calls 0 500 1000 1500 2000 2500 2014 2015 2016 2270 1284 2098.5 142 144 260 Restorative Justice Volunteer Hours and Community Members Served RJ Volunteer Hours Community Members Served 8 2/6/2017 4000 5000 6000 2014 2015 2016 5756 5233 5263 Auxiliary Volunteer Hours 7361.5 hrs 9 2/6/2017 10 2016 Annual Report 11 Dear Friends & Supporters, 2016 was a year of transition at EVCA. We said goodbye to our long-time leader, Mary Mesropian, and welcomed a new one, Dakota Hankin. We lost Lonnie Erskine, our talented, kind and empathetic counse- lor to a cross-country move so that she could be closer to her parents who needed her. In her stead, we welcomed two new counselors- Jess Smith and Brenda Wilkerson- who daily provide compassionate and committed support to those who walk through our doors. It was a year of transition on many fronts. When Mary Mesropian was hired in 2000, then board member Da- vid Hemphill recalled that it was clear that she was the most qualified candidate. During her 16 years with EVCA, Mary grew the organization from a staff of one and a half (one part time person) to a staff of seven- a mix of full time, part time and ten hour positions. Thanks to a successful capital cam- paign with many generous donors and a committed board, she helped oversee the purchase of a build- ing which now houses both the administrative offices and My Sister’s Place- a domestic violence safehouse. Mary also transformed the fundraising arm of the organization- moving from a Chili Cook- Off (which, while fun, raised about $3,000 at its zenith) to a Fashion Show Fundraiser (also fun but more lucrative!) to an Annual Dinner- EVCA’s most successful fundraising event in its history. As those of you involved with nonprofits know, fundraising and successful grant attainment are critical to the financial well-being of an organization. Mary’s successes yielded increased funding which in turn led to more community engagement through programs, and an increased and high quality staff who could offer more to people in crisis, like our talented bi-lingual outreach person. After many years of dedicated work, in December of 2016, Mary officially retired as the Executive Director. She clearly loved her work and cared deeply about advocacy and the people of the Estes Valley. Her vibrant spirit and passionate commitment will be missed. Mary’s leadership and growth of the organization, however, meant that replacing her would not be easy. With the level of expertise we required and the vetting we employed, you would think we were hiring the CEO of a large company! We, the board, knew that the future well-being of EVCA for years to come was our responsibility and we could not mishandle this process. In the end we were for- tunate to find and hire Dakota Hankin. In a full-circle moment, David Hemphill graciously agreed to serve on our search committee. He experienced a bit of deja-vu, as, once again, one candidate was the clear choice. The breadth and depth of Dakota’s experience in nonprofit and advocacy work is impressive and includes work with the International Rescue Committee (IRC) in Jordan, South Sudan, and Ethiopia. In her work with the IRC she helped implement and lead programs that fought gender-based violence. She most recently worked as a Program Director for the Spokane Aids Project and in 2016 she also consulted for the United Nations Foundation Family Planning 2020 program. She graduated with honors both as an un- dergraduate and as a graduate student- attaining her Masters in Social Work with an emphasis in Glob- al Practice from Boston College. Although she values her wide-ranging experience throughout the world, she grew up in a small town and wanted to return to one- hence her pull to Estes Park. Her nat- ural and visionary leadership ability along with her passion for EVCA and her commitment to the Es- tes community make her the perfect fit as our next Executive Director. As Dakota has a strong track record of taking healthy organizations to the next level, we look forward to seeing what the next evolu- tion of EVCA will bring. 12 We, the board thank the committed and talented staff and advocates of EVCA for their tire- less dedication to being there for those we serve. And, we thank you, our donors, friends, and sup- porters- who make the work of EVCA possible: 24/7 crisis advocacy for victims of crime and trau- ma; individual and support group counseling for men, women, teens, and children; bi-lingual out- reach; safehousing for survivors of domestic violence; and community education. Respectfully, Shellie Shellie Tressell, Board Chair Estes Valley Crisis Advocates & My Sister’s Place 13 2016 Board of Directors MISSION STATEMENT To provide advocacy services to survivors of crime and trauma including safehousing for domestic violence survivors, counseling, referrals and community education. Shellie Tressell, Board Chair Susan Anderson, Board Vice Chair Corey Pass, Board Secretary Pam Vendegna, Board Treasurer Alyssa Hanson, Board Member 14 Shannon DeJanes Administrator Asst. Safehouse Manager Jess Smith 2016 Volunteers Audri, Bruce, Carly, Cheryl, Leah, Lynn Ericka Santana Bilingual Outreach Carly Lober Advocate Leah Adams Advocate Brenda Wilkerson Counselor Mary Mesropian Executive Director 15 ESTES VALLEY CRISIS ADVOCATES’ PROGRAMS CRISIS ADVOCACY Volunteer advocates, trained and supervised by Mary Mesropian, 2016 Executive Director, attend 30 hours of training which includes domestic violence, sexual assault, death and suicide, and crisis intervention skills. An advocate is someone you can talk to in complete confidence. They have real information on vic- tim’s rights, useful information on police and court procedures and down-to-earth advice about victim’s compensation. They can also help ensure safety by creating a personal safety plan and securing a safe place to stay. Advocates understand what it is like to be a survivor of crime or trauma and provide gentle and caring emotional support. COUNSELING Brenda Wilkerson and Jess Smith are our 2 part-time Counselors who are available to provide individual counseling and support groups to assist survivors in recovering from trauma. They understands that once you have been a survivor, you are never exactly the same. Estes Valley Crisis Advocates follows a trauma informed care therapeutic model. Survivors of crime and trauma have basic human needs that have to be addressed. They need the opportunity to tell their story, to be protected from further violation, to have support and to have their psychological needs addressed. Our counselors address these psychological needs and assist them on their journey. SAFEHOUSE My Sister’s Place is a 3-bedroom facility and program focusing on non-violent living that provides safety in a confidential location. My Sister’s Place is equipped with three private bedrooms, a playroom, a kitchen, laundry room and large common area. We have two safehouse programs: 1) A 2-week emergency housing program where we offer short-term safety; and 2) A 6-week program that includes mandatory weekly counseling and advocacy sessions for adults and children. Residents chose which program they are most comfortable with. In 2015, the Safehouse Manager, Shannon DeJanes, focused on self-sufficiency, assisting in finding childcare, housing, and jobs with the goal of empowerment. Leah Adams and Carly Loeber, are our evening safehouse advocates. LATIN OUTREACH Estes Valley Crisis Advocates has a Bilingual Outreach Coordinator, Ericka Santana, to assist the Latino population in our community who find themselves in need because they are survivors of crime or trauma. Being a survivor of a crime and not being able to speak English makes it that much more frightening. “What’s going to happen to the offender?” “What do I have to do next?” “What about my kids?” These are questions many Latino survivors grapple with along with the many questions about visas, work and citizenship. COMMUNITY EDUCATION & OUTREACH While we spend most of our efforts aiding the recovery of survivors who have experienced abuse or trauma, we are just as committed to preventing it altogether. In fact, our hope is that someday there will no longer be a need for our services. We continued working with kids in the middle and high schools as well as Eagle Rock School. 16 Year in Review: In 2016 Estes Valley Crisis Advocates served 313 survivors. This included advocate calls and coun- seling and support group clients with a total of 1,115 contacts (not including safehouse residents). These clients were survivors of domestic violence, sexual assault, stalking, assault, unattended death, suicide, other crimes and trauma. 24 of them were children affected by the deaths of their classmates. Not only were the children affected but school personnel as well needed a safe place where they could talk. In 2016, we housed 25 women, 2 men and 17 children providing 678 bed nights. Residents re- ceived 751 sessions of counseling and advocacy focusing on safety planning and creating action plans to become self-sufficient and live violence free lives. In 2016, 36 adults attended educational presentations. In 2016, our bilingual advocate met with 36 Spanish-speaking outreach clients. Funding: In 2016 Estes Valley Crisis Advocates was funded through the Town of Estes Park, Larimer County Vic- tim Assistance and Law Enforcement Board, Colorado Domestic Violence Program, Federal Victims of Crime Act, Community Foundation of Northern Colorado (Estes Park), Presbyterian Community Church of the Rockies, United Methodist Church of Estes Park, Mount Calvary Lutheran Church, family founda- tions, individual gifts, fundraisers and fees collected from Colorado marriage license and divorce fil- ings. This year, our annual fundraiser raised $25,000.00 and $4,655.00 was raised from the end of the year annual appeal letter. We added the on-line giving program, Colorado Gives to our fundraising efforts in 2016 and raised over $5,807.00. We also had various fundraisers all year such as the Rotary Club Duck Race, the annual Wheel Bar Women’s Pool Tournament, and the Purple Night at the Roof Top Rodeo. We are so grateful for the individual donors, social and religious organizations for their many gifts in 2016. And to our wonderful yet anonymous donors, thank you too! $42,268.82 is being held in the Estes Valley Crisis Advocates’ Endowment Fund managed through the Community Foundation of Northern Colorado with the plan that one day it will create annual funding. Valley Crisis Advocates is a member of Colorado Coalition Against Domestic Violence, Colorado Organi- zation for Victim Assistance, Larimer County Domestic Abuse Intervention Project, Colorado Nonprofit Association, Estes Park Nonprofit Resources, and Bringing Justice Home, a legal program network. 17 Estes Valley Victim Advocates, Inc. Incident Report Overview January - December 2016 Incident First Contact Continuing Contacts Hotline Calls Total Contacts Domestic Abuse 110 6 116 232 Sexual Assault 4 0 3 7 Death/Suicide 87 7 5 99 Assault 4 7 1 12 Stalking 6 1 2 9 Other-Crime 8 2 3 13 Other –Non Crime 11 2 15 28 Counseling 29 470 7 506 Group Counseling 18 44 1 63 Bilingual Outreach 36 108 5 149 Total 313 647 158 1115 18 2016 MY SISTER’S PLACE SAFEHOUSE RESIDENT SUMMARY MONTH Women/children # of Nights Counseling/Advocacy Total Con- tacts January 5 Women 1 MC 74 6 Counseling 81 Advocacy 87 February 3 Women (New) 1 Woman (Cont) 1 Male (New) 20 4 Counseling 41 Advocacy 45 March 1 Woman (New) 2 Women (Cont) 1 FC (New) 16 4 Counseling 18 Advocacy 22 April 3 Women (New) 30 4Counseling 44 Advocacy 48 May 3 Women (New) 2 Women (Cont) 1 FC (New) 1 MC (New) 30 11 Counseling 108 Advocacy 119 June 7 Women (New) 4 FC (New) 4 MC (New) 30 19 Counseling 66 Advocacy 85 July 3 Women (Cont) 2 FC (Cont) 1 MC (Cont) 186 22 Counseling 92 Advocacy 114 August 2 Women (Cont) 1 Woman (New) 2 FC (Cont) 1 MC (New) 120 15 Counseling 48 Advocacy 63 Septem- ber 1 Woman (New) 1 Man (New) 1 MC (New) 59 16 Counseling 25 Advocacy 41 October 3 Women (New) 1 Man (New) 1 MC (New) 41 10 Counseling 35 Advocacy 45 November 2 Women (Cont) 60 8 Counseling 47 Advocacy 55 December 2 Women (Cont) 1 Woman (New) 3 FC (New) 12 6 Counseling 21 Advocacy 27 Totals 25 Women 2 Men 9 Female Children 8 Male Children 678 125 Counseling 626 Advocacy 751 19 PO Box 1287 Estes Park, CO 80517 970-577-9781 phone 866-295-3597 fax 970-586-4000 crisis 20 Memo To: PUP Committee Frank Lancaster, Town Administrator From: Brian Berg, Park Maintenance Supervisor Park Advisory Board Staff Liaison Date: January 25, 2017 RE: Art in Public Places: 6 Pikas in the Park Public Works Department Objectives: To confirm location recommendation to the Town Board for the locations and installment of six bronze pika statues donated by six separate individuals. Present Situation: The Town currently owns and maintains 12 bronze sculptures and 14 bronze benches. Proposal: 12 pika statues have been generously donated to the Town of Estes Park as part of the Pikas in the Park scavenger hunt program. The artist and staff have selected 12 locations, 6 of which are on Town owned property. Those 6 now fall under the Art in Public Policy (AIPP) and require your approval for final installation. The Parks Advisory Board voted to approve the artwork and locations with 6 voting yes and one member absent. Since this program has been discussed with the board in passed meetings with its support, staff is recommending this being added to the consent agenda as this is just the finalization of paper work from the donors. Advantages: The addition of the bronze Pikas in these selected locations around Town will provide fun, interactive art and will help contribute to a viable downtown keeping kids, families, art lovers and geocaches hunters entertained for years to come. These Pikas will increase the amount of public art the Town owns. 970-577-3587 publicworks@estes.org www.estes.org/publicworks ESTES PARK, CO 80517 www.estes.org 170 MACGREGOR AVE. P.O. BOX 1200 PUBLIC WORKS 2121 Disadvantages: The Town will incur the increased annual cost of maintenance for all twelve Pikas. The town would have the obligation to repair or replace any damaged or stolen Pikas. Budget: The Parks Division will have to increase their annual bronze cleaning budget for 2018 to accommodate these new statues. Level of Public Interest: Medium Staff and PAB Recommendation: Staff and PAB recommend to the Town Board, the acceptance of Art in Public Places: 6 Pikas in the Park and their locations to be installed by the Parks Division in early April, to be included on the Consent Agenda at the February 28, 2017 Town Board meeting. Attached: Power Point presentation including Pictures of 6 wax Pikas and their recommended locations. Map of approximate locations 22 2/6/2017 Pikas in The Park •6 Bronze Pika Sculptures are being recommended for your approval •Each have been donated individually •The Parks Division will install in early April •Mike Dwyer‐Artist Locations Around Town 23 2/6/2017 Town owned locations. •Muriel‐Planting bed outside of Rocket Fizz •Josie‐Along Riverwalk outside of Aspen and Evergreen •Joel‐On top of the wall outside the restroom at Children’s Park •Enos‐On the rocks by the big pond at George Hix Riverside Plaza •Cornelius‐On the brick planter on Elkhorn, outside the Barrel •Lord Dunraven‐On the rocks next to the picnic tables at Tregent Park Location 1‐Muriel 24 2/6/2017 Location 2‐Josie Location 3‐Joel 25 2/6/2017 Location 4‐Enos Location 5‐Cornelius 26 2/6/2017 Location 6‐Lord Dunraven Private locations, for informational purposes  only. •Freelan‐Outside the backdoor of Kind Coffee •Isabella‐On brick planter inside Barlow Plaza •Abner‐On top of the brick siding outside Village Goldsmith •Moomaw‐Off Marian Ave on the rock wall outside Wonderful Things •WT‐On the wood pillar outside of Rustic Mountain Charm •Addie‐On rock wall outside of 150 Lawn Ln 27 2/6/2017 Artist‐Mike Dwyer 2009 Chosen to design the 19th annual  Loveland Winter Holiday Arts Council  Ornament titled "Winter Friends". 2007 First Place‐Sculpture, 2007 Castle Rock,  Colorado ArtFest. 2006 Foothills Art Center, Golden, Colorado,  2006 Art Castings of Colorado Award for  the sculpture "Sprig". 2004 Avenues of Art, Gillette, Wyoming  People's Choice Award Winner ‐ "Quackers". 2004 "Quackers" purchased by City of Gillette,  Wyoming Mayor's Art Council. 2004 Received People's Choice Award for  "Quackers" at the 5th Annual Sculptures  in the Streets exhibit in Mesa, Arizona. 2004 City of Mesa, Arizona Permanent  Sculpture Panel purchased "Quackers" for  the city. 2001 Received Juror's Award for "Naptime" at  the Lines into Shapes National Juried  Show in Estes Park, Colorado. •Mike Dwyer Sculptures 1305 N. County Rd. 23 H Loveland, Colorado 80537 (970) 402‐2250 Email:mdsculptures@gmail.com 28 PUBLIC WORKS Report To: Public Safety, Utilities & Public Works Committee Town Administrator Lancaster From: Greg Muhonen, Public Works Director Date: February 9, 2017 RE: Annual Report Objective: The purpose of the annual report is to provide an overview of the Public Works Department 2016 activities and accomplishments that illustrate progress in fulfilling our mission to “protect the community trust earned as innovative & effective providers of award-winning parks, safe multi-modal streets, reliable equipment, and efficient buildings that support our unique mountain village.” Present Situation: The Public Works Department has a staff of 20 employees delivering core services in the following six Divisions: Administration (3), Engineering (3), Facilities (1), Parks (6), Streets (4), and Fleet (3). The Public Works Department managed the expenditure of approximately $11,154,859 of taxpayer dollars in 2016 (this does not include funds spent on the Downtown Estes Loop or the Transit Hub Parking Structure). Proposal: The 2016 Annual Report is provided for review and comment. Advantages: •Improved staff accountability for stewardship of taxpayer funds •Improved data to guide prioritization on services & spending •Increased transparency and trust-building with constituents Disadvantages: •Data gathering & reporting requires considerable administrative effort Action Recommended by Staff: The PUP Committee is asked to review the attached Annual Report and provide feedback to staff regarding overall content, the specific divisional performance measures reported, and guidance on desired content for the 2017 report. Budget: The 2016 operating expenses supported by the General Fund: Division Expenses Percent of Total 29 Engineering $224,555 6% Facilities $1,174,859 30% Parks $1,105,727 28% Streets $1,041,831 26% Fleet $ 398,689 10% TOTAL $3,945,661 100% The 2016 COMPLETED construction projects: Project Name Grant Funds Town Funds 2016 Budget Final Cost Over/Under 2013 Flood Repairs (Moraine Ditch, Brook Ct) $207,478 0 $207,478 $193,306 ($14,172) Elm Rd Drainage Improvements 0 $633,097 $570,000 $633,097 $63,097 Dry Gulch Road Rehabilitation 0 $4,221,341 $4,347,390 $4,221,341 ($126,049) Carriage Hills Dam Repair (construction) $780,000 0 $780,000 $777,455 ($2,545) Fall River Trail (Design) $337,000 0 $337,000 $337,000 0 TOTAL $1,324,478 $4,854,438 $6,241,868 $6,029,247 ($79,669) The 2016 projects supported by the 1A Sales Tax Revenue (Streets): Project Name 2016 Budget Final Cost Over/Under Administration $152,389 $152,389 0 Spray Patcher $130,079 $130,079 0 Crack Sealing $200,000 $199,974 ($26.00) Chip Sealing $200,000 $194,455 ($5,545) Overlays $523,000 $500,074 ($22,926) Material Testing $2,980 $2,980 0 TOTAL $1,208,448 $1,179,951 ($28,497) TOTAL DOLLARS MANAGED by PUBLIC WORKS in 2016 = $11,154,859 (this does not include funds spent on the Downtown Estes Loop or the Transit Hub Parking Structure). Level of Public Interest: Low Sample Motion: 30 None Attachments: 2016 Annual Report 31 32 Town of Estes Park Public Works Department ANNUAL REPORT 2016 33 Inside this issue: Public Works Overview 5 Public Works Funding 6 Facilities Division 7 Operations / Fleet 8,9 Streets Division 10,11 Parks Division 12,13 Pavement Management 14 Engineering Division 15 Estes Park Public Works Department Annual Report—2016 34 Page left blank intentionally 35 Estes Park Public Works Department Annual Report—2016 Town of Estes Park Mission: The Mission of the Town of Estes Park is to provide high-quality, reliable services for the benefit of our citizens, guests and employees, while being good stewards of public resources and our natural setting. Public Works Mission: The Estes Park Public Works Department protects the trust earned as innovative & effective providers of award-winning parks, safe multi-modal streets, reliable equipment, and efficient buildings that support our unique mountain village. Town of Estes Park Vision: The Town of Estes Park will enhance our position as a premier mountain community. Public Works Vision: We are a proactive, knowledgeable, respected team creatively improving community-driven services. Public Works Department Leadership Team Greg Muhonen Director 970-577-3581 gmuhonen@estes.org Kevin Ash Engineering Manager 970-577-3586 kash@estes.org Kevin McEachern Operations Manager 970-577-3604 kmceachern@estes.org Jon Landkamer Facilities Manager 970-577-3576 jlandkamer@estes.org Brian Berg Parks Division Supervisor 970-577-3783 bberg@estes.org Justin Kearney Streets Division Supervisor 970-577-3777 jkearney@estes.org Jim Nelson Fleet Division Supervisor 970-577-3603 jnelson@estes.org Megan Van Hoozer Administrative Assistant 970-577-3587 mvanhoozer@estes.org Carriage Hills / Scott Ponds Spillway—Post-Construction 36 “Great leaders do not desire to lead but to serve.” ~ Myles Munroe The Public Works Department consists of five Divi- sions: Facilities, Engineering, Streets, Parks, and Fleet totaling 20 employees. We exist to deliver the daily services desired by our residents as captured in our Vision and Mission statements. Public Works staff also serves as a technical resource to the citizen Parks Advisory Board and Transportation Advisory Board. The Public Works team is committed to leading by ex- ample to: establish rapport with our customers through attentive listening; earning respect by keeping our word and owning up to our mistakes; and building relationships by investing ourselves personally in serv- ing the civic needs of our customers. spent the next 20 years managing transportation infrastructure pro- jects and staff for the Larimer County Public Works Department and the City of Loveland Public Works Department. Prior to accept- ing a position with the Town of Estes Park, Greg worked 10 years as a private consultant developing three residential subdivisions in Loveland, Colorado. Public Works Director, Greg Muho- nen, has worked for the Town of Estes Park since July, 2014. He is a civil engineer, earning his degree from Stanford University and is a licensed Professional Engineer with the State of Colorado. Director Muhonen began his ca- reer by designing and inspecting road and utility projects in remote Alaskan villages for two years. He Director Muhonen is committed to transparently sharing the successes and struggles that have shaped his personal and professional life so the learning can benefit others. He has been an outstanding addition to this town. Estes Park Public Works Department Annual Report—2016 Public Works Leadership Public Works Overview “Strength lies in differences, not in similarities” ~Stephen Covey Quote from Town Administrator, Frank Lancaster, regarding Public Works leadership: “Under Director Muhonen’s leadership, all the divisions in the Public Works Depart- ment have developed a culture of innovation, service and dedication to the Town, our residents and our guests. The department is focusing on meeting the immediate needs of the community while anticipating and planning for the future as well.” Greg Muhonen Megan Van Hoozer 37 The Public Works Department op- erational costs are paid through the General Fund which is depend- ant on property tax and sales tax, permit and building fees. Public Works is always keeping eyes open for funding opportunities through state and federal grants which allows flexibility in design plans and ensures funding for high-need infrastructure projects, as well as replacement of bridges, street repair/maintenance, snow plow- ing , parks, buildings/facilities and fleet equipment. The Town of Estes Parks received only $.02 for each dollar paid for property taxes in 2015. Below is a chart reflecting the grants received in 2016 and the associated projects. Public Works Funding “There is no shortage of money, only a shortage of people thinking big enough.” ~ Grant Cardone Samantha Phillips, Flood Recovery Project Associate 2016 Grant Funded Projects Project Name Status Grant Title Amount Funding Agency Downtown Estes Loop IN PROCESS Devolution Hwy 36 for FLAP $4,200,000 CDOT FLAP Downtown Cuplet $13,000,000 CFL Highway Div. Transit Facility Parking Struc-ture COMPLETE Parking Structure—Impact Study $200,000 FTA IN PROCESS Parking Structure—Construction $3,000,000 FTA IN PROCESS Parking Structure—Construction $329,000 FHWA—CMAQ thru FTA IN PROCESS Parking Structure—Construction $400,000 CDOT—FASTER Fish Creek Flood Repairs IN PROCESS Fish Creek $482,695 CDBG-DR IN PROCESS Fish Creek $1,980,766 FEMA—large project IN PROCESS Fish Creek $2,790,866 FHWA 2013 Flood Repairs COMPLETE Multiple Sites $771,470 FEMA—large project COMPLETE Multiple Sites $151,360 CDBG-DR Carriage Hills / Scott Ponds COMPLETE Scott Ponds Dam Repair $983,000 DEF Fall River Trail Extension IN PROCESS Fall River Trail $337,000 FTA Electronic Message Signs IN PROCESS Electronic Message Signs $136,000 CMAQ Moraine Ave Bridge Replacement IN PROCESS Moraine Ave Bridge Replacement $2,000,000 CDBG-DR (Round 2 ) IN PROCESS Moraine Ave Bridge Replacement $220,000 DOLA—EIAF Staffing Stormwater Master Plan IN PROCESS Stormwater Master Plan $300,000 CDBG-DR (Round 3 Plan- ning) Estes Park Public Works Department Annual Report—2016 TOTAL GRANT FUNDING: $31,282,157 38 The Facilities Division acts as property manager to all publicly owned build- ings. Public Works hires contractors to physically maintain all buildings. The Facilities Manager, Jon Landkamer, administers these specific contracts. When not administering contracts, Jon is out performing the fixes himself or responding to a work ticket generated by Town staff. PROJECT NAME Aggregate Storage Building—$48K Events Center / Pavilion Snow Guard—$34K Fish Hatchery Painting—$25K Visitor Center Restroom Addition—$189K Dekker Bldg—Light & Power Remodel—$173K Conference Center Interior Repairs—$43K Town Hall Security Cameras—$99K Town Hall Engineering Roof Repair—$11K TOTAL: $622,000 Estes Park Public Works Department Annual Report—2016 Facilities Division Facilities Division Projects PROJECT NAME Brood House Liquidation- $0 Estes Park Museum Interior Remodel—$200K Town Hall Community Dev Roof Repair—$58K Fleet / Streets Shop Roof Repair—$150K TOTAL: $408,000 Coming In 2017 Completed in 2016 2016 WORK REQUESTS Work Requests via FacilitiesSupport@estes.org 86 opened / 70 addressed & closed (some left open to address during planned project) Work Requests via JLandkamer@estes.org Approx. 85 opened / 85 closed TOTAL: 176 Requested / 155 Completed The Facilities Division is also working on an RFP for develop- ment of the Town of Estes Park, Fish Hatchery property. This will be a joint project with the Estes Park Housing Authority, and po- tentially other local agencies, with the goal of increasing the availabil- ity of workforce housing. This pro- ject could increase the local inven- tory of housing for sale within the 60% to 150% Area Median Income market, and also add rental unit inventory. The 2016 Estes Park Housing Needs Assessment report, prepared for the Estes Park Hous- ing Authority, is the guiding docu- ment for this project. Facilities Division Manager, Jon Landkamer, is preparing a Space Needs Assessment for the February PUP Com- mittee Meeting. This report will capture the Staffing Needs Assessment performed by Public Works Managers and Supervisors. It will also highlight the space in which we currently work and what is needed in the future, as services and staffing grow with the community. The hope is to identify some short -term space needs solutions, as well as plant the seed for future growth. Aggregate Storage Tent Jon Landkamer, Facilities Manager Museum Remodel Drawing Town Hall Bike Rack VC Restroom Addition Dekker L & P Remodel 39 Operations Manager Kevin McEachern is the Operations Division Manager. He oversees the Streets Division, Parks Divi- sion, and the Fleet Division. He also works closely with the Public Works Director, Greg Muhonen, on budget analysis and monitoring. Kevin is also responsible for all vehicle purchases for the Town of Estes Park and manages the vehi- cle replacement fund activities. Fleet Division A staff of three trained mechanics maintains the Town of Estes Park’s more than 500 pieces of equipment. Among their many responsibilities are Police and Fire equipment, Light and Power aerial bucket devices and line equipment, a variety of trailers, 15 pieces of snow removal equipment, street sweepers, loaders, back- hoes, and an assortment of turf equipment. fleet repairs, as well as fuel and equip- ment expenses are tracked on a Fleet maintenance computer software system that gives up-to-date information on equipment operating costs. The Fleet Maintenance Division is led by James Nelson, a Master ASE Certi- fied Mechanic for both Auto and Truck. Jim Nelson, Josh Roper, Steve Harvey Jim Nelson, Fleet Supervisor Kevin McEachern, Operations Manager Josh Roper In addition to all the Town vehicles and equipment maintained by the Fleet Division, the Estes Valley Fire Protection District also counts on their services. The EVFPD’s fleet includes: 3 structure fire engines, 2 wildland fire en- gines, 2 water tender engines, 1 heavy rescue truck with light towers, air supply & extrication equipment, 1 ladder truck with water pump, 1 dive rescue vehicle containing all appropriate water rescue gear and the ability to tow inflatable boats. Estes Park Public Works Department Annual Report—2016 40 Estes Park Public Works Department Annual Report—2016 2016 Fleet Work Productivity DEPT TYPE QTY Police: Cars/Trucks: 18 Light Equip: 4 Streets: Cars/Trucks: 10 Heavy Equip: 6 Light Equip: 8 Parks: Cars/Trucks: 6 Light Equip: 17 Engineering: Cars/Trucks: 1 Light & Power: Cars/Trucks: 18 Heavy Equip: 2 Light Equip: 24 Water Dept: Cars/Trucks: 11 Heavy Equip: 1 Light Equip: 8 Community Development: Cars/Trucks: 2 Museum: Cars/Trucks: 1 Senior Center: Cars/Trucks: 1 Events: Cars/Trucks: 5 Heavy Equip: 4 Light Equip: 14 Fleet: Cars/Trucks: 1 Code Description Total Hours Billed Billed Revenue Administrative 620.50 $56,042.25 Fabrication 111 $11,154.95 New Vehicle (IN / OUT) 233 $20,056.07 Overhead (DOT INSP) 51 $4,286.73 Preventative Maintenance 745 $69,458.71 Vehicle & Equipment Repair 3537.33 $325,243.62 Seasonal Equipment Setup 73 $8,108.57 TOTAL 5,370.83 $494,350.90 Fleet processed 1,561 Work Orders in 2016 with a billable efficiency rating of 86%!! That is 11% over the national standard OF 75%. Outstanding!! Streets: 2017 International Plow Truck, $153,716; 2016 Spartan Jet Trailer, $46,260; 2015 Atlas Copco Air Compressor, $18,573 Light & Power: 2016 Chev Colorado, $27,625; 2016 Tow Trailer, $24,315; 2016 Freightliner Dump Truck, $132,795 Water Dept.: 2016 Jeep Wrangler, $36,893; 2016 Chev Silverado, $54,095; 2016 Chev Silverado, $64,095 Engineering Dept.: 2016 Subaru Forester, $21,929 Facilities Div: 2016 Subaru Outback, $22,600 Comm Dev Dept.: 2017 Subaru Outback, $22,045 Parks Dept.: Cushman, $19,500 Events Dept: Welder, $4,800 Police Dept.: 2 Interceptors @ $31,918/ea 2016 Vehicle/Equipment Purchases 2016 Fleet Inventory (All Town-Owned Fleet) TOTAL FLEET: 162 TOTAL VEHICLES/EQUIPMENT PURCHASES: 16 / $713,077 41 The Streets Division, led by Justin Kearney, is responsible for maintain- ing 59 miles of Town roadway including snow plowing, street sweeping, striping, curb, gutter, pothole patching, traffic sign replacement, drain- age, shouldering and dump site cleaning. There are four full-time staff members in the depart- ment and one seasonal employee hired during the summer months. National Champs! Streets Division Supervisor, Justin Kearney, placed 1st in the 2016 Snow & Ice Conference Skid Steer Competition while Street Division Operator, Matt Lemke, placed 13th! They competed against 42 other skid steer operators from agencies across the nation! Streets Division PROJECT NAME Big Horn Parking Revisions Visitor Center North Curb Painting (700 ft) West Elkhorn ‘No Parking’ Signs Motorcycle Parking Spot Additions ‘Patcher’ Program Asphalt Millings Crushing Grey Hawk Roundabout Fall River Flood Regrading 2016 Spray Patcher Report (spray patcher program began June, 2015) Completed in 2016 Streets Division Projects Justin Kearney, Streets Supervisor Mike Williams, “Mr. Spray Patcher 2016 Snow Removal Totals = $155,210 2015 Totals (Jun—Dec) Employee Hrs 1,121.5 Equipment Hrs 206.70 Total Street Miles Plowed ($9.75/mi) 8,333 Total Trail Hours Plowed ($54.66/hr) 206.7 Fuel Used (gal) 3,007.8 Blades Replaced ($215.70/ea) 16 Salt/Sand Yards 423 Estes Park Public Works Department Annual Report—2016 Grey Hawk Roundabout—Signing and Striping 42 Other Activities in 2016 Although you’ve seen there were 1,516 street repairs done (potholes, cracks, surface patches, etc.) and this years list of completed projects, the Streets Department also performed all snow fencing, re-shouldering the edges of the road that were washed away by rain, correcting drain- age issues, parking lot striping, curb striping, assisting with flood- related clean-up (right) and the list goes on. . .what a team! Work Description Hours Worked Labor Cost Pothole Patching 297.39 $6,297.64 Street Administrative 215.11 $6,635.50 Bulk Materials 31.5 $852.48 Curb Repair & Maintenance 64.75 $1,155.79 Storm Water Drainage 241 $5,792.69 Street Maintenance 1.652 $42,941.50 Parking Lot Maintenance 16 $322.38 Project Design & Construction Management 78.75 $1,755.96 Sign Maintenance 133.25 $3,130.19 Special Events Support 328.68 $7,828.73 Street Striping 127.31 $2,668.55 Street Sweeping 40.75 $994.18 Traffic Control 25.5 $710.34 Snow Removal 568.84 $15,002.25 Drainage Work 8.3 $276.65 TOTALS (July thru Dec) 2,178.78 $96,364.83 2016 TOTALS 5,121.36 $175,249.08 2016 Streets Productivity Totals (July Thru Dec) Left to Right: Matt Lemke, Robert ‘Skip’ Bauming, Justin Kearney, Estes Park Public Works Department Annual Report—2016 Hours Worked Labor Cost 2,942.58 $78,884.25 Tracking by task item did not begin until July, 2016. The below totals the hours worked along with the associ- ated labor costs for the first six months of the year. 2016 Streets Productivity Totals (Jan Thru June) Visitor Center Lot Curb Painting Grey Hawk Roundabout Restriping 43 Estes Park In Bloom Program Musical Walkway The Town of Estes Park’s Parks Division is responsible for the maintenance, renovation and management of all Town-owned park land. Each year the Parks Division plants more than 38,000 annual flowers in addition to 8,000 perennial flowers while maintaining its own greenhouse, 10 acres of turf, 32 irrigation systems, 43 flower beds and 11 bronze statues. The Parks staff cares for the Estes Park Museum property, Stanley Park Fair- grounds, Light & Power Building grounds, open spaces and the downtown area. The Parks Department crew consists of five full-time employees, 1 part-time employee and approxi- mately 18 seasonal workers. Parks staff also handles the trash and recycling at Town- sponsored special events and assists in snow removal during winter and spring months. Estes Park in Bloom is a community-wide effort involving businesses, resi- dents, Town government and the YMCA of the Rockies whose mission is to promote beautification of the Town of Estes Park. One thing done from May through the end of the year each year is the Town’s Business Bright Spot program. Chosen businesses are honored monthly for their outstanding efforts in landscape, floral displays, and over- all appearance of a store front through the Business Bright Spot program. In 2016 Estes Park was recognized by America In Bloom for this program. Due to all the hard (but fun) work put into the Town’s floral displays and landscapes, in 2016 the Town won the medium community category in the International Communities in Bloom challenge as well as the international Floral Displays Award in the Communities in Bloom program. Parks Division The set of Wee Notes was installed and has shown to be very popular. It was the 3rd Phase of the musical walkway and is aimed at the lit- tlest members of our community. PROJECT NAME Bear Can Installation (72) Musical Walkway & Dedication Tree Identification Plaques Tree Identification Plaques Baseline Irrigation System Business Bright Spot Program Tregent Park Artificial Turf Park Bench Replacement New Tree Planting (30+) Library Bed Redevelopment Completed in 2016 Parks Division Projects Brian Berg is the Parks Division Su-pervisor, ski bum, and certified arbor- ist in Estes Park. Not only does he lead this fabulous crew, he also provides free arboriculture inspections for residents throughout the Estes Valley as well as provide education and resource materials to landowners. Business Bright Spot Award Presentation Tonya Zeigler Brian Berg PROJECT NAME Transit Facility Parking Structure Landscaping Pikas In The Park Installation Centennial Open Space/Knoll Wil- lows Rehabilitation Performance Park Climbing Wall Tunnel Disco Light Project Riverwalk Irrigation Rehabilita- tion—Phase 1 Coming in 2017 Estes Park Public Works Department Annual Report—2016 44 Estes Park Public Works Department Annual Report—2016 Three new baseline irrigation controllers were installed this year enabling us to track just how much water and time they’ll save us. Two were placed on the streetscape flowerbeds and the other was placed in Bond Park. Matt O’Reilly Trisha Morales-Dias Keri Kelly Mike Donnachie Work Description Hours Worked Labor Cost Estes Park in Bloom 327.45 $8,173.91 Flower Bed Maintenance 449 $10,220.67 Floral Design & Order 102.75 $2,459.96 Hardscape Maintenance 604.29 $13,997.15 Irrigation Blow-Out 211.02 $4,577.88 General Irrigation Maintenance 450.38 $9,899.18 Irrigation Programming 13 $274.08 Parks Administration 507.25 $12,586.75 Special Events Support 78.93 $2,131.84 Technical Support 28 $841.39 Hunter Jumper Events 11.5 $231.31 Snow Removal 265.5 $5,880.25 Special Projects 163.9 $3,955.55 Street Tree Pruning 106 $2,341.56 Sidewalk Grinding & Maintenance 33.12 $809.17 Trash Pickup/Sidewalk Cleaning 318.59 $7,514.81 Tree & Shrub Maintenance 161.5 $3,406.39 Turf Maintenance 328.62 $6,524.27 Weed Management 143.48 $3,510.08 TOTALS (July thru Dec) 4,304.28 $99,336.20 2016 TOTALS 7,070.23 $156,955.95 The Parks Division maintains all trees in the town’s rights of way, parks, parking lots and open spaces. Hours Worked Labor Cost 2,765.95 $57,619.75 2016 Parks Productivity Totals (Jan Thru June) Tracking by task item did not begin until July, 2016. The below totals the hours worked along with the asso- ciated labor costs for the first six months of the year. 2016 Parks Department Labor Productivity 45 Kevin Ash & Kelly Stallworth, The Town of Estes Park maintains approximately 59 centerline miles of paved streets. A successful pavement management program utilizes a variety of techniques that not only repair pavement sur- faces that have deteriorated, but more impor- tantly maintain roadway segments that are in good condition. All Town pavement management is led by Kelly Stallworth. Kelly is a civil engineer receiving his degree from the University of Alabama. He works closely with Engineering Manager, Kevin Ash, to plan and coordinate all pavement management activi- ties and is the engineer in charge of approving/ denying all ROW Permit for the Town of Estes Park. The Street Improvement Program’s goal is to develop and implement a street improvement program to raise the average Pavement Condition Index (PCI) of the Town to a value of 70 by the year 2024. The chart below shows the PCI rating drop from 2008 to 2016, spurring this program. As stated, the STIP program’s goal is to reach a PCI of 70 by 2024. The following chart shows how the weighted average will rise over the next 8 years with the current program in place. Pavement Management Coming together is a beginning. Keeping together is progress. Working together is success. ~ Henry Ford There were approximately 6 miles of Town roadway resurfaced in 2016 as part of the 1A Ballot Issue— Street Improvement Program Dry Gulch Road TOTAL COST: $894,503 Estes Park Public Works Department Annual Report—2016 Kelly Stallworth, Pavement Manager Street Overlay Estes Park GOAL Chip Sealed Road 46 The Engineering Division handles oversight of the Street Improve- ment Program and Public Works capital projects (issuing RFP’s, administering contracts, and organizing and directing engi- neering design teams) Kevin Ash manages this division. He holds a civil engineering de- gree from Colorado State Univer- sity and is licensed with the State of Colorado as a Professional Engineer. One of the biggest accomplish- ments of 2016 was the completion of Dry Gulch Road Improvements including the new trail connection to the Lake Estes Trail. Another notable accomplishment was that of the completion of all 2013 flood repair work (Carriage Hills Dam Repair, Brook Court, Moraine Avenue Drainage Ditch, etc). There were 21 different sites impacted during the 2013 flood requiring repair work. Engineering Division Completed in 2016 Engineering Projects Coming In 2017 Dry Gulch Ribbon-Cutting 2016 Engineering Division Capital Projects Scott Ponds Ribbon-Cutting Estes Park Public Works Department Annual Report—2016 Transit Facility Parking Structure Ribbon-Cutting 2016 Project Name Cost Barnes Dance $9,315 Rocky Mountain National Park Guide Signs $0 (CDOT Imple- mented) Brook Ct. / Moraine Ave. Ditch $193,306 Elm Road Drainage $482,851 Dry Gulch Road Rehabilitation $897,484 Carriage Hills Dam Repair (Scott Ponds) $864,906 Fall River Trail Improvements (Design) $337,000 1A STIP / Spray Patcher $130,079 1A STIP / Chip Seal Program $194,455 1A STIP / Crack Seal Program $199,974 1A STIP / 2016 Overlay & Patch Program $630,153 2017 Project Name Budget Electronic Message Board Installation $185,850 Transit Facility Parking Structure $10,202,679 MacGregor Avenue Improvements $600,000 Moraine Avenue Bridge Replacement (Construction) $2,200,000 US36 / Community Drive Intersection Improvements (Design) $51,000 1A STIP / 2017 Chip Seal Program $400,000 1A STIP / 2017 Crack Seal Program $100.000 1A STIP / 2017 Overlay & Patch Pro- gram $400,000 Spray Patcher $82,000 2017 Downtown Parking Program $45,000 Stormwater Master Plan & Feasibility Study $330,000 Fish Creek Road & Trail Improvements $5,050,619 Fall River Trail Plan Drawing Carriage Hills Spillway - Post Construction Kevin Ash TOTAL: $19,647,148 TOTAL: $3,939,523 47 48 PUBLIC WORKS Report To:Public Safety, Utilities & Public Works Committee Town Administrator Lancaster From:Jon Landkamer, Public Works Facilities Manager Date:February 6, 2017 RE:Public Works Space Needs Assessment Objective: The Public Works Leadership Team has been working internally, over the last year and a half, with Dallas Everhart, of StratOps, developing our “Plan on a Page”. One of our goals of this plan was to spend some time evaluating our staffing and space needs. This work also ties into the Town Board’s strategic objective for 2016, to; “Develop a facilities needs assessment for equipment and other storage, including the museum collections facility”. Present Situation: The existing staffing levels in Public Works have been evaluated by the Public Works Leadership Team. We utilized a multiple step process to evaluate not only the current staffing levels, but also to identify future staffing needs, and the space and equipment that go along with that staffing. 1.A Staffing Plan Organizational Chart, and Questionnaire, was distributed by Manager McEachern. Each PW Division Manager/Supervisor responded for their division, answering the eight questions provided. The focus of the exercise was staffing for the next five years. Highlights: a.Creative process focused on customer service b.Compared our operation to industry standards i.Example: Fleet should have 6 mechanics for the number of pieces of equipment in the fleet, we currently have 3 2.All Division Staffing Plans were then organized into a Public Works Staffing Plan that was produced at the end of 2015, by Manager McEachern. Highlights: a.One document to manage and maintain for the future 3.Space and Equipment needs were generated using a worksheet supplied by the APWA, called the Public Works Facility Calculator. This form is customizable, and was adjusted to reflect today’s construction costs. The worksheet reflects more than just PW since Fleet, in particular, services more than just PW vehicles. 49 Highlights: a.Found out we “need” 160,000 square feet of building and covered storage, and almost 12 acres for the entire operation b.We “have” the 12 acres on Elm Road, and approximately 23,000 square feet of building and covered storage, including office space at Town Hall c. Approximately $33 million to build this new, today d.Public Works will need to partner with Utilities to keep this process moving forward 4.A Staffing Plan Budget Worksheet was developed and distributed by Manager Landkamer. Each Division Supervisor filled in their future staffing requests. This process put the staffing ideas into a budget format for evaluation within each division. Highlights: a.Attempted to assign a dollar amount to more accurately estimate the actual cost of additional staff, including workspace and equipment i.Example: We currently have two mechanic bays and one lift, if we hired another mechanic today, there is no bay or lift to work in 5.The Staffing Plan Budget Worksheets were then summarized on a master worksheet, so the budget implications could be seen for the entire PW department. Highlights: a.Summary sheet helps us look at the big picture and overall impact of increasing staffing 6.The consulting firm of SpaceIntoPlaceAD was engaged to evaluate needs in the Utilities Department in 2015. The methodology is described in the attached report from Ginny McFarland. Highlights: a.“Bottom up” evaluation of space needs in the Utilities Department There have been many operational decisions, made recently, that are directly related to our space and equipment needs. The Museum is pursuing funding to implement the new conceptual plan for a new collections facility on their campus. This will free up three bays of warehouse space in the Light & Power storage building that is desperately needed for them to gain efficiency. Administrative Services is implementing a document management system that will help to greatly reduce paper that is being stored in Town Hall, freeing up more space for offices. We have started conversations with the Library to move their used book storage out of the Light & Power storage building. This space will be used for Smart Meter system equipment and also for fiber optic management. With planning discussions and new concepts being explored, such as; Storm Water Master Plan/Utility, Broadband Utility, and Smart Meter Systems, these space use decisions are instrumental steps in the overall process of site development and utilization. Proposal: Public Works is recommending that work continue on the space and equipment needs for Public Works and Utilities. Ultimately, this concept of planning for our space and equipment needs should go organization wide. Staffing decisions should consider the 50 organizational impact as a whole, and the management of those impacts should be part of the implementation of new positions. Advantages: Increased level of customer service Increased efficiency of the staff in their respective work areas Improved understanding of the costs associated with adding staff Improve long range facility planning Disadvantages: Significant budget implications for future construction potential Action Recommended by Staff: Public Works is committed to continue to explore ways to deliver our mission in the most efficient manner. Identifying and implementing solutions to staffing needs and their space and equipment needs will continue to be a priority. We recommend that the space needs project gets funding to develop an overall vision for the Town of Estes Park. Interim solutions should be given high priority in the budget process, as these strategies will give us more time to develop and implement the long range facility plan. Budget: There is no budget developed for this concept, at this time. Level of Public Interest: None Sample Motion: None Attachments: Draft Public Works Staffing Plan APWA Public Works Facility Calculator Summary of Staffing Plan Budget Worksheet SpaceIntoPlace Documents 51 Town of Estes Park Public Works Staffing Plan February 2017 52 Town of Estes Park Public Works Staffing Plan February 2017 PUP Staffing Plan.docx Public Works Vision: We are a proactive, innovative, knowledgeable, respected team creatively improving community-driven services. Public Works Mission: The Estes Park Public Works Department protects the trust earned as innovative & effective providers of award-winning parks, safe multimodal streets, reliable equipment, and efficient buildings that support our unique mountain community. Town Vision: The Town of Estes Park will enhance our position as a premier mountain community. Town Mission: The Mission of the Town of Estes Park is to provide high-quality, reliable services for the benefit of our citizens, guests and employees, while being good stewards of public resources and our natural setting. 53 Town of Estes Park Public Works Staffing Plan February 2017 PUP Staffing Plan.docx Table of Contents 1 INTRODUCTION .............................................................................................................................. 1 1.1 PURPOSE ................................................................................................................................ 1 1.2 SCOPE .................................................................................................................................... 1 1.3 REFERENCES ........................................................................................................................... 1 1.3.1 eStratOp.com Everhart + Associates ............................................................................A-1 1.3.2 Project Centralized Document Repository ........................................................................ 1 1.3.3 External References ......................................................................................................... 1 1.4 DOCUMENT MAINTENANCE ....................................................................................................... 1 2 STAFFING ....................................................................................................................................... 2 2.1 STAFF PLANNING ..................................................................................................................... 2 2.1.1 Engineering ....................................................................................................................A-2 2.1.2 Facilities .........................................................................................................................A-6 2.1.3 Fleet ...............................................................................................................................A-9 2.1.4 Parks ............................................................................................................................A-13 2.1.5 Streets ..........................................................................................................................A-17 2.2 STAFFING PLAN TIMELINE ....................................................................................................A-21 3 ROLES AND RESPONSIBILITIES ................................................................................................. 7 3.1 Planning ROLES AND RESPONSIBILITIES ................................................................................... 7 3.1.1 Public Works Director ....................................................................................................... 7 3.1.2 Operations Manager ......................................................................................................... 7 3.1.3 Engineering Manager........................................................................................................ 7 3.1.4 Facilites Manager .............................................................................................................. 8 3.1.5 Fleet Supervisor ................................................................................................................ 8 3.1.6 Parks Maintenance Supervisor ......................................................................................... 8 3.1.7 Street Supervisor .........................................................................................................A-22 3.1.8 Administrative Assistant .................................................................................................... 9 APPENDIX A: APPENDIX B: 54 Town of Estes Park Public Works Staffing Plan February 2017 PUP Staffing Plan.docx 1 INTRODUCTION 1.1 Purpose This document describes the Staffing Plan for the Town of Estes Park Public Works. The purpose is to capture a written Staffing Plan to meet high quality service levels in Public Works as the demands change. The Staffing Plan will make certain to prioritize and make progress to balance staffing and structure with citizen expectations by area semi-annually (November and June). 1.2 Scope This Staff Management Plan identifies the desired five year staffing needs that include current positions, future positions, support services, additions, training and plans to provide high quality services as demands change. This will also identify creative funding, services in response to citizens and to insure credibility with the use of data when possible or appropriate. 1.3 References eStratOp.com Everhart + Associates For guidance on eStratOp go to Web (http://www.eStratOp.com). Project Centralized Document Repository Public Works U drive. External References 1.4 Document Maintenance This document will be reviewed semi-annually and updated as needed, as plans change through each phase of the life cycle. Lessons learned as a result of continuing staffing and demands, efforts will be captured at the end of each phase and used to improve plan standards. This document contains a revision history log. When changes occur, the version number will be updated to the next increment and the date, owner making the change, and change description will be recorded in the revision history log of the document. 55 Town of Estes Park Public Works Staffing Plan February 2017 PUP Staffing Plan.docx 2 STAFFING 2.1 Staff Planning Engineering Green - Existing positions Yellow – Proposed positions 56 Town of Estes Park Public Works Staffing Plan February 2017 PUP Staffing Plan.docx Facilities Green – Existing positions Yellow – Proposed positions 57 Town of Estes Park Public Works Staffing Plan February 2017 PUP Staffing Plan.docx Fleet Green – Existing positions Yellow – Proposed positions 58 Town of Estes Park Public Works Staffing Plan February 2017 PUP Staffing Plan.docx Parks Green – Existing positions Yellow – Proposed positions 59 Town of Estes Park Public Works Staffing Plan February 2017 PUP Staffing Plan.docx Streets Green – Existing positions Yellow – Proposed positions 60 Town of Estes Park Public Works Staffing Plan February 2017 PUP Staffing Plan.docx 2.2 Staffing Plan Timeline 3 ROLES AND RESPONSIBILITIES 3.1 Planning Roles and Responsibilities Public Works Director Operations Manager Update the plan when needed. Support and assist all Supervisors and Managers. Each supervisor should visit their activity costs and staffing needs every quarter to see if anything has changed from the original staffing plan. Keep and maintain good records for support of your future changing needs. Any funding information that is received or if you hear of any, investigate and find out if it will work for your division. If you think it will work for another division please share the information with that supervisor. Keep justification memos or reports at the ready and keep them updated in case funding is available or budget amounts for a plan is available. Give any changes to the plan to the Operations Manager so it can be updated on the shared drive. Engineering Manager Each supervisor should visit their activity costs and staffing needs every quarter to see if anything has changed from the original staffing plan. Keep and maintain good records for support of your future changing needs. Any funding information that is received or if you hear of any, investigate and find out if it will work for your division. If you think it will work for another division please share the information with that supervisor. Keep justification memos or reports at the ready and keep them updated in case funding is available or budget amounts for a plan is available. Give any changes to the plan to the Operations Manager so it can be updated on the shared drive. 61 Town of Estes Park Public Works Staffing Plan February 2017 PUP Staffing Plan.docx Facilities Manager Each supervisor should visit their activity costs and staffing needs every quarter to see if anything has changed from the original staffing plan. Keep and maintain good records for support of your future changing needs. Any funding information that is received or if you hear of any, investigate and find out if it will work for your division. If you think it will work for another division please share the information with that supervisor. Keep justification memos or reports at the ready and keep them updated in case funding is available or budget amounts for a plan is available. Give any changes to the plan to the Operations Manager so it can be updated on the shared drive. Fleet Supervisor Each supervisor should visit their activity costs and staffing needs every quarter to see if anything has changed from the original staffing plan. Keep and maintain good records for support of your future changing needs. Any funding information that is received or if you hear of any, investigate and find out if it will work for your division. If you think it will work for another division please share the information with that supervisor. Keep justification memos or reports at the ready and keep them updated in case funding is available or budget amounts for a plan is available. Give any changes to the plan to the Operations Manager so it can be updated on the shared drive. Parks Maintenance Supervisor Each supervisor should visit their activity costs and staffing needs every quarter to see if anything has changed from the original staffing plan. Keep and maintain good records for support of your future changing needs. Any funding information that is received or if you hear of any, investigate and find out if it will work for your division. If you think it will work for another division please share the information with that supervisor. Keep justification memos or reports at the ready and keep them updated in case funding is available or budget amounts for a plan is available. Give any changes to the plan to the Operations Manager so it can be updated on the shared drive. Street Supervisor Each supervisor should visit their activity costs and staffing needs every quarter to see if anything has changed from the original staffing plan. Keep and maintain good records for support of your future changing needs. 62 Town of Estes Park Public Works Staffing Plan February 2017 PUP Staffing Plan.docx Any funding information that is received or if you hear of any, investigate and find out if it will work for your division. If you think it will work for another division please share the information with that supervisor. Keep justification memos or reports at the ready and keep them updated in case funding is available or budget amounts for a plan is available. Give any changes to the plan to the Operations Manager so it can be updated on the shared drive. Administrative Assistant 63 Town of Estes Park Public Works Staffing Plan February 2017 PUP Staffing Plan.docx 64 Fleet Data Entry Provided for your use by : Public Works Facility VEHICLES AND EQUIPMENT ANTICIPATED TO BE DOMICILED AT YOUR FACILITY Type of Vehicle/Equipment Size Space Standard Resulting Area Entry Quantity of this Vehicle Type Heavy Duty Trucks: Dump Trucks, Solid Waste Trucks, Snow Removal Trucks, Vactor, and Water Trucks, Road Striping Truck vehicles 8'-6" to 10'- 0" wide x 18'-0" to 35'-0" long 12' X 35'840 14 Medium Duty Trucks: 1 Ton Pick-up Trucks, Small Recycling Trucks, Spray Trucks, Crew Trucks, Service Body Trucks, Small Dump Body, and Bucket Trucks, Ambulances, Paint and Sign Trucks Vehicles 8'-6" to 10 wide x 16'-0" to 22'-0" long 12' X 25'500 15 Light Duty Vehicles: Pick-up Trucks, Sedans, Police Cruisers, Vans, SUV's and Fork Trucks Vehicles 8'-6" wide x 12'-0" to 16'-0" long 10' X 20'400 11 Fire Apparatus: Ladder Trucks, Pumper Trucks, Haz Mat Trucks, Support Trucks, Brush Fire Trucks, Command Center Vehicles Vehicles 8'-6" to 10'-0" wide x 18'-0" to 40'-0" long 12' X 45'1080 1 Construction Equipment: Motor Grader, Larger Front End Loaders, Bull Dozers, Paving Equipment, Crane Trucks, Low-boy Trailers Vehicles 8'-6" to 10'-0" wide x 18'-0" to 30'-0" long 12' X 35'840 31 Staff and Visitors: Pick-up Trucks, Sedans, Vans, SUV's and Motorcycles Vehicles 8'-6" wide x 12'-0" to 16'-0" long 9' X 18'324 12 Down Line/Ready Line: Various types of Vehicles awaiting vehicle maintenance or awaiting pick up. Vehicles 8'-6" to 10'- 0" wide x 18'-0" to 30'-0" long 12' X 35'840 8 New Vehicle Delivery and Auction Vehicle Storage Area: Vehicle sizes vary - area based on Medium Duty vehicle with no circulation Vehicles 8'-6" wide x 16'-0" to 24'-0" long 10' X 25'250 2 No Circulation Provided for Compound Stacked Parking Enter Quantity of Vehicles in each Category of Vehicle Public Works Facility Calculator - Fleet Data Entry Provided By Maintenance Design Group, LLC65 Facility Data Entry Provided for your use by : Public Works Facility SPACES ANTICIPATED TO BE INCLUDED AT YOUR FACILITY Space Description Space Standard Resulting Area Area Required (SF) Includes Circulation Enter Number of Staff Positions or Quantity Required BUILDING AREAS Administrative Offices Private Offices for Directors and Assistant Directors 14'-0" X 16'-0"224 1512 5 Private Offices for Supervisors 10'-0" X 12'-0"120 972 6 Workstations for Clerical and Reception staff 8'-0" X 8'-0"64 259 3 Support and Training Areas Reception/Lobby Area 250 SQ. FT. Min 250 338 1 Public Meeting/Board Room (40-50 Persons)900 SQ. FT. Min 900 0 0 Copy Files and Storage 200 SQ. FT. Min 200 540 2 Conference Room (Large) - 10 to 14 Staff 350 SQ. FT. Min 350 473 1 Conference Room (Small) - 6 to 8 Staff 225 SQ. FT. Min 225 911 3 Training Room (25 Persons Academic Setting)600 SQ. FT. Min 600 810 1 Training Table and Chair Storage 200 SQ. FT. Min 200 540 2 All Purpose Room (100 Persons Seated)9 SQ. FT. /person 900 0 0 Crew Room for crews of 10 to 18 400 SQ. FT. Min 400 540 1 Lunch/Break Room 400 SQ. FT. Min (Incl. Kitchenette & Vending)400 540 1 Building Support Areas (IT, Electrical Room and Mechanical Rooms)500 SQ. FT. Min 500 1350 2 Men's Restroom (Public Use)120 SQ. FT. Min 120 0 0 Needed if a Public Meeting Room is Selected Women's Restroom (Public Use)120 SQ. FT. Min 120 0 0 Needed if a Public Meeting Room is Selected Men's Restroom/Showers/Lockers ( Sized for 100% of Staff for Functional Reality)700 SQ. FT. Min 700 945 1 Women's Restroom/Showers/Lockers ( Sized for 50% of Staff by Code)350 SQ. FT. Min 350 473 1 Mud Room/Wet Gear Storage 250 SQ. FT. Min 250 338 1 Total Administrative Area for the Facility (SF)10,539 Enter Facility Options and Quantities here. Only enter data in white cells. Public Works Facility Calculator - Facility Data Input Provided by Maintenance Design Group, LLC 66 Facility Data Entry Provided for your use by : Public Works Facility SPACES ANTICIPATED TO BE INCLUDED AT YOUR FACILITY Public Works Shops Shared General Use Shop Shops 1225 SQ. FT. Min Storage 800 SQ. FT. Min 2025 2430 1 Streets Shop & Storage (Includes parking for Paving Equipment) Shops 1225 SQ. FT. Min Storage 800 SQ. FT. Min 2025 14580 6 Pavement Markings Shop & Storage (Includes parking for Striping Truck) Shops 1225 SQ. FT. Min Storage 800 SQ. FT. Min 2025 2430 1 Sign Shop & Storage (Includes Parking for Sign Truck)Shops 1225 SQ. FT. Min Storage 800 SQ. FT. Min 2025 2430 1 Construction/Concrete Repair Shop & Storage Shops 800 SQ. FT. Min Storage 800 SQ. FT. Min 1600 0 0 Building/Facility Maintenance Shop & Storage Shops 800 SQ. FT. Min Storage 800 SQ. FT. Min 1600 3840 2 Traffic Engineering/Signal Shop & Storage Shops 800 SQ. FT. Min Storage 800 SQ. FT. Min 1600 1920 1 Landscaping/Irrigation Shop & Storage Shops 800 SQ. FT. Min Storage 800 SQ. FT. Min 1600 0 0 Carpentry Shop & Storage Shops 800 SQ. FT. Min Storage 800 SQ. FT. Min 1600 1920 1 Electrical Shop & Storage Shops 400 SQ. FT. Min Storage 600 SQ. FT. Min 1000 0 0 Water Meter Shop & Storage Shops 400 SQ. FT. Min Storage 600 SQ. FT. Min 1000 0 0 Water Distribution Shop (Pumps) & Storage Shops 800 SQ. FT. Min Storage 800 SQ. FT. Min 1600 0 0 Other Shop & Storage (Small Shops 800 SQ. FT. Min Storage 800 SQ. FT. Min 1600 1920 1 Other Shop & Storage (with Interior Truck Parking)Shops 1225 SQ. FT. Min Storage 800 SQ. FT. Min 2025 2430 1 Other Shop & Storage Shops 1225 SQ. FT. Min Storage 800 SQ. FT. Min 2025 0 0 Other Smaller Shop & Storage Shops 400 SQ. FT. Min Storage 600 SQ. FT. Min 1000 0 0 Total Public Works Shops Areas for the Facility (SF)33,900 Public Works Facility Calculator - Facility Data Input Provided by Maintenance Design Group, LLC 67 Facility Data Entry Provided for your use by : Public Works Facility SPACES ANTICIPATED TO BE INCLUDED AT YOUR FACILITY Vehicle Maintenance Areas Vehicle Maintenance Office Areas Vehicle Maintenance Manager Private Office 14'-0" X 16'-0"224 302 1 Shared Offices for Supervisors/Foreman/Leads 10'-0" X 10'-0"100 270 2 VM Support and Training Areas Reception/Lobby Area 150 SQ. FT. Min 150 203 1 Manuals/Copy/ Files and Storage 150 SQ. FT. Min 150 203 1 Conference Room (Small) - 6 to 8 Staff 225 SQ. FT. Min 225 304 1 Maintenance Training Room (25 Persons Academic Setting)600 SQ. FT. Min 600 0 0 Training Table and Chair Storage 200 SQ. FT. Min 200 270 1 Lunch/Break Room 400 SQ. FT. Min (Incl. Kitchenette & Vending)400 540 1 Building Support Areas (IT, Electrical Room and Mechanical Rooms)500 SQ. FT. Min 500 675 1 Men's Restroom/Showers/Lockers ( Sized for 100% of Staff for Functional Reality)450 SQ. FT. Min 450 608 1 Women's Restroom/Showers/Lockers ( Sized for 50% of Staff by Code)250 SQ. FT. Min 250 338 1 Vehicle Maintenance Bays & Shops Heavy Repair Bay (1:35 HD Trucks and Equipment)20'-0" X 50'-0"1000 2400 2.0 Rounded Value based on Fleet Data and Bay to Vehicle Ratio of 1:35 Heavy PM/Inspection Bay (1:50 HD Trucks and Equipment)20'-0" X 50'-0"1000 1200 1.0 Rounded Value based on Fleet Data and Bay to Vehicle Ratio of 1:50 Fire Apparatus Repair Bay (1:10 Fire Apparatus and Equipment)20'-0" X 50'-0"1000 1200 1.0 Rounded Value based on Fleet Data and Bay to Vehicle Ratio of 1:10 Light & Medium Duty Repair Bay (1:50 Light and Medium Duty Vehicles)16'-0" X 35'-0"560 672 1.0 Rounded Value based on Fleet Data and Bay to Vehicle Ratio of 1:50 Light and Medium Duty PM/Inspection Bay (1:120 Vehicles)16'-0" X 35'-0"560 672 1.0 Rounded Value based on Fleet Data and Bay to Vehicle Ratio of 1:100 Specialty Bay - Welding Bay 25'-0" X 50'-0"1250 1500 1 Specialty Bay - Chassis Wash (Engine/Undercarriage) Bay 25'-0" X 50'-0"1250 1500 1 Common Work Area (General Machine Shop)450 SQ. FT. Min 450 540 1 Welding/Fabrication Shop & Storage 900 SQ. FT. Min 900 1080 1 Public Works Facility Calculator - Facility Data Input Provided by Maintenance Design Group, LLC 68 Facility Data Entry Provided for your use by : Public Works Facility SPACES ANTICIPATED TO BE INCLUDED AT YOUR FACILITY Tire Shop & Storage 750 SQ. FT. Min 750 900 1 Portable Equipment Storage 450 SQ. FT. Min 450 540 1 Parts Storage (includes office, Issue Window and Shipping & Receiving)2000 SQ. FT. Min 2000 2400 1 Lube/Compressor Room 600 SQ. FT. Min 600 720 1 Battery Room/Storage 150 SQ. FT. Min 150 180 1 Total Vehicle Maintenance Areas for the Facility (SF)19,215 Public Works Facility Calculator - Facility Data Input Provided by Maintenance Design Group, LLC 69 Facility Data Entry Provided for your use by : Public Works Facility SPACES ANTICIPATED TO BE INCLUDED AT YOUR FACILITY Warehouse Areas Warehouse Office Areas Vehicle Maintenance Manager Private Office 14'-0" X 16'-0"224 269 1 includes 20% Circulation Shared Offices for Supervisors/Foreman/Leads 6'-0" X 8'-0"48 0 0 includes 20% Circulation Warehouse Storage Areas Palletized Storage Areas 125 SQ. FT./Pallet Rack including 1/2 of Fork Circulation 125 2250 12 Each Rack = 6 pallet positions - includes 50% Circulation Small Parts Storage Areas 12 SQ. FT./storage Shelving including 1/2 of circulation 12 216 12 includes 50% Circulation Shipping & Receiving (Dock Areas)16'-0" x 20'-0"320 704 2 includes 20% Circulation Total Warehouse Areas for the Facility (SF)3,439 Interior Vehicle Storage Areas - 75% Circulation for interior Drives and 5% for structure Heavy Duty Trucks: Dump Trucks, Solid Waste Trucks, Snow Removal Trucks, Vactor, and Water Trucks, Road Striping Truck 12' X 35'735 10805 14 Caution: Value based on Fleet Data - changing value breaks link Medium Duty Trucks: 1 Ton Pick-up Trucks, SmallRecycling Trucks, Spray Trucks, Crew Trucks, Service Body Trucks, Small Dump Body, and Bucket Trucks, Ambulances, Paint and Sign Trucks 12' X 25'525 8269 15 Caution: Value based on Fleet Data - changing value breaks link Light Duty Vehicles: Pick-up Trucks, Sedans, Police Cruisers, Vans, SUV's and Fork Trucks 10' X 20'350 4043 11 Caution: Value based on Fleet Data - changing value breaks link Fire Apparatus: Ladder Trucks, Pumper Trucks, Haz Mat Trucks, Support Trucks, Brush Fire Trucks, Command Center Vehicles 12' X 45'945 992 1 Caution: Value based on Fleet Data - changing value breaks link Construction Equipment: Motor Grader, Larger Front End Loaders, Bull Dozers, Paving Equipment, Crane Trucks, Low-boy Trailers 12' X 35'735 23924 31 Caution: Value based on Fleet Data - changing value breaks link Total Interior Vehicle Storage Areas for the Facility (SF)48,032 Salt & Sand Structures Salt Storage Structure 50' x 80'4000 0 0 Sand Storage Structure 50' x 80'4000 4000 1 Salt /Sand Mix Storage Structure 50' x 80'4000 4000 1 Liquid Deicing Production & Storage 20' x 30'600 0 0 Total Salt/Sand Storage Structures for the Facility (SF)8,000 Public Works Facility Calculator - Facility Data Input Provided by Maintenance Design Group, LLC 70 Facility Data Entry Provided for your use by : Public Works Facility SPACES ANTICIPATED TO BE INCLUDED AT YOUR FACILITY COVERED AREAS Covered Vehicle Storage Areas - 5% for Canopy Structure Heavy Duty Trucks: Dump Trucks, Solid Waste Trucks, Snow Removal Trucks, Vactor, and Water Trucks, Road Striping Truck 12' X 35'420 6174 14 Caution: Value based on Fleet Data - changing value breaks link Medium Duty Trucks: 1 Ton Pick-up Trucks, Small Recycling Trucks, Spray Trucks, Crew Trucks, Service Body Trucks, Small Dump Body, and Bucket Trucks, Ambulances, Paint and Sign Trucks 12' X 25'300 4725 15 Caution: Value based on Fleet Data - changing value breaks link Light Duty Vehicles: Pick-up Trucks, Sedans, Police Cruisers, Vans, SUV's and Fork Trucks 10' X 20'200 2310 11 Caution: Value based on Fleet Data - changing value breaks link Fire Apparatus: Ladder Trucks, Pumper Trucks, HazMat Trucks, Support Trucks, Brush Fire Trucks, Command Center Vehicles 12' X 45'540 567 1 Caution: Value based on Fleet Data - changing value breaks link Construction Equipment: Motor Grader, Larger Front End Loaders, Bull Dozers, Paving Equipment, Crane Trucks, Low-boy Trailers 12' X 35'420 13671 31 Caution: Value based on Fleet Data - changing value breaks link Total Covered Vehicle Storage Areas for the Facility (SF)27,447 Covered Fuel and Wash Areas Covered Fueling Island (Option 1): (2 Position; 1 Island; 1 dual hose, dual fuel dispenser)30' x 40'1200 0 0 Covered Fueling Island (Option 2): (4 Position; 1 Island; 2 dual hose/ dual fuel dispenser)30' x 60'1800 0 0 Covered Fueling Island (Option 3): (4 Position; 2 Island; 2 dual hose/ dual fuel dispenser)40' x 60'2400 0 0 Large Truck/Equipment Rough Wash 25' x 50'1250 1250 1 Large Truck/Equipment Automated Wash 25' x 70'1750 0 0 Automotive Automated Wash 20' x 35'700 0 0 Total Covered Fuel and Wash Areas for the Facility (SF)1,250 Covered Storage Areas Covered Pipe Storage Bins (20' lengths)20' x 25'500 3000 6 Covered Granular Material Storage Bins 15' x 25'375 4500 12 Total Covered Storage Areas for the Facility (SF)7,500 Public Works Facility Calculator - Facility Data Input Provided by Maintenance Design Group, LLC 71 Facility Data Entry Provided for your use by : Public Works Facility SPACES ANTICIPATED TO BE INCLUDED AT YOUR FACILITY EXTERIOR AREAS Exterior Vehicle Storage Areas Heavy Duty Trucks: Dump Trucks, Solid Waste Trucks, Snow Removal Trucks, Vactor, and Water Trucks, Road Striping Truck 12' X 35'840 11760 14 Caution: Value based on Fleet Data - changing value breaks link Medium Duty Trucks: 1 Ton Pick-up Trucks, Small Recycling Trucks, Spray Trucks, Crew Trucks, Service Body Trucks, Small Dump Body, and Bucket Trucks, Ambulances, Paint and Sign Trucks 12' X 25'500 7500 15 Caution: Value based on Fleet Data - changing value breaks link Light Duty Vehicles: Pick-up Trucks, Sedans, Police Cruisers, Vans, SUV's and Fork Trucks 10' X 20'400 4400 11 Caution: Value based on Fleet Data - changing value breaks link Fire Apparatus: Ladder Trucks, Pumper Trucks, Haz Mat Trucks, Support Trucks, Brush Fire Trucks, Command Center Vehicles 12' X 45'1080 1080 1 Caution: Value based on Fleet Data - changing value breaks link Construction Equipment: Motor Grader, Larger Front End Loaders, Bull Dozers, Paving Equipment, Crane Trucks, Low-boy Trailers 12' X 35'840 26040 31 Caution: Value based on Fleet Data - changing value breaks link Staff and Visitors: Pick-up Trucks, Sedans, Vans, SUV's and Motorcycles Up to 8'-6" wide x 12'- 0" to 16'-0" long 324 3888 12 Caution: Value based on Fleet Data - changing value breaks link Down Line/Ready Line: Various types of Vehicles awaiting vehicle maintenance or awaiting pick up. 8'-6" to 10'-0" wide x 18'-0" to 35'-0" long 840 6720 8 Caution: Value based on Fleet Data - changing value breaks link New Vehicle Delivery and Auction Vehicle Storage Area: Vehicle sizes vary - area based on Medium Duty vehicle with no circulation Up to 8'-6" wide x 16'-0" to 24'-0" long 250 500 2 Caution: Value based on Fleet Data - changing value breaks link Total Vehicle Storage Areas for the Facility (SF)61,888 Exterior Storage Areas Pipe Storage pods (20' lengths)20' x 25'1000 9000 6 Based on most efficient depth for storage access Plus Circulation Granular Material Storage Bins 15' x 25'1125 20250 12 Based on common configuration Plus Circulation Misc. Storage pods 20' x 25'1000 9000 6 Based on most efficient depth for storage access Plus Circulation Fuel Storage Tank Yard 10' x 35'525 1050 2 Based on a 20000 gallon Above Ground Fuel Storage Tank Total Yard Storage Areas for the Facility (SF)39,300 Public Works Facility Calculator - Facility Data Input Provided by Maintenance Design Group, LLC 72 Facility Data Entry Provided for your use by : Public Works Facility SPACES ANTICIPATED TO BE INCLUDED AT YOUR FACILITY Exterior Storm Water Management Areas Detention/Retention Ponds 150' x 150'22500 22500 1 1/2 acre minimum. Area to be confirmed based on local requirements and adopted BMP's Vegetated Swales 5' x 100'500 500 1 Alternative Detention approach Alternative Parking SW Collection 5' x 10'50 600 12 Alternative Detention approach - based on employee parking spaces Total Yard Storage Areas for the Facility (SF)23,600 284,111Total Area Requirements for the Facility (SF) - less site circulation and drives Public Works Facility Calculator - Facility Data Input Provided by Maintenance Design Group, LLC 73 Macro Facility Space Needs Program Public Works Facility NO DATA ENTRY REQUIRED ON THIS PAGE Area (SQ. FT.) Building Areas Total Admin Office Areas 10,500 Total PW Shop & Storage Areas 33,900 Total Vehicle Maintenance Areas 19,200 Total Warehouse Areas 3,400 Total Interior Vehicle Storage Areas 48,000 Salt and Sand Storage Structures 8,000 Total All Building Areas 123,000 Covered Areas Total Covered Vehicle Storage Areas 27,400 Total Covered Fuel/Wash Areas 1,300 Total Covered Storage Areas 7,500 Total All Covered Areas 36,200 Public Works Facility Calculator Provided by Maintenance Design Gr p, LLC74 Macro Facility Space Needs Program Public Works Facility NO DATA ENTRY REQUIRED ON THIS PAGE Exterior Areas Total Parking Areas 61,900 Total Yard Storage Areas 39,300 Total Stormwater Management Areas 23,600 Total All Exterior Areas 124,800 Subtotal All Areas 284,000 Other Site Circulation, Setbacks and Landscaping - 75%213,000 Grand Total - Site Requirements 497,000Acres11.41 Provided for your use by : Public Works Facility Calculator Provided by Maintenance Design Gr p, LLC 75 Project Budget Worksheet Provided for your use by : Public Works Facility A B C D E F G H I K L Unit Unit Cost Adjustable Values Quantity Remarks Extended Cost (B x C) Design Contingency 15% (D x .15) Subtotal (D + E) General Conditions 7.0% (F x .07) Contractors Fee and Profit 3.5% (F x .035) Construction Contingency 5% (F x .05) End of the Day Cost/SF Total (Rounded) Site work Site Clearing/Development & Site Utility Extensions SF $2.00 497,000 Total Site Area $994,000 $149,100 $1,143,100 $80,017 $40,009 $57,155 $2.70 $1,320,300 Site Landscaping/Security Fencing SF $0.75 74,550 15% of Total Site Area $55,913 $8,387 $64,299 $4,501 $2,250 $3,215 $1.00 $74,300 Paving (Asphalt and Concrete)SF $6.25 61,888 Area Calculated Based on Parking $386,800 $58,020 $444,820 $31,137 $15,569 $22,241 $8.30 $513,800 Subtotal for Site work $1,436,713 $215,507 $1,652,219 $115,655 $57,828 $82,611 $1,908,400 Building Areas Total Admin Office Areas SF $300.00 10,500 $3,150,000 $472,500 $3,622,500 $253,575 $126,788 $181,125 $398.50 $4,184,000 Total PW Shop & Storage Areas SF $150.00 33,900 $5,085,000 $762,750 $5,847,750 $409,343 $204,671 $292,388 $199.20 $6,754,200Total Vehicle Maintenance Areas SF $200.00 19,200 $3,840,000 $576,000 $4,416,000 $309,120 $154,560 $220,800 $265.70 $5,100,500 Total Warehouse Areas SF $100.00 3,400 $340,000 $51,000 $391,000 $27,370 $13,685 $19,550 $132.80 $451,600 Total Interior Vehicle Storage Areas SF $100.00 48,000 $4,800,000 $720,000 $5,520,000 $386,400 $193,200 $276,000 $132.80 $6,375,600 Salt and Sand Storage Structures SF $80.00 8,000 $640,000 $96,000 $736,000 $51,520 $25,760 $36,800 $106.30 $850,100 Covered Areas Total Covered Vehicle Storage Areas SF $30.00 27,400 $822,000 $123,300 $945,300 $66,171 $33,086 $47,265 $39.80 $1,091,800 Total Covered Fuel/Wash Areas SF $55.00 1,300 $71,500 $10,725 $82,225 $5,756 $2,878 $4,111 $73.10 $95,000 Total Covered Storage Areas SF $30.00 7,500 $225,000 $33,750 $258,750 $18,113 $9,056 $12,938 $39.90 $298,900 FF&E (Administrative areas)SF $20.00 10,500 Based on typical office systems furniture $210,000 $31,500 $241,500 $0 $0 $12,075 $24.20 $253,600 Maintenance & Storage Equipment SF $25.00 56,500 Includes Lifts, Cranes, Shop and Storage Equipment $1,412,500 $211,875 $1,624,375 $0 $0 $81,219 $30.20 $1,705,600 Fuel and Wash Equipment SF $50.00 1,300 Includes Automated Wash Systems and typical Fueling Systems $65,000 $9,750 $74,750 $0 $0 $3,738 $60.40 $78,500 Subtotal for Building Areas $20,596,000 $3,089,400 $23,685,400 $1,527,367 $763,683 $1,184,270 $27,239,400 Subtotal $22,032,713 $3,304,907 $25,337,619 $1,643,022 $821,511 $1,266,881 $29,147,800 Architectural/Engineering Fees %10%$2,914,780 Surveys/Tests/Reports %1%$291,478 Environmental Reports LS $50,000.00 $50,000 Construction Management %2%$582,956 Subtotal $3,839,214 Total $22,032,713 $3,304,907 $25,337,619 $1,643,022 $821,511 $1,266,881 $32,987,014 Total Cost Rounded and in Current Year Dollars $32,988,000 Item Public Works Facility Calculator - Project Budget Worksheet Provided by Maintenance Design Group, LLC 76 Total Cost with 1 year of escalation @ 3.5%$34,143,000 Total Cost with 2 years of escalation @ 3.5%$35,298,000 Total Cost with 3 years of escalation @ 3.5%$36,494,000 Total Cost with 4 years of escalation @ 3.5%$37,730,000 Total Cost with 5 years of escalation @ 3.5%$39,008,000 Public Works Facility Calculator - Project Budget Worksheet Provided by Maintenance Design Group, LLC 77 Staffing Costs Division 2018 2019 2020 2021 2022 2023 Future Engineering 226,200$ 312,736$ 442,468$ 455,742$ 578,164$ 707,159$ -$ Facilities 186,672$ 249,248$ 319,399$ 328,981$ 418,998$ 431,568$ -$ Fleet 78,300$ 158,949$ 242,017$ 249,278$ 256,756$ 264,459$ -$ Parks -$ -$ -$ -$ -$ -$ -$ Streets 119,650$ 185,912$ 345,925$ 466,246$ 480,233$ 494,641$ -$ Annual Cost 610,821$ 906,846$ 1,349,810$ 1,500,247$ 1,734,152$ 1,897,827$ -$ Hard Costs & Space Needs Office:98,000$ 56,000$ 98,000$ 42,000$ 42,000$ 42,000$ -$ Workspace:180,000$ 288,000$ 288,000$ -$ -$ -$ -$ Vehicle:153,000$ 101,500$ 157,000$ 66,000$ 60,000$ 45,000$ -$ Equipment:26,000$ 321,000$ 51,000$ 31,000$ 36,000$ 36,000$ -$ Annual Cost 457,000$ 766,500$ 594,000$ 139,000$ 138,000$ 123,000$ -$ Total Annual Cost 1,067,821$ 1,673,346$ 1,943,810$ 1,639,247$ 1,872,152$ 2,020,827$ -$ Funding Sources 2018 2019 2020 2021 2022 2023 Future General Fund 570,872$ 615,984$ 1,087,541$ 861,277$ 1,152,653$ 1,281,212$ -$ (General Fund)(75,650)$ (75,650)$ (75,650)$ (75,650)$ (75,650)$ (75,650)$ -$ Internal Service Fund 286,300$ 366,949$ 450,017$ 249,278$ 256,756$ 264,459$ -$ Enterprise Fund 210,650$ 690,412$ 406,252$ 391,721$ 402,123$ 412,836$ -$ 1A Tax Fund -$ -$ -$ -$ -$ -$ -$ Grant Fund -$ -$ -$ -$ -$ -$ -$ Annual Funding:992,171$ 1,597,696$ 1,868,160$ 1,426,626$ 1,735,882$ 1,882,858$ -$ Public Works Facilities Division Staffing Project Summary 78 Staffing Costs 2018 2019 2020 2021 2022 2023 Future Stormwater Engineer 113,100$ 116,493$ 119,988$ 123,587$ 127,295$ 131,114$ -$ Dev. Rev. Engineer 113,100$ 116,493$ 119,988$ 123,587$ 127,295$ 131,114$ -$ Project Associate -$ 79,750$ 82,143$ 84,607$ 87,145$ 89,759$ -$ Capital Project Engineer -$ -$ 120,350$ 123,961$ 127,679$ 131,510$ -$ Construction Manager -$ -$ -$ -$ 108,750$ 112,013$ -$ Engineer Tech.-$ -$ -$ -$ -$ 111,650$ -$ 0 -$ -$ -$ -$ -$ -$ -$ 0 -$ -$ -$ -$ -$ -$ -$ 0 -$ -$ -$ -$ -$ -$ -$ Annual Cost 226,200$ 312,736$ 442,468$ 455,742$ 578,164$ 707,159$ -$ Hard Costs & Space Needs Office:84,000$ 42,000$ 42,000$ -$ 42,000$ 42,000$ -$ Workspace:-$ -$ -$ -$ -$ -$ -$ Vehicle:30,000$ -$ 15,000$ -$ 30,000$ 15,000$ -$ Equipment:10,000$ 5,000$ 5,000$ -$ 5,000$ 5,000$ -$ Annual Cost 124,000$ 47,000$ 62,000$ -$ 77,000$ 62,000$ -$ Funding Sources 2018 2019 2020 2021 2022 2023 Future General Fund 350,200$ 359,736$ 504,468$ 455,742$ 655,164$ 769,159$ -$ (General Fund)-$ -$ -$ -$ -$ -$ -$ Internal Service Fund -$ -$ -$ -$ -$ -$ -$ Enterprise Fund -$ -$ -$ -$ -$ -$ -$ 1A Tax Fund -$ -$ -$ -$ -$ -$ -$ Grant Fund -$ -$ -$ -$ -$ -$ -$ Annual Funding:350,200$ 359,736$ 504,468$ 455,742$ 655,164$ 769,159$ -$ Public Works Engineering Division Staffing Project Summary 79 Staffing Costs 2018 2019 2020 2021 2022 2023 Future Maintenance Worker 1 56,976$ 58,686$ 60,446$ 62,260$ 60,900$ 62,727$ -$ Maintenance Worker 2 -$ -$ 62,673$ 64,554$ 66,490$ 68,485$ -$ Maintenance Supervisor -$ -$ -$ -$ 83,375$ 85,876$ -$ Maintenance Seasonal -$ -$ -$ -$ -$ -$ -$ Janitorial Supervisor 71,010$ 73,140$ 75,334$ 77,594$ 79,922$ 82,320$ -$ Janitorial Worker 1 58,686$ 60,446$ 62,260$ 64,127$ 66,051$ 68,033$ -$ Janitorial Worker 1 -$ 56,976$ 58,686$ 60,446$ 62,260$ 64,127$ -$ Janitorial Worker 2 -$ -$ -$ -$ -$ -$ -$ Janitorial Seasonal -$ -$ -$ -$ -$ -$ -$ Annual Cost 186,672$ 249,248$ 319,399$ 328,981$ 418,998$ 431,568$ -$ Hard Costs & Space Needs Office:-$ -$ -$ -$ -$ -$ -$ Workspace:-$ -$ -$ -$ -$ -$ -$ Vehicle:33,000$ 6,000$ 6,000$ 6,000$ 6,000$ 6,000$ -$ Equipment:1,000$ 1,000$ 1,000$ 1,000$ 1,000$ 1,000$ -$ Annual Cost 34,000$ 7,000$ 7,000$ 7,000$ 7,000$ 7,000$ -$ Funding Sources 2018 2019 2020 2021 2022 2023 Future General Fund 220,672$ 256,248$ 326,399$ 335,981$ 425,998$ 438,568$ -$ (General Fund)(75,650)$ (75,650)$ (75,650)$ (75,650)$ (75,650)$ (75,650)$ -$ Internal Service Fund -$ -$ -$ -$ -$ -$ -$ Enterprise Fund -$ -$ -$ -$ -$ -$ -$ 1A Tax Fund -$ -$ -$ -$ -$ -$ -$ Grant Fund -$ -$ -$ -$ -$ -$ -$ Annual Funding:145,022$ 180,598$ 250,749$ 260,331$ 350,348$ 362,918$ -$ Public Works Facilities Division Staffing Project Summary 80 Staffing Costs Position Title 2018 2019 2020 2021 2022 2023 Future Mechanic II 78,300$ 80,649$ 83,068$ 85,561$ 88,127$ 90,771$ -$ Mechanic II -$ 78,300$ 80,649$ 83,068$ 85,561$ 88,127$ -$ Mechanic II -$ -$ 78,300$ 80,649$ 83,068$ 85,561$ -$ 0 -$ -$ -$ -$ -$ -$ -$ 0 -$ -$ -$ -$ -$ -$ -$ 0 -$ -$ -$ -$ -$ -$ -$ 0 -$ -$ -$ -$ -$ -$ -$ 0 -$ -$ -$ -$ -$ -$ -$ 0 -$ -$ -$ -$ -$ -$ -$ Annual Cost 78,300$ 158,949$ 242,017$ 249,278$ 256,756$ 264,459$ -$ Hard Costs & Space Needs Office:14,000$ 14,000$ 14,000$ -$ -$ -$ -$ Workspace:144,000$ 144,000$ 144,000$ -$ -$ -$ -$ Vehicle:35,000$ 35,000$ 35,000$ -$ -$ -$ -$ Equipment:15,000$ 15,000$ 15,000$ -$ -$ -$ -$ Annual Cost 208,000$ 208,000$ 208,000$ -$ -$ -$ -$ Funding Sources 2018 2019 2020 2021 2022 2023 Future General Fund -$ -$ -$ -$ -$ -$ -$ (General Fund)-$ -$ -$ -$ -$ -$ -$ Internal Service Fund 286,300$ 366,949$ 450,017$ 249,278$ 256,756$ 264,459$ -$ Enterprise Fund -$ -$ -$ -$ -$ -$ -$ 1A Tax Fund -$ -$ -$ -$ -$ -$ -$ Grant Fund -$ -$ -$ -$ -$ -$ -$ Annual Funding:286,300$ 366,949$ 450,017$ 249,278$ 256,756$ 264,459$ -$ Public Works Fleet Division Staffing Project Summary 81 Staffing Costs 2018 2019 2020 2021 2022 2023 Future Annual Cost -$ -$ -$ -$ -$ -$ -$ Hard Costs & Space Needs Office: Workspace: Vehicle: Equipment: Annual Cost -$ -$ -$ -$ -$ -$ -$ Funding Sources 2018 2019 2020 2021 2022 2023 Future General Fund (General Fund) Internal Service Fund Enterprise Fund 1A Tax Fund Grant Fund Annual Funding:-$ -$ -$ -$ -$ -$ -$ Public Works Parks Division Staffing Project Summary 82 Staffing Costs Position Title 2018 2019 2020 2021 2022 2023 Future SWEO1 62,673$ 64,554$ 66,490$ 68,485$ 70,539$ 72,656$ -$ SWM1 56,976$ 58,686$ 60,446$ 62,260$ 64,127$ 66,051$ -$ SWM2 -$ 62,673$ 64,554$ 66,490$ 68,485$ 70,539$ -$ SWSUP -$ -$ 91,762$ 94,515$ 97,350$ 100,271$ -$ SEO1 -$ -$ 62,673$ 64,554$ 66,490$ 68,485$ -$ SSSUPER -$ -$ -$ 109,943$ 113,242$ 116,639$ -$ 0 -$ -$ -$ -$ -$ -$ -$ 0 -$ -$ -$ -$ -$ -$ -$ 0 -$ -$ -$ -$ -$ -$ -$ Annual Cost 119,650$ 185,912$ 345,925$ 466,246$ 480,233$ 494,641$ -$ Hard Costs & Space Needs Office:-$ -$ 42,000$ 42,000$ -$ -$ -$ Workspace:36,000$ 144,000$ 144,000$ -$ -$ -$ -$ Vehicle:55,000$ 60,500$ 101,000$ 60,000$ 24,000$ 24,000$ -$ Equipment:-$ 300,000$ 30,000$ 30,000$ 30,000$ 30,000$ -$ Annual Cost 91,000$ 504,500$ 317,000$ 132,000$ 54,000$ 54,000$ -$ Funding Sources 2018 2019 2020 2021 2022 2023 Future General Fund -$ -$ 256,673$ 69,554$ 71,490$ 73,485$ -$ (General Fund)-$ -$ -$ -$ -$ -$ -$ Internal Service Fund -$ -$ -$ -$ -$ -$ -$ Enterprise Fund 210,650$ 690,412$ 406,252$ 391,721$ 402,123$ 412,836$ -$ 1A Tax Fund -$ -$ -$ -$ -$ -$ -$ Grant Fund -$ -$ -$ -$ -$ -$ -$ Annual Funding:210,650$ 690,412$ 662,925$ 461,274$ 473,613$ 486,321$ -$ Public Works Streets Division Staffing Project Summary 83 Space Planning Tools: 1.Space/Cost needs Spreadsheet (APWL Tool): Documentation of (current and future) people and uses, then, application of industry standard square footage and cost estimate based on industry average costs. Good comp for cross check of requirements developed in Estes specific Programmatic Development 2.Programmatic Development (SEPS II / SpaceIntoPlace): Estes Park Staff and use specific - current and projected space needs as data gathered from user (rather than industry standard sizes) then needs as well as resources developed in detail for use in strategic space planning. Data gathered in spreadsheet and PQ’s: Goals of Elm Road Effort (Programmatic Development): 1.To provide framework for short term space planning solutions (example: Town Hall and the Elm Road Facility shops and outdoor storage). Programmatic Questionnaires will facilitate data collection about programmatic elements (needs and resources) and create a collaborative mapping tool to facilitate space allocation. 2.Provide a framework for continued data gathering and collaborative planning of all Town assets. 3.Generate a “Problem Statement” regarding current and future space utilization, for use in long term future planning. Method: Identify all programmatic elements for consideration of inclusion. Decision on inclusion or elimination to be made in the next phase. Identification: 1. Needs: verification with current specific users/staff to comprehensively identify and assess all needed programmatic elements: people, equipment, materials requiring space and land 2. Resources: buildings and land providing usable space The characteristics of these elements (size, required adjacencies, acoustic, etc.) are logged to enable effective and cooperative space planning. The following Inventories to be collected: 1. Space Needs A. People - Existing and Future requiring space (list of people to be included/considered in the scope, and can be person specific (e.g. Joe Lockhart) or more general (one additional Public Works staff) B. Materials: Existing and Future requiring space (list of materials to be included/considered in the scope, some examples: light poles, transformers, road base, etc.) C. Equipment: Existing and Future requiring space (list of materials to be included/considered in the scope, some examples: Front End Loader, Work Truck, patrol car in for repair, etc.) 2. Space Resources A. Existing Buildings (List of buildings to be a part of this scope that can accommodate the people, materials and equipment. We can add size and other characteristics in the next phase) B. Existing Land (List of land to be a part of this scope that can accommodate the people, materials and equipment. We can add size and other characteristics in the next phase) 84 Current Status: Nearly complete initial spreadsheet data collection (done by Kayla Downey), next step Progammatic Questionnaries to be tailored to department needs and completed. Next Steps: 1.Completion of data collection (including resources) 2.Programmatic assessment to determine final needs (includes costs to Town for inadequate facility and prioritization tools) 3.Current needs and resource mapping 4.Development of problem statement (identification of shortfall) 5.Collaborative Master Planning for current and future utilization of Town assets 85 Elm Road Project Light & Power Item Space required L x H in SF Current Storage Location Additional Storage need Access/ Schedule Proximity Cost for not being stored properly Notes Overhead Inventory 60 x 30 x 12 615 Elm Road Inventory Cage Daily Good n/a X-ARM PIN POLE TOP RIDGE PIN SADDLE PIN OFFSET POLE TOP RIDGE PIN INSULATOR PINTYPE EPOXILATOR N.P. FIBERGLASS STANDOFF N.P.18" FBRGLSS STANDOFF 18" STRAIN INSULATOR CLEV 54" STRAIN INSULATOR EYE DEAD END EXT. INS. POLYMER VICE TOP INSULATR N.P.15" FBRGLSS STANDOFF N.P.18" FBRGLSS STANDOFF 18" STRAIN INSULATOR EYE CONTINENTAL PUSH BRACE 1-PHASE EQUIPMENT BRKT CS820 CABLE POSITIONER 300A AMP CUTOUT 600A DISCONNECT SWITCH X-ARM 600A DISCONNECT 300 AMP LOADBREAK CUTOUT 600A LINE TENSION DISCONN 3-PHASE EQUIPMENT BRKT 8' HUGHES DE ASSEMBLY BRACES CROSSARM WOOD CAPACITOR SANG. 7200V DISTRIBUTION ARRESTER RISER ARRESTER 600A BRONZE PADDLE Overhead Expensed 79 x 40 x 8 615 Elm Road Inventory Cage Daily Good Overhead Wire 65 x 55 L&P Boneyard Frequent Good n/a DUPLEX ALUM. #6ACSR DUPLEX ALUM. #4ACSR TRIPLEX #4ACSR TRIPLEX #2ACSR TRIPLEX #1/0ACSR TRIPLEX #4/0ACSR XLP QUADRAPLEX #2ACSR QUADRAPLEX #1/0ACSR QUADRAPLEX #4/0ACSR #4 ACSR SWANATE RAVEN 1/0 6/1 ACSR 1/0 ACSR AWG 15 KV TREE NEXANS 4/0 ACSR 15KV HENDRIX #4 TREE CABLE #4/0-6/1 PENGUIN #2 TREE CABLE SOUTHWIRE Underground Expensed 24 x 8 x 1.5 615 Elm Road Inventory Cage Daily Good n/a Underground Inventory 67x 30 x 15 615 Elm Road Inventory Cage Daily Good LBC-2 RTE W/1U-STRAP LBC-3 ELASTIMOLD W/2 LBC-3 RTE W/BRACKET 200A. LBC-4 ELASTIMOLD W/2 STPS VBJ-2 600A JUNCTION VBJ-3 600A JUNCTION CONNECTING PLUG FOR VBJ-4 600A JUNCTION 1/0 STR TERMINATOR ELASTIMOLD 2 STR. ELASTIMOLD 4/0 STR. 750 MCM TERMINATION KIT 350 MCM SLIP ON TERMINATR 200A ELBOW ARRESTER #2 AWG CABLE SEAL KIT 86 #2 AWG ELASTIMOLD ELBOW 1/0 ELASTIMOLD ELBOW 4/0 ELASTIMOLD ELBOW 350 MCM T-BODY KIT 4/0 T-BODY KIT 750 MCM CABLE SEAL KIT 750 MCM T-BODY KIT 600A BUSHING EXTENDER 200A PARKING STAND ARREST 4/0 FUSED ELBOW #2 FUSED ELBOW #2 ELBOW 40A FUSE 4/0 ELBOW 80A FUSE #2 EXTENED ELBOW 4/0 EXTENED ELBOW 200A 1/0 UG PRI SPLICE 4/0 SPLICING KIT #2-4/0 COLD SHRINK SPLICE 750 MCM PRIMARY SPLICE 750 MCM COLD SHRINK SPLIC 200A PRKNG BSHNG/STANOFF 600A PRKNG BSHNG/STANDOFF 600A/200A REDUCING TP PLG BUSHING WELL INSERT 200A. REDUCING TAP WELL 600AMP 200 AMP PRO CAP 167 DRG 600A 15KV PROTECTIVE CAP FEED THRU INSERT-200 A FEED THRU LOADBREAK 15 KV 600 AMP ALANTIC VENTILATOR Underground Transformers 55 x 28 615 Elm Road West side of building Frequent Good n/a Underground Cabinets 60 x 60 26" 1-PHASE CABINET GR. SLEEVE TRANS-BASE 5'3-PHASE GRND SLEEVE 5'3-PHASE CABINET PRI-METER CABINET 26" 1-PHASE GRND SLEEVE 67" 3-PHASE CABINET 67" 3-PHASE GRND SLEEVE FIBERGLASS GROUND SLEEVE TRANS. PAD 48" X 48" PRIMARY METER GROUND NORDIC CABINET TRANS PAD 1-PHASE TRANS PAD 3-PHASE Underground Wire 44 x 54 L&P Bone yard Additional 672 Square ft Frequent Good We are currently storing 672 Square feet worth of wire right infront of building limiting access to building QUAD-4/0-4/0-4/0-2/0 4/0 AL 15KV W/220 MIL TR UG-TRI 1/0-1/0-1/0 BER 4/0-4/0-2/0-UG-TRI-SWE UG TRI 350-350-4/0 WES UG TRI 500/500/350-RIDER 750MCM AL 15KV W/220 MIL #2 AL 15KV 220 MIL TRXLP #2 ALUM - NO JACKET-ONLY Poles 181 x 35 Public Works Bone Yard 181 x 35 Frequent Bad We are currently storing at Public Works Bone Yard, because we do not have the accessible room to store on our property POLE 30' CL4 POLE 35' CL4 POLE 40' CL2 POLE 40' CL4 POLE 45' CL2 POLE 45' CL4 POLE 50' POLE 55' 87 Pole Spill Over 40 x 25 L&P Boneyard Frequent Bad Because of drainage issues, our trucks sink, making it very difficult to access our pole spill over area. This area is behind the old L&P building Cross Arms 50 x 30 L&P Boneyard Frequent Good CROSSARM WOOD 5'X7" CROSSARM 8'X 7" CROSSARM 10'X 7" RAINIER 8' BRACELESS CROSSARMS 8' HUGHES DE ASSEMBLY BRACES CROSSARM WOOD BRACES CROSSARM WOOD BRACES CROSSARM WOOD BRACES ALLEY ARM ALUMA BRACES ALLEY ARM ALUMA CROSSARM 8' FIBERGLASS CROSSARM 10' FIBERGLASS 5' FIBERGLASS CROSSARMS House Keeping 8 x 8 x 5 615 Elm Road Inventory Cage Frequent Good n/a Expensed Hardware 38 x 30 x 8 615 Elm Road Inventory Cage Daily Good Capital Projects 34 x 21 640 Elm Road Bay 1 2+ bays Daily Good Starting in 2015 L&P will be taking on 2 more capital projects, increasing inventory 3-PHASE FBGL. GANG SWITCH ANCHOR ROCK 3/4" X 15" ANCHOR ROCK 3/4" X 30" ANCHOR MODULES Snowcat 12 x 30 640 Elm Road Bay 1 Rarely Good Needs to be continued to be stored inside to avoid cost in repairs. O.H. Copper 364 x 6 640 Elm Road Bay 1 Daily Good Transformers that Leak 10 x 10 640 Elm Road Bay 1 300 Square feet Frequent Good All bad transformers should be stored inside, due to lack of space we only store ones inside that we know are leaking Scrap Wire 10 x 12 640 Elm Road Bay 1 Daily Good Traffic Control 24 x 3 640 Elm Road Bay 1 Daily Good Christmas Decorations 16 x 16 640 Elm Road Bay 2 Rarely n/a Primary Meters 7 x 5 640 Elm Road Bay 2 Daily Good Street Light Heads 3 x 12 640 Elm Road Bay 2 Daily Good Maps 26 x 5 640 Elm Road Bay 2 Never n/a Light & Power does not reference these maps Polaris Ranger XP900 10 x 6 641 Elm Road Bay 2 Truck 24 37 x 18 640 Elm Road Bay 3 Daily Good Street Light Wire 2x 8 640 Elm Road Bay 3 Daily Good Street Light Work Area 22 x 12 640 Elm Road Bay 4 Daily Good Street Light Heads 19 x 3 640 Elm Road Bay 4 Daily Good Street Light Bases 14 x 3 640 Elm Road Bay 4 Daily Good Underground Tugger 18 x 8 640 Elm Road Bay 4 Daily Good Needs to be continued to be stored inside to avoid cost in repairs Underground Pull Boxes 50 x 50 L&P Boneyard Frequent Decent Behind sand shed. Could be more easily accessed due to run off causing sinking PE-20 GS PE-20 FLAT LID PENCELL PE-30HD GROUND SLEEVE PE-30 FLAT TOP QUAZITE COMPOSOLITE QUAZITE COMPOSOLITE PE-9 SECONDARY PEDESTAL PV4848CA0017P PE-20 DOME TOP PULL BOX CARSON BROOKS PG3048Z500TE 12 X 17 X 18 C1015D 88