HomeMy WebLinkAboutPACKET Public Works, Utilities and Public Safety 2015-08-13
Thursday, August 13, 2015
Public Safety, Utilities 8:00 a.m.
& Public Works Committee Town Board Room
1. PUBLIC COMMENT
2. PUBLIC SAFETY
a) RECOMMENDATIONS TO THE TOWN BOARD
i. None.
b) REPORTS
i. Verbal Updates and Committee Questions.
3. UTILITIES
a) RECOMMENDATIONS TO THE TOWN BOARD
i. Seasonal Decorations Contract. Supt. Lockhart
ii. L&P 2005 International Bucket Truck Replacement. Supt. Lockhart
iii. L&P 2001 Ford 3500 Duty Truck Replacement. Supt. Lockhart
iv. L&P Breakroom Remodel Contract. Supt. Lockhart
b) REPORTS
i. Status of Capital Projects. Dir. Bergsten
ii. Utilities Department Staffing. Dir. Bergsten
iii. Verbal Updates and Committee Questions.
Smart Meter Program. Supt. Lockhart
4. PUBLIC WORKS
a) RECOMMENDATIONS TO THE TOWN BOARD
i. None.
b) REPORTS
i. Verbal Updates and Committee Questions.
5. ADJOURN
AGENDA
Light & Power Department Memo
To: Public Safety, Utilities and Public Works Committee
Town Administrator Lancaster
From: Joe Lockhart, Light & Power Superintendent
Date: August 13, 2015
RE: Seasonal Decorations Contract
Objective:
To obtain approval to award the 2015 – 2018 Seasonal Display Installation,
Maintenance and Removal Contract to Adam’s Tree Service.
Present Situation:
This past year the Town of Estes Park has tried to improve the way that downtown
looks during the holidays. We have upgraded to LED lights and also have changed
the colors to try to make it more appealing.
We recently went out to bid for a contract from fall of 2015 thru spring of 2018. In the
Request for Proposal (RFP) we spelled out the design to the contractors in great
detail and we are expecting the downtown area to look even better this season. The
new design has doubled the lights and is more detailed as to where we want to add
color. Light & Power has had great feedback from the public on last season’s design
and we are hoping to get the same response this year.
Quotes were received from three vendors as follows:
Adam’s Tree Service, P.O. Box 4420, Estes Park, Colorado 80517
Winter 2015/2016 = $108,000
Winter 2016/2017 = $109,500
Winter 2017/2018 = $111,250
Atkins Landscape Inc., P.O. Box 3602, Estes Park, Colorado 80517
Winter 2015/2016 = $94,320.00
Winter 2016/2017 = No response
Winter 2017/2018 = No response
Brite Nites, 6100 South Stratler Street Murray, Utah 84107
Winter 2015/2016 = $105,442.95
Winter 2016/2017 = No response
Winter 2017/2018 = No response
Proposal:
We propose to accept the complete bid from Adam’s Tree Service. Their bid was the
only one of the three that gave us a complete response to our RFP. Adam’s Tree
Service assisted the L&P crew with the installation and maintenance of last season’s
decorations and the new design so the Town is already familiar with their work on this
project. The service work we receive from Adam’s Tree Service has always been
exceptional and of very high quality.
Advantages:
• The cost effectiveness of using a contractor to do the work is better than having it
done by our Light & Power crew.
Disadvantages:
None.
Action Recommended:
Staff recommends approval of acceptance of the bid from Adam’s Tree Service and
execution of the proposed contract which is attached hereto.
Budget:
502-6501-560.26-15, Exhibit/Display, budgeted $85,000.00.
Note: Certain percentages of the contract dollars are paid out in segments: after
installation, during maintenance, and after removal. This will cover the dollars we will
need to pay out in 2015 for this season’s installation.
Level of Public Interest
High – this is a well-received program by our residents and guests.
Recommended Motion:
I recommend acceptance of the bid from Adam’s Tree Service and the execution of the
contract therefor to the Town Board, to be included on the Consent Agenda at the
August 25, 2015, Town Board meeting.
Attachment: Proposed Agreement for Professional Services
1 of 9
AGREEMENT FOR PROFESSIONAL SERVICES
THIS AGREEMENT FOR PROFESSIONAL SERVICES (this “Agreement”) is
made and entered into this day of , by and between the
Town of Estes Park, Country of Larimer, State of Colorado (the “Town”) and
Adam’s Tree Service, an independent contractor (“Contractor”).
WHEREAS, the Town requires professional contracting services related to the
SEASONAL DISPLAY INSTALLATION, MAINTENANCE AND REMOVAL; and
WHEREAS, Contractor has held itself out to the Town as having the requisite
expertise and experience to perform the required Contracting services;
NOW, THEREFORE, for the consideration hereinafter set forth, the receipt and
sufficiency of which are hereby acknowledged, the parties hereto agree as follows:
I. SCOPE OF SERVICES
A. Contractor shall furnish all labor and materials required for the complete
and prompt execution and performance of its duties, obligations, and responsibilities
(the “Work”) which are described or reasonably implied in Seasonal Display Installation,
Maintenance and Removal – “Fall 2015 to Spring 2018” PROJECT SPECIFICATIONS
which is provided as Exhibit A, attached hereto and incorporated herein by this
reference.
B. No material change to the PROJECT SPECIFICATIONS, including any
additional compensation, shall be effective or paid unless authorized by written
amendment executed by the Town. If Contractor proceeds without such written
authorization, then Contractor shall be deemed to have waived any claim for additional
compensation, including a claim based on the theory of unjust enrichment, quantum
merit or implied contract. Except as expressly provided herein, no agent, employee, or
representative of the Town is authorized to modify any term of this Agreement, either
directly or implied by a course of action.
II. REPORTS, DATA AND WORK PRODUCT
A. The Town shall provide Contractor with reports and such other data as
may be available to the Town and reasonably required by Contractor to perform the
Scope of Services. All documents provided by the Town to Contractor shall be returned
to the Town. Contractor is authorized by the Town to retain copies of such data and
materials at Contractor's expense.
2 of 9
B. Other than sharing information with designated third parties as previously
directed by the Town, no project information shall be disclosed by Contractor to third
parties without prior written consent of the Town or pursuant to a lawful court order
directing such disclosure.
C. The Town acknowledges that the documents created by Contractor for the
Project, including but not limited to drawings, designs, specifications, reports, and
incidental work or materials (the “Work Product”), are instruments of professional
service. Nevertheless, copies of the Work Product shall be provided to the Town and
other contractors and subcontractors shall be authorized to use and reproduce applicable
portions of the Work Product that are appropriate to use in the execution of their work
related to the Project. The Work Product shall become the property of the Town upon
completion of the Work. Contractor, however, shall retain its rights in its standard drawing
details, designs, specifications, databases, computer software and any other proprietary
property and all rights to any intellectual property developed, utilized, or modified in the
performance of the Work.
D. Contractor shall provide to the Town electronic versions of the Work
Product in the format directed by the Town.
III. COMPENSATION AND FINAL SETTLEMENT
A. In consideration for the completion of the Work by Contractor, the Town
shall pay Contractor $ 108,000.00 for the 2015/2016 season and contingent on
appropriations and performance for each of the remaining year, $ 109,500.00 for the
2016/2017 season and $ 111,250.00 for the 2017/2018 season. The amounts
specified herein shall include the fees and expenses anticipated to be incurred by
Contractor in performing all services hereunder, as described in Exhibit A. The amount
specified herein shall exclude the fees and expenses anticipated to be incurred by
others in performing the work described in Exhibit A.
B. If, on the basis of the Town’s observation of the Work and the Town's
review of the final invoice and accompanying documentation as required by this
Agreement, the Town is satisfied that the Work has been completed and Contractor other
obligations under this Agreement have been fulfilled, the Town will, within ten days
after receipt of the final invoice, schedule a date for final settlement, which final settlement
shall be duly advertised at least ten (10) days prior thereto by publication of notice thereof
at least twice in a public newspaper of general circulation published in Larimer County.
Otherwise, the Town will return the invoice to Contractor, indicating in writing the reasons
for refusing to schedule final settlement, in which case Contractor shall make the
necessary corrections and resubmit the invoice.
C. If the Town receives, at any time up to and including the date of final
settlement, a notarized statement by any person, partnership, or corporation, or other
entity that has furnished labor, materials, team hire, sustenance, provisions, provender,
or other supplies used or consumed by Contractor or any of its subcontractors in or about
the performance of the Work, or that supplies laborers, rental machinery, tools, or
equipment to the extent used in the prosecution of the Work, whose claim therefore has
not been paid by Contractor or any of its subcontractors, the Town shall withhold from
3 of 9
all payments to Contractor sufficient funds to insure the payment of said claims until the
same have been paid or such claims as filed have been withdrawn, such payment or
withdrawal to be evidenced by filing with the Town a receipt in full or an order for
withdrawal in writing and signed by the person filing such claim or his duly authorized
agent or assign. Such funds shall not be withheld longer than 90 days following the
date of final settlement as published unless an action is commenced within that time to
enforce such unpaid claim and a notice of lis pendens is filed with the Town.
D. Whenever a notarized statement of a claim has been filed in accordance
with this Section, Contractor may substitute a bond, pursuant to C.R.S. § 38-26-108, at
which time the Town shall release the funds being withheld pursuant to the notarized
statement of claim on the same terms and conditions as if the notarized statement of claim
had been released by the claimant.
E. Contractor understands that this is a contract for the design, construction
or repair of a public building or public work, and is therefore governed by C.R.S. §§ 38-
26-105 through 107. Contractor further understands that these statutory provisions are in
lieu of any lien rights. Contractor further understands that failure on the part of Contractor,
any subcontractor or any other entity furnishing labor or supplies to the Work must
follow the said statutory provisions in filing any claim for payment, and that failure on the
part of any such claimant to comply with said statutory requirements shall relieve the Town
from any liability for making payment to such claimant. Contractor agrees to include this
provision in any and all subcontracts.
IV. COMMENCEMENT AND COMPLETION OF WORK
The Contractor shall commence work as set forth in the PROJECT
SPECIFICATIONS or that portion of such work as is specified in said Notice. Except as
may be changed in writing by the Town, the PROJECT SPECIFICATIONS shall be
complete and Contractor shall furnish the Town the specified deliverables as provided in
Exhibit A.
V. PROFESSIONAL RESPONSIBILITY
A. Contractor hereby warrants that it is qualified to perform the Work, holds
all professional licenses required by law to perform the Work, and has all requisite
corporate authority to enter into this Agreement.
B. The Work shall be performed by Contractor in accordance with generally
accepted professional practices and the level of competency presently maintained by
other practicing professional firms performing the same or similar type of work in the
Denver metro area. The Work shall be done in compliance with applicable federal,
state and local laws, ordinances, rules and regulations.
C. Contractor shall be responsible for the professional quality, technical
accuracy, timely completion, and the coordination of all designs, drawings,
specifications, reports, and other services furnished by Contractor under this
Agreement. Contractor shall, without additional compensation, correct or resolve any
4 of 9
errors or deficiencies in its designs, drawings, specifications, reports, and other
services, which fall below the standard of professional practice, and reimburse the Town
for construction costs caused by errors and omissions which fall below the standard of
professional practice.
D. Approval by the Town of drawings, designs, specifications, reports, and
incidental work or materials furnished hereunder shall not in any way relieve Contractor
of responsibility for technical adequacy of the work. Neither the Town's review,
approval, or acceptance of, nor payment for, any of the Work shall be construed to
operate as a waiver of any rights under this Agreement or of any cause of action arising
out of the performance of this Agreement.
E. Because the Town has hired Contractor for its professional expertise,
Contractor agrees not to employ subcontractors to perform more than twenty percent
(20 %) of the work required under the PROJECT SPECIFICATIONS. Upon execution
of this Agreement, Contractor shall furnish to the Town a list of proposed
subcontractors, and Contractor shall not employ a subcontractor to whose employment
the Town reasonably objects. All contracts between Contractor and subcontractors
shall conform to this Agreement including, but not limited to, Section XI, L.
VI. INSURANCE
A. Contractor agrees to procure and maintain, at its own cost, a policy or
policies of insurance sufficient to insure against all liability, claims, demands, and other
obligations assumed by Contractor pursuant to this Agreement. Such insurance shall
be in addition to any other insurance requirements imposed by law.
B. Contractor shall procure and maintain, and shall cause any subcontractor
of Contractor to procure and maintain, the minimum insurance coverages listed below.
Such coverages shall be procured and maintained with forms and insurers acceptable
to the Town. In the case of any claims-made policy, the necessary retroactive dates
and extended reporting periods shall be procured to maintain such continuous
coverage.
1. Worker's compensation insurance to cover obligations imposed by
applicable law for any employee engaged in the performance of work under this
Agreement, and Employer's Liability insurance with minimum limits of five
hundred thousand dollars ($500,000) each accident, five hundred thousand
dollars ($500,000) disease – policy limit, and five hundred thousand dollars
($500,000) disease – each employee. Evidence of qualified self-insured status
may be substituted for the worker's compensation requirements of this
paragraph.
2. Commercial general liability insurance with minimum combined
single limits of one million dollars ($1,000,000) each occurrence and one million
dollars ($1,000,000) general aggregate. The policy shall be applicable to all
premises and operations. The policy shall include coverage for bodily injury,
broad form property damage (including completed operations), personal injury
(including coverage for contractual and employee acts), blanket contractual,
independent contractors, products, and completed operations. The policy shall
5 of 9
contain a severability of interests provision. No additional insured endorsement
shall contain any exclusion for bodily injury or property damage arising from
completed operations.
C. Any insurance carried by the Town, its officers, its employees, or its
Contractors shall be excess and not contributory insurance to that provided by
Contractor. Contractor shall be solely responsible for any deductible losses under any
policy.
D. Contractor shall provide to the Town a certificate of insurance, completed
by Contractor's insurance agent, as evidence that policies providing the required
coverages, conditions, and minimum limits are in full force and effect. The certificate
shall identify this Agreement and shall provide that the coverages afforded under the
policies shall not be cancelled, terminated or materially changed until at least thirty (30)
days prior written notice has been given to the Town. The Town reserves the right to
request and receive a certified copy of any policy and any endorsement thereto.
E. Failure on the part of Contractor to procure or maintain the insurance
required herein shall constitute a material breach of this Agreement upon which the
Town may immediately terminate this Agreement, or at its discretion, the Town may
procure or renew any such policy or any extended reporting period thereto and may pay
any and all premiums in connection therewith, and all monies so paid by the Town shall
be repaid by Contractor to the Town upon demand, or the Town may offset the cost of
the premiums against any monies due to Contractor from the Town.
VII. INDEMNIFICATION
Contractor agrees to indemnify and hold harmless the Town and its officers,
insurers, volunteers, representatives, agents, employees and assigns from and against all
claims, liability, damages, losses, expenses and demands, including attorney's fees, on
account of injury, loss, or damage, including, without limitation, claims arising from
bodily injury, personal injury, sickness, disease, death, property loss or damage, or any
other loss of any kind whatsoever, which arise out of or are in any manner connected
with this Agreement or the Work if such injury, loss, or damage is caused in whole or in
part by, the negligent act, omission, error, professional error, mistake, negligence, or
other negligent fault of Contractor, any subcontractor of Contractor, or any officer,
employee, representative, or agent of Contractor or of any subcontractor of Contractor,
or which arise out of any workmen's compensation claim of any employee of Contractor
or of any employee of any subcontractor of Contractor. In any and all claims against
Town or any of its officers, insurers, volunteers, representatives, agents, employees or
assigns, by any employee of Contractor, any subcontractor of Contractor, anyone directly
or indirectly employed by any of them or anyone for whose act any of them may be liable,
the indemnification obligation under this Section VII shall not be limited in any way by any
limitation on the amount or type of damages, compensation or benefits payable by or for
Contractor or any subcontractor under worker’s compensation actions, disability benefit
acts or other employee benefit acts. In the event it becomes necessary for the Town to
bring any action to enforce any provision of this Agreement or to recover any damages the
Town may incur as a result of the breach of this Agreement, including, but not limited to,
defective work, and the Town prevails in such litigation, Contractor shall pay the Town its
6 of 9
reasonable attorneys’ fees as determined by the court.
VIII. TERMINATION
This Agreement shall terminate at such time as the Work is completed and the
requirements of this Agreement are satisfied, or upon the Town's providing Contractor
with seven (7) days advance written notice, whichever occurs first. If the Agreement is
terminated by the Town's issuance of written notice of intent to terminate, the Town
shall pay Contractor the reasonable value of all work previously authorized and
completed prior to the date of termination. If, however, Contractor has substantially or
materially breached this Agreement, the Town shall have any remedy or right of set-off
available at law and equity. If the Agreement is terminated for any reason other than
cause prior to completion of the Work, any use of documents by the Town thereafter
shall be at the Town's sole risk, unless otherwise consented to by Contractor.
Nothing herein shall constitute a multiple fiscal year obligation pursuant to
Colorado Constitution, Article X, Section 20. Notwithstanding any other provision of this
Agreement, the Town’s obligations under this Agreement are subject to annual
appropriation by the Town Board of the Town. Any failure of the Town Board annually
to appropriate adequate monies to finance the Town’s obligations under this Agreement
shall terminate this Agreement at such time as such then-existing appropriations are to
be depleted. Notice shall be given promptly to Contractor of any failure to appropriate
such adequate monies.
IX. CONFLICT OF INTEREST
The Contractor shall disclose any personal or private interest related to property
or business within the Town. Upon disclosure of any such interest, the Town shall
determine if the interest constitutes a conflict of interest. If the Town determines that a
conflict of interest exists, the Town may treat such conflict of interest as a default and
terminate this Agreement.
X. INDEPENDENT CONTRACTOR
Contractor is an independent contractor. Notwithstanding any other provision of
this Agreement, all personnel assigned by Contractor to perform work under the terms
of this Agreement shall be, and remain at all times, employees or agents of Contractor
for all purposes. Contractor shall make no representation that it is a Town employee for
any purposes.
XI. MISCELLANEOUS
A. Governing Law and Venue. This Agreement shall be governed by the
laws of the State of Colorado, and any legal action concerning the provisions hereof
shall be brought in Larimer County, Colorado.
B. No Waiver. Delays in enforcement or the waiver of any one or more
defaults or breaches of this Agreement by the Town shall not constitute a waiver of any
of the other terms or obligation of this Agreement.
7 of 9
C. Integration. This agreement and any attached exhibits constitute the
entire Agreement between Contractor and the Town, superseding all prior oral or written
communications.
D. Third Parties. There are no intended third-party beneficiaries to this
Agreement.
E. Notice. Any notice under this Agreement shall be in writing, and shall be
deemed sufficient when directly presented or sent pre-paid, first class United States
Mail, addressed as follows:
The Town: Town of Estes Park, Light & Power Department
PO Box 1200
Estes Park, CO 80517
Contractor: Adam’s Tree Service
PO Box 4420
Estes Park, CO 80517
F. Severability. If any provision of this Agreement is found by a court of
competent jurisdiction to be unlawful or unenforceable for any reason, the remaining
provisions hereof shall remain in full force and effect.
G. Modification. This Agreement may only be modified upon written
agreement of the parties.
H. Assignment. Neither this Agreement nor any of the rights or obligations of
the parties hereto, shall be assigned by either party without the written consent of the
other.
I. Governmental Immunity. The Town, its officers, and its employees, are
relying on, and do not waive or intend to waive by any provision of this Agreement, the
monetary limitations (presently one hundred fifty thousand dollars ($150,000) per
person and six hundred thousand dollars ($600,000) per occurrence) or any other
rights, immunities, and protections provided by the Colorado Governmental Immunity
Act, C.R.S. § 24-10-101, et seq., as amended, or otherwise available to the Town and
its officers or employees.
J. Rights and Remedies. The rights and remedies of the Town under this
Agreement are in addition to any other rights and remedies provided by law. The
expiration of this Agreement shall in no way limit the Town's legal or equitable remedies,
or the period in which such remedies may be asserted, for work negligently or
defectively performed.
K. Binding Effect. The Town and Contractor each bind itself, its successors
and assigns to the other party to this Agreement with respect to all rights and
obligations under this Agreement. Neither the Town nor Contractor shall assign or
transfer its interest in this Agreement without the written consent of the other.
8 of 9
L. Work By Illegal Aliens Prohibited.
a. Contractor hereby certifies that, as of the date of this Agreement, it
does not knowingly employ or contract with an illegal alien and that Contractor
has participated or attempted to participate in the basic pilot employment
verification program as defined in C.R.S. § 8-17.5-101(1) (“Program”) in order to
verify that it does not employ illegal aliens. b. Contractor shall not knowingly employ or contract with an illegal
alien to perform works under this Agreement or enter into a contract with a
subcontractor that fails to certify to Contractor that the subcontractor shall not
knowingly employ or contract with an illegal alien to perform work under this
Agreement. c. Contractor hereby certifies that it has verified or attempted to verify
through participation in the Program that Contractor does not employ any illegal
aliens and, if Contractor is not accepted into the Program prior to entering into
this Agreement, that Contractor shall apply to participate in the Program every three
(3) months until Contractor is accepted or this Agreement has been completed,
whichever is earlier.
d. Contractor is prohibited from using Program procedures to
undertake pre-employment screening of job applicants while this Agreement is
being performed.
e. If Contractor obtains actual knowledge that a subcontractor
performing work under this Agreement knowingly employs or contracts with an
illegal alien, Contractor shall be required to:
(i) notify the subcontractor and District within three (3) days that
Contractor has actual knowledge that the subcontractor is employing or
contracting with an illegal alien; and
(ii) terminate the subcontract with the subcontractor if within
three (3) days of receiving the notice required pursuant to this subparagraph
the subcontractor does not stop employing or contracting with the illegal
alien; except that Contractor shall not terminate the contract with the
subcontractor if during such three (3) days the subcontractor provides
information to establish that the subcontractor has not knowingly employed
or contracted with an illegal alien.
f. Contractor shall comply with any reasonable request by the
Colorado Department of Labor and Employment (“Department”) made in the course
of an investigation that the Department is undertaking pursuant to the authority
established in C.R.S. Article 17.5.
9 of 9
g. If Contractor violates this paragraph, District may terminate this
Agreement for breach of contract. If this Agreement is so terminated, Contractor
shall be liable for actual and consequential damages to the District.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on
the date first set forth above.
OWNER: CONTRACTOR
TOWN OF ESTES PARK, COLORADO
By:
Mayor
By:
Title:
Address:
ATTEST: ATTEST:
By:
Town Clerk
By:
(SEAL) (SEAL)
P a g e | 1
Town of Estes Park Seasonal Decorations – Project Specifications – Exhibit A to Agreement for Professional Services
Town of Estes Park Seasonal Decorations
PROJECT SPECIFICATIONS
Exhibit A
Listed are conditions essential to the successful completion of the project.
1 GENERAL:
1.1 The Town seeks a qualified contractor to partner with on the annual installation, maintenance
and removal of the seasonal exhibits, lights and decorations. Contingent on performance, this
is a three-year contract.
2 PROPOSAL DATE AND TIME:
2.1 Submit sealed bids by Friday, June 5, 2015, at 3:00 P.M. to Kayla Downey or Joe Lockhart by
hand delivery, U.S. mail or overnight shipping. Faxed or emailed bids will not be accepted.
3 PROJECT ADMINISTRATOR:
Kayla Downey, Administrative Assistant
Joe Lockhart, Superintendent Light & Power Department
170 MacGregor, Suite 100
P. O. Box 1200
Estes Park, CO 80517
Phone: (970) 577-3627
WALK-THRU ON WEDNESDAY, MAY 20, 2015, AT 10:00 A.M.
Meet at the Light & Power Shop, in Joe Lockhart’s office, located at 615 Elm Road, Estes
Park, CO, 80517.
4 PROJECT LOCATION:
4.1 Generally the downtown area of Estes Park and extending outward East on Highway 34 and
36, South on Highway 7, and West on Highway 34 and 36 approximately two (2) miles.
5 APPROXIMATE QUANTITIES:
5.1 String and maintain twinkle lights in trees throughout all of the downtown area, Confluence
Park, Sheep Island & Legion Islands, wrapping railings of bridges at entryways to parks,
hanging twinkle lights on shelter at Bond Park, and wrapping all decorative light poles
throughout downtown with blue twinkle lights.
5.1.1 String and maintain twinkle lights in approximately seventy-five (75) street trees in the downtown
corridor area including their trunks, wrapping 7-9 feet up from the crotch of the tree and stringing
canopies.
5.1.2 String and maintain lights in approximately twelve (12) large trees and approximately twenty (20)
small trees in Confluence Park. Wrap the railings of two bridges entering the park with twinkle
lights.
P a g e | 2
Town of Estes Park Seasonal Decorations – Project Specifications – Exhibit A to Agreement for Professional Services
5.1.3 String and maintain lights at Dairy Queen playground: approximately six (6) cottonwood trees,
approximately six (6) small trees, and the cluster of six (6) aspens at the entrance of the parking lot
along Elkhorn.
5.1.4 String and maintain lights at Bond Park: approximately five (5) blue spruce trees, three (3) 3-
foot spruce trees, cluster of four (4) cottonwood trees, and stringing lights around the peak of
the shelter building at Bond Park.
5.1.5 String and maintain lights at Tregent Park: one (1) spruce tree, approximately three (3)
cottonwoods, approximately four (4) aspens, one (1) birch, and (1) ash tree.
5.1.6 String and maintain lights at Sheep Island: approximately five (5) spruce trees, eight (8) aspen trees,
one (1) birch tree, and laying mesh netting light on approximately seven (7) juniper bushes.
5.1.7 String and maintain lights at both large and small Legion Islands: approximately four (4) large
evergreen trees and two (2) aspens on the small island; approximately seven (7) large evergreen
trees and one (1) aspen on the large island.
5.2 Hang and maintain approximately one hundred thirty (130) rigid rebar trees along
Highways 34 and 36 and 7 on the street light poles.
5.3 Erect displays, layout power cords for flood lights and cover with evergreen boughs for each
display located more specifically at:
5.3.1 The Card Shop - in front of Municipal Building with four small trees
5.3.2 Christmas in Bugville - in front of the Library with four small trees
5.3.3 The Lady in the Shoe – at the intersection of Stanley Avenue and Hwy. 7
5.3.4 Santa Claus and Reindeer – on top of the Knoll
5.4 Erect the two "Seasons Greetings" displays, one each on Highways 34 and 36.
5.5 String twinkle lights up approximately two hundred (200) Town Commons light poles throughout
downtown and the Riverwalk area.
6 CONTRACTOR’S RESPONSIBILITIES:
6.1 The contractor shall provide all labor and equipment to pick up materials from storage, verify
operation and repair as required all displays, rebar trees, twinkle lights, ancillary hardware and
lighting. The contractor shall identify and report nonfunctional power outlets. The contractor
shall install and maintain the previously described rebar trees, twinkle lights and displays.
Lighting, power cords and hardware are specific for each display. All power cords must be well
groomed and kept in a manner to avoid being hazardous to pedestrians.
6.2 The contractor is required to own or rent a bucket/lift truck. No agreement will be made with a
contractor that does not have or rent a functional bucket/lift truck. The contractor shall
provide all traffic control to State standards and abide by all rules and regulations as stated in
the MUTCD Manual.
6.3 At the end of the season, all of the lights, exhibits and decorations shall be returned to storage
in an organized and coordinated manner. The contractor is responsible for carefully re-reeling
all lights from the trees back onto the reels, which were provided by Light & Power. Reels of
lights must be stored properly for reuse the following season and should be plugged in before
being stored to verify all lights are still working correctly. Since the lighting, power cords and
hardware are specific to each display and decoration, they shall be stored in an orderly
P a g e | 3
Town of Estes Park Seasonal Decorations – Project Specifications – Exhibit A to Agreement for Professional Services
manner which allows them to be kept together.
7 PROJECT SCHEDULE:
7.1 Start Date: not on or before October 1, but immediately after.
7.1.1 Deadline for Completion of Installation: the Saturday before Thanksgiving Day.
7.2 Removal Dates:
7.2.1 For displays and rebar trees, by January 15, 2016.
7.2.2 For twinkle lights, by February 25, 2016. Lights are to stay lit and maintained until February 14, 2016.
8 REPAIR OF BROKEN OR DAMAGE MATERIALS:
8.1 From storage until removal at the end of the season, the contractor is responsible for all repairs
and expense of repairs to any broken or damaged displays, rebar trees, twinkle lights, ancillary
hardware and decorated landscape trees of any kind whether be it by wind or contractor error.
All items must be returned to the storage facility at the end of the project in as good, if not
better, condition than when taken from storage.
9 TOWN'S OBLIGATION:
9.1 The Town will supply all bulbs, string lights, extension cords, boughs and small trees. We will
also be responsible for the operation and maintenance of the stars and required repairs to
electrical outlets.
10 MAINTENANCE AND REPAIR:
10.1 The contractor will check all displays, rebar trees, twinkle lights and ancillary hardware and
make repairs as necessary including changing all burned out lights of any kind once per week
or as safety hazards are identified by the project administrator.
11 CONTRACT AWARD:
11.1 One contract will be awarded. The management and payment of sub-contractors and
employees is the duty of the general contractor.
12 PROPOSAL TYPE:
12.1 Lump sum (not to exceed). The quantity of actual trees decorated and hung may deviate from
the estimate. Please provide a price per tree decorated and rebar tree hung. A final count will
be made in the end and the lump sum bid will be adjusted either up or down depending on the
final quantity.
13 UNFORSEEN DIFFICULTIES:
13.1 Any difficulty not addressed by the specifications will be covered by the Town's General
Conditions for similar projects. A copy of these conditions is on file at the Municipal Building.
P a g e | 4
Town of Estes Park Seasonal Decorations – Project Specifications – Exhibit A to Agreement for Professional Services
14 INSURANCE AND WORKMEN'S COMPENSATION:
Prior to issuing a notice to proceed, the contractor will provide the Town with proof of Workmen's
Compensation and insurance to the following limits:
14.1 Statutory Workmen's Compensation
14.2 Contractor's Public Liability and Property Damage:
14.2.1 Bodily Injury:
14.2.2 Property Damage:
Each Person $250,000
Each Accident $600,000
Each Accident $250,000
All Accidents $600,000
14.3 Automobile Public Liability and Property Damage:
14.3.1 Bodily Injury:
14.4 Property Damage:
Each Person $250,000
Each Accident $600,000
Each Accident $250,000
15 ACCEPTANCE OR REJECTION OF PROPOSALS:
15.1 The Town reserves the right to accept or reject any or all proposals.
16 PAYMENT:
16.1 Startup costs of 20% will be paid at the beginning of the project. Contractor must submit an
invoice no later than September 14th for the startup costs. The payment will be available after
October 1st when the project begins.
16.2 After completion of installation, the contractor may invoice for no more than 40% of
the lump sum.
16.3 Upon removal of the rebar trees and displays, the contractor may invoice for no more than 20%
of the lump sum.
16.4 Upon removal of the twinkle lights, the contractor may invoice for 20% of the lump sum of the
project. The Town will pay all but remaining 5% of the lump sum which will be kept as
retainage and paid only after no claims are received three (3) weeks after the last publish date
of the “Notice of Final Payment”.
16.5 Any work accomplished that is not described by these specifications will be negotiated and
compensated separately. A written proposal of additional work must be submitted by the
contractor and approved by the Town before said additional work can proceed.
P a g e | 5
Town of Estes Park Seasonal Decorations – Project Specifications – Exhibit A to Agreement for Professional Services
17 ILLEGAL ALIENS – PUBLIC CONTRACTS FOR SERVICES:
17.1 The Contractor certifies that the Contractor shall comply with the provisions of CRS 8-17.5-101,
et seq. The Contractor shall not knowingly employ or contract with an illegal alien to perform
work under this contract or enter into a contract with a subcontractor that knowingly employs or
contracts with an illegal alien to perform work under this contract. The Contractor represents,
warrants, and agrees that it (i) has verified that it does not employ any illegal aliens, through
participation in the Basic Pilot Employment Verification Program administered by the Social
Security Administration and the Department of Homeland Security, or (ii) otherwise will comply
with the requirements of CRS 8-17.5-102(2)(b)(I).
The Contractor shall comply with all reasonable requests made in the course of an investigation
by the Colorado Department of Labor and Employment. If the Contractor fails to comply with
any requirement of this provision or CRS 8-17.5-101, et seq., the Town may terminate this
contract for breach of contract, and the Contractor shall be liable for actual and consequential
damages to the Town.
17.2 If the Contractor obtains actual knowledge that a subcontractor performing work under this
contract knowingly employs or contracts with an illegal alien, the Contractor shall: (a) notify the
subcontractor and the Town within three days that the Contractor has actual knowledge that the
subcontractor is employing or contracting with an illegal alien; and (b) terminate the subcontract
with the subcontractor if within three (3) days of receiving the notice required pursuant to sub-
paragraph (a) above, the subcontractor does not stop employing or contracting with the illegal
alien, unless the subcontractor provides information to establish that the subcontractor has not
knowingly employed or contracted with an illegal alien.
1 | P a g e
Town of Estes Park Seasonal Decorations Contract
∙Sample Exhibit∙
∙Downtown Corridor
∙Confluence Park
∙Legion Island
∙Sheep Island
Light & Power Department Memo
To: Public Safety, Utilities and Public Works Committee
Town Administrator Lancaster
From: Joe Lockhart, Light & Power Superintendent
Date: August 13, 2015
RE: L&P 2005 International Bucket Truck Replacement
Objective:
Obtain approval for the purchase of a bucket truck to replace Truck 25.
Present Situation:
The 2015 Vehicle Replacement budget includes $280,800 (page 157) for the
replacement of the 2005 International 7400, 4x4, Light & Power bucket truck, known as
Truck 25. This truck is 10 years old and has 39,645 miles and 1763 hours on the PTO.
It is within the replacement parameters of the time and operation cost (Replacement
Type seven (7) years).
Quotes were received from two vendors as shown below and are as follows:
Altec Industries, 1550 Aerial Avenue, Creedmoor, NC 27522
Base Price for Dodge 5500 bucket truck - $157,809.00
Tools - $27,349.64
Terex Utilities Inc., 200 Edenway Drive, White House, TN 37188
Base Price for Dodge 5500 bucket truck - $163,722.00
Tools – quote still pending
Note: Terex provides only two outriggers and we require four outriggers for better
stability and safety especially in this area’s uneven terrain.
Light & Power looked at two other companies, Hi-Ranger and Versalift, but neither one
of these vendors could meet our needs.
Proposal:
We propose to accept the low bid for the Dodge 5500 bucket truck from Altec Industries.
Advantages:
The new truck will improve reliability of the equipment and the work efficiency of our line
crew. Also, we have decided to purchase a smaller truck than in the past. This smaller
truck will be easier to maneuver on backroads and during inclement weather.
Disadvantages:
None.
Action Recommended:
Staff recommends approval of the purchase of the Dodge 5500 bucket truck from Altec
Industries for the base price of $157,809.00 plus $27,349.64 for tools.
Budget:
635-7000-435.34-42, Vehicle Replacement Fund, $280,800.00.
Level of Public Interest
Low as not many of our customers follow the types of trucks L&P uses for power line
construction and repair.
Recommended Motion:
I recommend acceptance of the bid from Altec Industries to purchase the Dodge 5500
bucket truck to the Town Board, to be included on the Consent Agenda at the August
25, 2015, Town Board meeting.
Light & Power Department Memo
To: Public Safety, Utilities and Public Works Committee
Town Administrator Lancaster
From: Joe Lockhart, Light & Power Superintendent
Date: August 13, 2015
RE: L&P 2001 Ford 3500 Duty Truck Replacement
Objective:
Obtain approval for the purchase of a duty truck to replace Truck 24.
Present Situation:
The 2015 Vehicle Replacement budget includes $89,822.00 (page 157) for the
replacement of the 2001 Ford 3500, F-250 4x4 Light & Power duty truck, known as
Truck 24. This truck is 14 years old and has 34K miles and 3600 hours on the PTO. It
is within the replacement parameters of the time and operation cost (Replacement Type
14 years or 50K miles). This will be for the truck only, not the bed. We are still waiting
for design and quotes for the bed.
Quotes were received from two vendors as shown below and are as follows:
Fort Collins Dodge, 3835 S. College Avenue, Fort Collins, Colorado 80525
Base Price for Dodge Ram 3500 (truck only) - $46,993.00
Johnson Auto Plaza Inc., 12410 East 136th Avenue, Brighton, CO 80601-7300
Base Price for Dodge Diesel (truck only) - $46,839.00
Two other vendors would not or could not quote for the reasons stated below:
Markley Motors, Inc., 3825 S. College Avenue, Fort Collins Colorado 80525
Base Price for GMC 5500 Sierra - $ N/A
GMC no longer makes a 5500.
Spradley Barr, 2601 S. College Avenue, Fort Collins, Colorado 80525
Base Price for Ford F350 - $ N/A
Ford was over a year out.
Proposal:
We propose to accept the low bid for the Dodge Diesel from Johnson Auto Plaza, Inc.
Advantages:
The new truck will improve reliability of the equipment and the work efficiency of our line
crew.
Disadvantages:
None.
Action Recommended:
Staff recommends approval of the purchase of the Dodge Diesel from Johnson Auto
Plaza, Inc., (truck only) for the base price of $46,839.00.
Budget:
635-7000-435.34-42, Vehicle Replacement Fund, $89,822.00.
Level of Public Interest
Low, as not many of our customers follow the types of trucks L&P uses for power line
construction and repair.
Recommended Motion:
I recommend acceptance of the bid from Johnson Auto Plaza, Inc., to purchase the
Dodge Diesel (truck only) to the Town Board, to be included on the Consent Agenda at
the August 25, 2015, Town Board meeting.
Light & Power Department Memo
To: Public Safety, Utilities and Public Works Committee
Town Administrator Lancaster
From: Joe Lockhart, Light & Power Superintendent
Date: August 13, 2015
RE: L&P Breakroom Remodel Contract
Objective:
To obtain approval to move forward with the breakroom remodel and to award the
construction bid to B&E Builders, Inc.
Present Situation:
Light & Power has outgrown the breakroom in the L&P shop at 615 Elm Road.
Proposal:
We propose to accept the low bid from B&E Builders, Inc., for this remodel.
Quotes were received from three local builders as follows:
B&E Builders, Inc., P.O. Box 2081, Estes Park, CO 80517
Price: $159,524.55
Kinley Built, 600 South Saint Vrain Avenue, Suite 4, Estes Park, CO 80517
Price: $190,500.00
Darling Enterprise, Inc., 3409 Eaglecliff Circle Drive, Estes Park, CO 80517
Price: $205,409.00
Advantages:
• This remodel will give the line crew staff a place to sit and fill out paperwork and
perform computer work.
• It will also create a larger room to allow for lockers for storage of cold weather
clothing and tools.
Disadvantages:
None.
Action Recommended:
Staff recommends approval of accepting the bid from B&E Builders, Inc.
Budget:
502-7001-580.32-22, Building Remodeling, $226,615.00.
Level of Public Interest
Low.
Recommended Motion:
I recommend acceptance of the bid from B&E Builders, Inc., to the Town Board, to be
included on the Consent Agenda at the August 25, 2015, Town Board meeting.
Utilities Department Report
To: Public Safety, Utilities & Public Works Committee
Town Administrator Lancaster
From: Reuben Bergsten, Utilities Director
Date: August 13, 2015
RE: Status of Capital Projects
Objective:
To inform the PUP Committee of capital project progress.
Present Situation:
In addition to flood recovery projects, the Utilities Department has a number of other
capital projects in progress or planned for this year which are listed below:
2015 Capital Projects Planning %
Complete
Construction/
Implementation
% Complete
Water Department
1. BOR Area Water Main Replacement 95% 0%
2. UTSD Lift Station New Water Main 100% 0%
3. Replacement and updating Water Plant SCADA
Equipment & Programming
100% 50%
4. Water Laboratory Construction 100% 70%
5. Plant Analyzers 100% 55%
6. Glacier Plant Filter Wall Modifications
(Engineering)
0% Pending Design
7. Distribution System Leak Survey 100% 5%
8. Chlorine Storage Relocation 100% 100%
9. State Sanitary Survey Priority Work, Chlorine
Room Safety (120-Day Window)
10% 0%
L& P Department
10. L&P SCADA Replacement and Programming 100% 85%
11. L&P Shop Remodel 100% 0%
12. Advanced Meter Infrastructure Pilot Project 100% 100%
13. 800MHz Radio Repeater for Allenspark 100% 100%
14. LED Street Lights 100% 80%
The Water main capital projects are on hold until the Fish Creek flood recovery work is
completed this fall.
An unexpected project (# 9) was the result of this year’s State Sanitary Survey. We’ve
been given 120 days to complete a safety-related modification to our chlorine room at
Glacier Water Treatment Plant. Chlorine is dispensed from this room into the water
treatment system.
Utilities Department Report
To: Public Safety, Utilities & Public Works Committee
Town Administrator Lancaster
From: Reuben Bergsten, Utilities Director
Date: August 13, 2015
RE: Utilities Department Staffing
Objective:
To inform the PUP Committee of our 2016 budget proposal to include three new staff for
Light and Power field operations and two new staff for Water field operations and one
addition in 2017; all of which were included in the 2015-2018 Financial Plan.
Present Situation:
Over the past few years the Utilities Department has benefited from streamlining our
work processes with automation tools. Customer work orders and maintenance
activities are efficiently organized alongside more complicated projects and capital
projects. However, we have a growing backlog of work.
Years of keeping staff levels lean while becoming more productive have brought us to a
tipping point. Our current staffing level could be likened to the Town operating without
cash reserves. Disruption in staff members’ personal lives can reduce their ability to
work overtime or even require them to be away from work for extended periods of time.
Their absence leads to work flow interruption and, in some cases, stops progress of
large projects. This year has proven to be particularly tough.
Proposal:
Our focus for L&P and Water is improving our quality and reliability by replacing or
improving our infrastructure. For Light and Power an equipment operator and
groundworker will be proposed along with a Crew Chief who will assist the Light and
Power Superintendent. For Water, distribution system/plant operators are being
proposed with an additional lab technician proposed for 2017. These additional staff
positions will allow us to efficiently execute work and absorb staff members’ planned
and unplanned time off work.
Administrative work grows along with the field workload. The Utilities Department has
successfully outsourced the bulk of our technical workload with consulting engineers
through multi-year “on-call” agreements. Project management is currently supported
with a full time employee funded through a flood recovery grant. We will propose to
retain the project manager after the grant work is finished.