HomeMy WebLinkAboutPACKET Public Works, Utilities and Public Safety 2015-07-09
Thursday, July 9, 2015
Public Safety, Utilities 8:00 a.m.
& Public Works Committee Town Board Room
* Revised 7/6/15
1. PUBLIC COMMENT
2. PUBLIC SAFETY
a) RECOMMENDATIONS TO THE TOWN BOARD
i. None.
b) REPORTS
i. Verbal Updates and Committee Questions.
3. UTILITIES
a) RECOMMENDATIONS TO THE TOWN BOARD
i. None.
b) REPORTS
i. Verbal Updates and Committee Questions.
4. PUBLIC WORKS
a) RECOMMENDATIONS TO THE TOWN BOARD
i. Conference Center Roof Repair Construction Contract. Mgr. Landkamer
b) REPORTS
i. Dry Gulch Road Rehabilitation Construction Contract. Mgr. Ash
ii. Verbal Updates and Committee Questions.
Pothole Spray Patcher Update. Mgr. McEachern
Scott Ponds Public Meeting Report. Mgr. Ash
Fall River Trail Design Public Meetings. Mgr. Ash
Transit Facility Parking Structure Design Revisions. Consultant McFarland
Visitor Center Restroom Expansion Design. Mgr. Landkamer
CDOT Coordination (Barnes Dance Study). Mgr. Ash
Fish Creek Final Plans for Road and Trail Repairs. Mgr. Ash
5. ADJOURN
AGENDA
*
PUBLIC WORKS Memo
To: Public Safety, Utilities & Public Works Committee
Town Administrator Lancaster
From: Jon Landkamer, Public Works Facilities Manager
Greg Muhonen, Director of Public Works
Date: July 2, 2015
RE: Conference Center Roof 2015
Objective:
Re-roof the Conference Center to repair the current condition of the failing roof
membrane.
Present Situation:
The Conference Center roof has been leaking in multiple places and causing damage to
the interior of the building. This damage has resulted in numerous stained and replaced
ceiling tiles and also damage to the drywall in two significant locations. This is the
original roof, which had a fifteen year warranty, and has been in place for twenty-four
years.
Proposal:
Public Works advertised this project in the local paper, as well as in the Loveland and
Fort Collins papers. We received interest from several front-range contractors, and had
four contractors and one consultant attend the mandatory pre-bid site walks. We also
approved the use of three different manufacturers of PVC Roofing Membranes. Public
Works has received one proposal to re-roof the Conference Center with similar, or
better, quality roofing materials.
1. RTN Roofing Systems, out of Loveland, was the only contractor to submit a
qualifying bid on the project, with a bid proposal of $118,700.
Action Recommended by Staff:
Public Works is recommending that RTN Roofing Systems be awarded the project,
using a Duro-Last PVC roofing membrane.
Budget:
The preliminary project budget for this project was set at $165,000. The Bid Proposal
from RTN Roofing was for $118,700. There are two areas of the roof that fall outside of
the scope of the membrane system, and will require a coating system to insure the life
of these areas. RTN Roofing can also address these issues during the project, but we
would need to add approximately $10,000 for these areas. Public Works is
recommending a total project budget of $129,000.
Level of Public Interest
This repair will have a direct impact on the interior operation of this facility. Many groups
using this facility had disruption in their use during the rainy May we just encountered.
The Conference Director for Rocky Mountain Park Inn has been avoiding using the
areas impacted as much as possible, which is not an ideal operating system for them.
Sample Motion
I move to recommend/not recommend to the Town Board authorizing a $129,000
budget for the Public Works Department to proceed with repairing the Conference
Center Roof and Award of Contract to RTN Roofing Systems, to be included on the
Consent Agenda at the July 14th, 2015 Town Board meeting.
Attachments:
Attached with this memo are project pictures submitted for informational purposes only.
Existing conditions around the roof drains.
The dark spots are leaks, the other picture shows standing water along a parapet wall.
Other assorted repairs, not done to manufacturers specifications.
Crumbling capstone on the parapet wall in multiple places.
Stained and mismatched ceiling tiles, and staining of the drywall and sound fabric.
Bowing and stained ceiling tiles, can lights damaged and not being used, drywall damage