HomeMy WebLinkAboutPACKET Public Works, Utilities and Public Safety 2013-03-14Preparation date: March 1, 2013
NOTE: The Public Safety, Utilities and Public Works Committee reserves the right to consider other
appropriate items not available at the time the agenda was prepared.
AGENDA
TOWN OF ESTES PARK
PUBLIC SAFETY, UTILITIES & PUBLIC WORKS COMMITTEE
March 14, 2013
8:00 a.m.
Board Room, Town Hall
1. PUBLIC COMMENT
2. PUBLIC SAFETY
a) RECOMMENDATIONS TO THE TOWN BOARD
i) None.
b) REPORTS
i) Municipal Court Annual Report. Judge Brown.
ii) Verbal Updates and Committee Questions.
3. UTILITIES
a) RECOMMENDATIONS TO THE TOWN BOARD
i) None.
b) REPORTS
i) 2013 L&P Capital Projects. Director Bergsten & Interim Superintendent
Lockhart.
ii) Verbal Updates and Committee Questions.
4. PUBLIC WORKS
a) RECOMMENDATIONS TO THE TOWN BOARD
i) None.
b) REPORTS
i) Bond Park Construction Update.
ii) Verbal Updates and Committee Questions.
5. ADJOURN
Utilities Department Report
To: Public Safety, Utilities & Public Works Committee
Town Administrator Lancaster
From: Utilities Director Bergsten
Light & Power Interim Superintendent Lockhart
Date: 03/14/2013
RE: 2013 L&P Capital Projects
Background:
Supporting the Town’s mission to provide reliable services, two capital projects were
budgeted for 2013. During our 2012 planning, these two areas were identified as being
the highest outage and maintenance concerns based on outage calls.
Current Status
Most materials have been received. We are waiting for tree cable and
underground conductor (ETA June 1st).
Letters have been sent to residents on the Fall River/Big Thompson project.
Why Do This?
Support the Town’s mission to improve electric service reliability.
Reduce personnel overtime hours on outages.
Budget:
Allenspark: Capital-/Overhead Lines account # 503-7001-580.35-57
2013 $ 501,590
15% contingency $ 75,239
2013 total $ 576,829
Fall River/Big Thompson: Capital/Underground Lines account # 503-7001-580.35-58
2013 $ 413,720
15% contingency $ 62,058
2013 total $ 475,778
Total 2013 cost $1,052,607
Total 2013 budgeted $1,186,000
PROJECT CHARTER
LIGHT & POWER CAPITAL PROJECTS
TOWN OF ESTES PARK
170 MacGregor Avenue
P.O. Box 1200
Estes Park, CO 80517
MARCH 6, 2013
2013 Light & Power Capital Projects
Page 1
TABLE OF CONTENTS
EXECUTIVE SUMMARY ........................................................................................................ 2
PROJECT PURPOSE/JUSTIFICATION ..................................................................................... 2
Business Need/Case/Business Objectives ............................................................................................... 2
Current Status for the Fall River Project .................................................................................................... 2
Current Status for the Allenspark Project .................................................................................................. 2
Why Do This? ............................................................................................................................................ 3
Budget: ...................................................................................................................................................... 3
PROJECT DESCRIPTION ...................................................................................................... 3
Project Objectives and Success Criteria ................................................................................................... 3
Requirements ............................................................................................................................................ 4
Constraints ................................................................................................................................................ 4
Assumptions .............................................................................................................................................. 4
RISKS ............................................................................................................................... 4
PROJECT DELIVERABLES .................................................................................................... 5
SUMMARY MILESTONE SCHEDULES ..................................................................................... 5
SUMMARY BUDGET ............................................................................................................ 6
PROJECT APPROVAL REQUIREMENTS .................................................................................. 6
PROJECT MANAGER ........................................................................................................... 7
STEERING TEAM ................................................................................................................ 7
AUTHORIZATION................................................................................................................. 7
2013 Light & Power Capital Projects
Page 2
EXECUTIVE SUMMARY
The 2013 Light & Power Department capital projects focus on two areas with the
highest number of problems. First, a stretch of the Fall River circuit main line located
close to the substation has had six faults in the past two years. Our second project is on
the Allenspark circuit in the area hardest hit during the 2011 wind storm. The purpose
of these two projects is to increase reliability of electric service and reduce staff hours
on outage calls.
PROJECT PURPOSE/JUSTIFICATION
Business Need/Case/Business Objectives
The purpose of these capital projects is to improve the reliability of electric service by
replacing existing sections of the distribution system. A business case for capital
projects includes a positive impact to our bond credit rating. Rating agencies use our
capital expenditures as an indicator of our ability to maintain the system.
We prioritize projects to help justify which projects are brought forward for funding.
Prioritization includes three main categories: trouble areas based on the number of
outages and the number of customers impacted by the outage, distribution flexibility
allowing power supply from alternate substations and circuits, and quality concerns
based on customer complaints.
The Fall River/Big Thompson line has had the most trouble/outages in t he past couple
years. The root causes are trees in the lines, wildlife and aging equipment. All these
items can be avoided by undergrounding the line. The closer a trouble area is to the
substation, the larger the number of customers experiencing outages. This section of
line is closest to the substation without any protection. Many residential and commercial
customers were impacted by these outages.
For the Allenspark project we picked a large tap off of the Allenspark circuit. This tap is
located mostly off of Big Owl Road. In the November of 2011 wind storm, this area was
the hardest hit on our system. Light & Power had a crew of six working around the
clock for four days to restore power. This line has taken a beating from trees that fell
through the power line or stretched the line. There are several splices, cracked cross
arms and very old poles. The result is increased outages due to a line with reduced
strength and a higher resistance.
Current Status for the Fall River Project
This project was budgeted for 2013 for a total of $498,000.
Project material list has been bid out and we are receiving materials.
Current Status for the Allenspark Project
This project was budgeted for 2013 with a total of $688,000.
Project material list has been bid out and we are receiving materials.
2013 Light & Power Capital Projects
Page 3
Why Do This?
Customers have an increasing expectation for reliable electric service. This
project will help improve reliability.
Reduce outages that affect a large portion of our customers.
On the Allenspark line most of the power poles are from the 40’s, exceeding the
typical useful life of 60 years.
The #6 solid copper wire has been splice several times over the years.
Reduce maintenance/outage costs – the personnel hours spent are higher than
typical due to the difficulty in accessing power lines in back yards and away from
roads.
Installing tree cable on the Allenspark line reduces problems from wildlife, wind,
fire and snow.
Undergrounding the Fall River/Big Thompson lines improves public safety in the
back lots for 2,500 feet of private property and increases reliability of electric
service for a large number of customers.
These locations are in high wind areas. There are lots of trees that have either
brushed the line causing quality problems, fallen on line which weakens
construction of the line and/or have fallen and broken the line.
Budget:
Capital/Infrastructure account # 502-7001-580.35-58 and # 502-7001-580.35-57
Fall River/BT Project $ 498,000
2013 Allenspark Project $ 688,000
2013 total $1,186,000
PROJECT DESCRIPTION
The Fall River project will have a crew of four that will be trenching and installing spare
conduits for the cable company, phone company and fiber optic. This project will
underground approximately 3,000 feet of overhead lines. Six house services must be
undergrounded.
The Allenspark project will also have a crew of four that will be replacing over 50 poles
and upgrading 12,000 feet of 6 solid copper to #2 tree cable.
Project Objectives and Success Criteria
The objective is to replace the old construction with a more reliable design.
The primary criteria for success of every project is personnel safety. Our goal is no lost
time due to accidents.
2013 Light & Power Capital Projects
Page 4
Additional success criteria are:
Limited customer outages during relocation of transformers from the old poles to
the new poles (approximately 20 transformers)
One outage in the Overlook neighborhood on the Fall River circuit
Completion of work on schedule
Requirements
These projects must meet the following high-level requirements in order to achieve
success:
- Stay within the approved budget
- Keep our customers informed of scheduled outages
- Carefully handle extraordinary situations and customer encounters
- Keep management informed of the progress
Additional requirements may be added as necessary, with project sponsor approval, as
the project moves forward.
Constraints
The following constraints pertain to the projects:
- New staff cannot be hired to complete the projects
- Following APPA safety regulations
Assumptions
Upon agreement and signature of this document, all parties acknowledge that the
following assumptions are true and correct:
- These projects have the full support of the project sponsor, stakeholders, Town
Trustees, and all affected departments
- Our customers abutting these projects will not oppose it or express their
concerns early in the project when they receive their letter.
RISKS
The following risks for the projects have been identified. The project managers will
determine and employ the necessary risk mitigation/avoidance strategies as appropriate
to minimize the likelihood of these risks:
- Property owners refusing access
- Lack of Town resources (primarily staff time/resignations) to participate
- Lack of complete Town leadership support
- Unknown, but required, expenditures necessary to successfully complete the
project
- Large snow storms, wind events or fires
- Equipment failure
- Materials not delivered on time
- Accidents
2013 Light & Power Capital Projects
Page 5
PROJECT DELIVERABLES
The following deliverables must be met upon the successful completion of the project s.
Any changes to these deliverables must be approved by the project sponsor :
- Completed project plan (see attached)
- New construction placed into operation
- Clean job site
SUMMARY MILESTONE SCHEDULES
The Summary Milestone Schedule for these projects are presented below. As
requirements are more clearly defined, this schedule may be modified. Any changes will
be communicated through project status meetings by the project manager.
Summary Milestone Schedule – List key project milestones relative to
project start.
Fall River Project Milestones Target Date
(mm/dd/yyyy)
Project start 1/25/2013
Delivery of all material for project 6/1/2013
Start of construction 4/5/2013
The start removing the overhead power lines 9/6/2013
Completion of construction 9/19/2013
Final walk-through 9/29/2013
Project complete 10/13/2013
2013 Light & Power Capital Projects
Page 6
Summary Milestone Schedule – List key project milestones relative to
project start.
Allenspark Project Milestones Target Date
(mm/dd/yyyy)
Project start 2/1/2013
Start of construction 3/14/2013
Delivery of all material for project 4/14/2013
Completion of construction 9/20/2013
Final walk-through 9/22/2013
Project complete 9/29/2013
SUMMARY BUDGET
The following table contains a summary budget based on the planned cost components
and estimated costs required for successful completion of the project:
Summary Budget – Component Project Costs
Project Component Component
Cost
Fall River Project $ 413,720
Allenspark Project $ 501,590
15% Contingency $ 137,297
Total $1,052,607
PROJECT APPROVAL REQUIREMENTS
Success for the project will be achieved when the Fall River line is underground and the
Big Owl tap is #2 tree cable. Success will be determined by the project sponsor, who
will also authorize completion of the project.
2013 Light & Power Capital Projects
Page 7
PROJECT M ANAGER
Joe Lockhart, Denny Thorson and Kevin Kelly will be project co-managers. Their
responsibilities are to manage all project tasks, scheduling and communication
regarding these projects. The project co-managers will coordinate all resource
requirements through the various Town department leaders. Any additional funding
must be requested through the project sponsor. The project co-managers will provide
routine updates to the project sponsor and Steering Team.
STEERING TEAM
The project co-managers will take guidance from the Steering Team. The initial
members of the team will be:
Utilities Director (Bergsten)
Light & Power Interim Line Superintendent (Lockhart)
On a quarterly basis, there will be meetings to review progress. On a monthly basis, the
project co-managers will send out a monthly status report.
AUTHORIZATION
Approved by the Project Sponsor:
_____________________________________ Date: _________________
Reuben Bergsten
Utilities Director
AP2013STATE HI
GHWAY 7COUNTY ROAD 82E
P
I
E
R
S
O
N
P
A
R
K
R
D
P R I V A T E D R
This draft document was prepared for internal use by theTown of Estes Park, CO. The town makes no claim as tothe accuracy or completeness of the data contained hereon.
Due to security concerns, the town requests that youdo not post this document on the internet or otherwisemake it available to persons unknown to you.
0 640 1,280Feet
1 in = 1,186 ft±Town of Estes ParkDepartment of Light and Power 3/6/2013Updated:
Electric Distribution System
Created By: Joe Lockhart
!Ì!Ì!Ì!Ì!Ì!Ì
")V
")V
")V")V
")V
")V")V
")V")V
")V")V
")V
")V
")V
")V
#.
#.
#.
#.
#.
#.
#.#.#.#.
#.
#.
#.#.
#.#.
#.
#.
#.
#.
#.
#.
#.
#.#.
#.
#.
#.
#.
#.
#.#.
#.
#.
#.#.
#.#.
#.
#.
#.
#.
#.
#.
#.
#.ÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwÍwX88
X88
X88
X88
âF
âFâFâFâFâFâFâFâFâF âFâF
âFâF
âF
âF âFâFâFâFâFâFâF
âFâFâFâFâF
âFâFâF
âFâF
âFâFâFâFâFâFâF
âFâFâF
âF
âF
âFâFâFâFâF!(D
!(D
!(D
!(D
!(D
!(
!(D!(D
!(
!(D
!(D
!(D
!(D
!(D
!(D!(D !(D!(D
!(D
!(D !(D!(D
!(D
!(
!(D
!(
!%NNN!%NNN!%NNN!%NNN !%NNN!%NNN_R
XY&
!¹
!¹
!¹
!¹
!¹
!¹
!¹
!¹
!¹
8XC
Fall RiverCircuit
Big ThompsonCircuit
333
451
800
791
751
801
920
770
730
941
820
831
720
871
850
610
851
500
600
741
621
750
833
790
846
829
838
827
823
680
559
837
830
780 950
650
1100
842
647
601
571
400
570
835
540
370
475
490460
813
415
1040
351
450
375
390
350
1001
1000
340
428
1120
420
410
1041
561
424
1060
1061
440
1020
655
1064
870
1051
1021
470
745
681 651
670
660
1111
691
661
640
1010
635
611
685
625
620
690
665
636
695
453
675
645
533
836
445
447 455 457
466
456
844
458454
810
631
641
462464452
401
1150
252254
265
250
406
314 320
326
334330 418
402
324
404
322
414
336
255
412
316 416
332
253
328
267
261259
318
271
363
258256
262
260
264
930
343347305303345325315313327323
840
349
341307
301
LAKE ESTES
3 DISCONNECTS
5A5A
25A
10A
41950A
94310A
89510A
27075A
324525A
324625A
336215A
199550A
325250A
323115A
001175A
177350A
298325A
336115A
4098112.5A
25B
10B
15B
15B
377775B
189475B
198850B
197050B
294125B
318225B
303425B
288850B
165515B
50C
379875C
298425C
201050C
304550C
ABC
1325150ABC
1984225ABC
2526500ABC
2629300ABC
2623225ABC
3216150ABC0010500ABC
3539150ABC
2628300ABC
3278300ABC
2548500ABC
2618225ABC
4131112.5ABC
10-10-10ABC
8
7
4
3
16 CU B - BIG THOMPSON1/0 CU-ABC - BIG THOMPSON
2 A L -A - F A L L R I V E R
2 AL-A - FALL RIVER750 AL-ABC - FALL RIVER750 AL-ABC - BIG THOMPSON2 AL-ABC - FALL RIVER2 AL-ABC - FALL RIVER2 A L -A B C - F A L L R I V E R
2 AL-ABC - FALL RIVER 750 AL-ABC - BIG THOMPSONBIG THOMPSON AVESOUTH LN
STEAMER DRO TIS LN
P I N E L N
VIS
T
A L
N
HI
LLSI
DE LNEAST LNSUMMI
T DRWEST LNE W O N D E R V I E W A V E
S W S T E A M E R P K W Y PANORAMA CIRP R O S P E C T O R L N
BLACK CANYO
N D
R
FREELAND CT335425A336825A
255825A
373775A
This draft document was prepared for internal use by theTown of Estes Park, CO. The town makes no claim as tothe accuracy or completeness of the data contained hereon.
Due to security concerns, the town requests that youdo not post this document on the internet or otherwisemake it available to persons unknown to you.
0 180 360Feet
1 in = 320 ft±Town of Estes ParkDepartment of Light and Power 3/6/2013Updated:
Electric Distribution System
Created By: Joe Lockhart
ID
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
$501,590
Alenspark/Big Owl Project ($688k Budgeted)
$9,600
Planning, crew walking out the job, Draft Material List
$2,400
Send out bids for Material
$104,800
Purchase/Receive/ Organize Material
$44,700
Wright Tree Service (Trim out phases 1-12, reduces O&M charges)
$20,330
Phase 1
$20,330
Phase 2
$20,330
Phase 3
$20,330
Phase 4
$20,330
Phase 5
$20,330
Phase 6
$20,330
Phase 7
$20,330
Phase 8
$20,330
Phase 9
$20,330
Phase 10
$20,330
Phase 11
$20,330
Phase 12
$20,330
Clean up
$25,800
Project Management/Call in locates per phase.
$20,000
Line Truck
$30,000
Blasting (as needed, estimate)
9/22
Final Walk Through
Review Project, LESSONS LEARNED
9/29
Project Completion
$413,720
Fall River/Big Thompson Double Circuit ($498k budgeted)
$1,200
lanning, crew walking out the job, Draft Material List
$9,000
Have King Surveyors work on easements
$300
Send ot notice to all home owners
$2,400
Send out bids for Material
$140,000
Purchase/Receive/ Organize Material
$20,000
Mini Excavator and Skid Steer Rental
$320
Call Locates
$30,000
Blasting / Travis Kitchen
$10,800
Phase 1
$10,800
Phase 2
$10,800
Phase 3
$10,800
Phase 4
$10,800
Phase 5
$10,800
Phase 6
$10,800
Phase 7
$15,000
Boring one road crossing
$10,800
Phase 8
$21,600
Phase 9
$32,000
Phase 10
$12,500
Phase 11
$43,000
Remove Overhead and clean up
9/29
Final Walk Through
Review Project, LESSONS LEARNED
10/13
Project Completion
1/7
16 23 30 6 13 20 27 3 10 17 24 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 7 14 21 28 4 11 18 25 1 8 15 22 29 6 13 20 27 3
Jan '13 Feb '13 Mar '13 Apr '13 May '13 Jun '13 Jul '13 Aug '13 Sep '13 Oct '13 Nov '
Task
Split
Progress
Milestone
Summary
Project Summary
External Tasks
External Milestone
Deadline
Page 1
Project: Captial Project 2013 rev c
Date: Thu 3/7/13
ENGINEERING Report
To: Public Safety, Utilities and Public Works Committee
Town Administrator Lancaster
From: Kevin Ash, PE, Public Works Civil Engineer
Date: March 14, 2013
RE: Bond Park Phase V Improvements Construction Update
Update:
Construction in Bond Park has been minimal due to a scheduled 3-month winter break.
Cold temperatures and frost halted most of the construction effort in early December.
Throughout the winter months of December,
January and February the contractor was
permitted to work on the pavilion and utility
improvements as weather conditions allowed.
The structural concrete columns were poured and
masonry work on the seatwall caps and column
fascia was completed.
Public Works had 3 progress meetings with the
design team and contractor over the winter break
to confirm schedules and verify that shop
submittals were moving forward. Overall the
project is approximately 75% complete and on
schedule to finish prior to the Memorial weekend
craft festival.
As temperatures climb into the spring months, construction activities in Bond Park will
resume at an increased level. Taylor Kohr’s project schedule shows construction
activities restart in full on March 13th. The public should expect to see the following:
• Concrete flatwork and pavers go in along Elkhorn Avenue for the sidewalk.
• Electrical conduit for the lighting should be installed and connected.
• The irrigation system should be installed and functional.
• The steel roof and wood decking of the pavilion will be constructed on-site.
• All disturbed turf areas will be re-sodded.
• The installation of landscaping beds, benches and signage.
All fencing and construction signage will remain in place until acceptance of the project
by the Town. Construction Administration services will continue to be provided by the
Farnsworth Group until acceptance by the Town.