Loading...
HomeMy WebLinkAboutPACKET Estes Valley Board of Adjustment 2015-09-01VICINITY MAP SCALE: 1" = 500'SHEET INDEXGENERAL NOTES:STATISTICAL DATA:STALLSSECOND LEVELLEVELSGROUND LEVEL75775350 S. Roslyn StreetSuite 220Greenwood Village,CO 80111303.694.6622 Ph303.694.6667 FaxSTANDARDACCESSIBLECARACCESSIBLEVANTOTAL8377Michael Koch, Architect PCm@kocharchitect.com728 Lafayette StreetDenver, CO, 80218303-780-78501COVER SHEET2SURVEY PLAN3PROPOSED SITE PLAN4FIRE ACCESS PLAN5GROUND LEVEL PLAN6TOP LEVEL PLAN7SECOND AND THIRD LEVEL PLANS - FUTURE8TOP LEVEL PLAN - FUTURE9GRADING PLAN10UTILITY PLAN11LIGHT SPILL PHOTOMETRIC PLAN12PARKING STRUCTURE PHOTOMETRIC PLANS13LANDSCAPE PLAN14PLANTING DETAILS15ARCHITECTURAL ELEVATIONS16ARCHITECTURAL ELEVATIONS17ARCHITECTURAL ELEVATIONS - FUTURE18ARCHITECTURAL ELEVATIONS - FUTURE19PHOTO SIMULATION - EAST VIEW20PHOTO SIMULATION - FUTURE EAST VIEW21PHOTO SIMULATION - WEST VIEW22PHOTO SIMULATION - FUTURE WEST VIEW23PHOTO SIMULATION - NORTH VIEW24PHOTO SIMULATION - FUTURE NORTH VIEW25PHOTO SIMULATION - STAIR ENTRY VIEW26PHOTO SIMULATION - FUTURE STAIR ENTRY VIEWContact: Bob StanleySTRUCTURAL ENGINEERPRIME CONSULTANT ANDARCHITECTCIVIL ENGINEERCERTIFICATION AND APPROVAL:APPROVED AND ACCEPTED BY THE ESTES VALLEY PLANNING COMMISSION ON THIS __________ DAY OF_______________________ , 20____ .PLANNING COMMISSION CHAIRATTESTPLANNING COMMISSION CERTIFICATE:1.ALL REQUIRED IMPROVEMENTS SHALL BE COMPLETED OR GUARANTEED PRIOR TO THEISSUANCE OF A CERTIFICATE OF OCCUPANCY.2.THE OWNER SHALL BE REQUIRED TO PROVIDE FOR HANDICAP ACCESSIBILITY IN ACCORDANCEWITH THE A.D.A. AND I.B.C.3.APPROVAL OF THIS PLAN CREATES A VESTED PROPERTY RIGHT PURSUANT TO ARTICLE 68 OFTITLE 24, C.R.S., AS AMENDED.ZONING:CD-COMMERCIAL DOWNTOWNGROSS PROJECT AREA (INCLUDES PORTIONS OF MULTIPLE LOTS):2.569 AC/111,904 S.F.80% OF LAND UNDER EFFECTIVE FLOOD PLAIN:0.203 AC/8,829 S.F.AREA IN PROPOSED RIGHTS-OF-WAY DEDICATIONS:0 AC/0 S.F.80% OF LAND ABOVE TOEP WATER SERVICE ELEVATION:0 AC/0 S.F.LEASE AREA:0 AC/0 S.F.NET PROJECT AREA:2.367 AC/103,075 S.F.NET SITE IMPROVEMENT PROJECT AREA:2.202 AC/95,934 S.F.GROSS FLOOR AREA:PROPOSED PARKING STRUCTURE (2 LEVELS):59,987 S.F.FUTURE PARKING STRUCTURE (4 LEVELS):126,655 S.F.FLOOR AREA RATIO:PROPOSED PARKING STRUCTURE (2 LEVELS):0.54FUTURE PARKING STRUCTURE (4 LEVELS):1.13LOT COVERAGE:EXISTING LOTS, ROADWAYS, OTHER:37,995 S.F.PROPOSED PARKING STRUCTURE:33,367 S.F.TOTAL (SITE):71,362 S.F.LOT COVERAGE RATIO:64%STRUCTURE HEIGHT RESTRICTIONS:30 FEETSTRUCTURE HEIGHT:PROPOSED PARKING STRUCTURE (2 LEVELS):PARKING STRUCTURE (TOP OF SPANDREL): 17'-2"STAIR CANOPY: N/ALIGHT POLE: 38'-6"FUTURE PARKING STRUCTURE (4 LEVELS):PARKING STRUCTURE (TOP OF SPANDREL): 39'-2"STAIR CANOPY: 44'-9"LIGHT POLE: 60'-6"MEP ENGINEER3025 S. Parker Road, Suite 1100Aurora, CO 80014-2950303.696.2602 fax 303.696.0812www.ssgroupinc.comSSG MEP, Inc.MEPSSGACCESSIBLEVAN2060TOTAL (PROPOSED STRUCTURE)15216026THIRD LEVELFUTURE LEVELSSECOND LEVEL24101241010000TOP LEVEL777700TOTAL (FUTURE STRUCTURE)2022020049SURFACE LOT STALLSGRAND TOTAL AT BUILD OUT403PARKING/ADA REQUIREMENT ANALYSIS:1.THE ADA PARKING REQUIREMENTS ARE DERIVED FROM THE 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN,SECTION 208.2. THE SITE SURFACE PARKING IS CONSIDERED A PARKING FACILITY AND THE PARKINGSTRUCTURE IS CONSIDERED A PARKING FACILITY, EACH WITH THEIR OWN PARKING REQUIREMENTS.2.THE SURFACE PARKING WITH (54) TOTAL STALLS REQUIRES (2) CAR ADA STALLS AND (1) VAN ADA STALL. THEPARKING STRUCTURE, AT BUILD OUT, WILL HAVE A TOTAL OF (356) STALLS; REQUIRING (6) CAR ADA STALLSAND (2) VAN ADASTALLS.524141328Town of Estes ParkAttention: Gregory P. Muhonen, P.E.Public Works Director170 MacGregor AvenueP.O. Box 1200Estes Park, CO 80517970-577-3581OWNER/APPLICANTGinny Gerhart McFarland, AIA, LEED, AP, NCARBSpaceintoPlace | ADP.O. Box 1645Estes Park, CO 80517303-731-3750CONTACT PERSONTHE UNDERSIGNED, BEING THE OWNERS, DO HEREBY AGREE THAT THE REAL PROPERTY AS DESCRIBEDIN THE APPLICATION FOR DEVELOPMENT PLAN REVIEW FILED HEREWITH, AND AS SHOWN ON THIS SITEPLAN SHALL BE SUBJECT TO THE PROVISIONS OF TITLE 17 OF THE MUNICIPAL CODE OF THE TOWN OFESTES PARK, COLORADO AND ANY OTHER ORDINANCES OF THE TOWN OF ESTES PARK, COLORADOPERTAINING THERETO.TOWN OF ESTES PARKWILLIAM PINKHAM, MAYORPARKING SPACES PROVIDED:8377(COVERED)ENCLOSED(UNCOVERED)UNENCLOSED0016002478010202377100052262152ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOCOVER SHEET - SHEET 1 40'020'SCALE: 1" = 20'-0"ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOSURVEY PLAN - SHEET 2 ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOPROPOSED SITE PLAN - SHEET 360'030'SCALE: 1" = 30'-0" ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOFIRE ACCESS PLAN - SHEET 460'030'SCALE: 1" = 30'-0" ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOGROUND LEVEL PLAN - SHEET 540'020'SCALE: 1" = 20'-0" ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOTOP LEVEL PLAN - SHEET 640'020'SCALE: 1" = 20'-0" ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOSECOND AND THIRD LEVEL PLANS - FUTURE - SHEET 740'020'SCALE: 1" = 20'-0" ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOTOP LEVEL PLAN - FUTURE - SHEET 840'020'SCALE: 1" = 20'-0" 40'020'SCALE: 1" = 20'-0"ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOGRADING PLAN - SHEET 9 ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOUTILITY PLAN - SHEET 1060'030'SCALE: 1" = 30'-0" ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOLIGHT SPILL PHOTOMETRIC PLAN - SHEET 1140'020'SCALE: 1" = 20'-0" ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOPARKING STRUCTURE PHOTOMETRIC PLANS - SHEET 1240'020'SCALE: 1" = 20'-0" ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOLANDSCAPE PLAN - SHEET 1360'030'SCALE: 1" = 30'-0" ESTES PARK TRANSIT FACILITY PARKING STRUCTURELOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITIONESTES PARK TRANSIT FACILITY PARKING STRUCTUREISSUE DATE: 08-11-2015AND LOT 3, STANLEY MEADOWS ADDITION,TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADOPLANTING DETAILS - SHEET 14TREE AND SHRUB INSTALLATION SECOND LEVEL 12' - 0" 1 2 3 4 5 6 7 8 THIRD LEVEL 23' - 0" TOP LEVEL 34' - 0" GROUND WEST 1' - 6" SECOND WEST 13' - 6" 1 2 6 5 1 14 9814 9 8 5 1 2 3 11 3 1513' - 0"15' - 8"19' - 10"10 7' - 2" 32' - 0" 13' - 8"25' - 0"16 17 GROUND LEVEL 0" SECOND LEVEL 12' - 0" ABC THIRD LEVEL 23' - 0" TOP LEVEL 34' - 0" 5 14 15 11 5 19 7 6 5 12 1 9 2 10 5' - 6"14 1818 21' - 4"15' - 8"8 20 ELEVATION LEGEND: 1.ACID ETCHED PRECAST CONCRETE SPANDREL OR WALL 2.ACID ETCHED PRECAST CONCRETE SPANDREL WITH TEXTURED SURFACE 21.3'0 10.6' SCALE: 3/32" = 1'-0" Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION ESTES PARK TRANSIT FACILITY PARKING STRUCTURE ISSUE DATE: 06-24-2015 AND LOT 3, STANLEY MEADOWS EDITION, TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO SHEET 15ARCHITECTURAL ELEVATIONS - 3/32" = 1'-0"1 NORTH ELEVATION PHASE 1 3/32" = 1'-0"2 EAST ELEVATION PHASE 1 3.PRECAST GRAY CONCRETE COLUMN 4.STAINED PRECAST COPING OR INSET PANEL 5.STONE VENEER ON CMU OR PRECAST WALL 6.HEAVY TIMBER 7.LOG COLUMN 8.CORRUGATED, RUSTED FINISH STEEL ROOF 9.PAINTED METAL STAIRS AND GUARDRAIL 10.SIGNAGE 11.LIGHT POLE (AT TOP LEVEL) 12.STREET LIGHT POLE 13.HANGING METAL PLANTER BOX 14.SITE PLANTER WALL WITH VENEER STONE, PRECAST CAP AND CONTAINER PLANTS 15.WALL MOUNTED LIGHT FIXTURE 16.1" VERTICAL REVEAL 17.2" HORIZONTAL REVEAL 18.LANDSCAPED TERRACE 19.ACID ETCHED PRECAST CONCRETE SHEAR WALL 20.HEAVY TIMBER FASCIA PROSPECT ADDITION, 12345678 SECOND WEST 13' - 6" 11 1 14 1 1 5 519' - 10"19' - 0"1411 11 12 A B C GROUND WEST 1' - 6" SECOND WEST 13' - 6" THIRD WEST 24' - 6" TOP WEST 35' - 6" 11 5 8 14 619 14 12 19' - 10"15' - 8"15' - 8"24' - 0"35' - 10"26' - 0"2' - 4"4' - 0"14' - 5"4' - 0"17' - 9"11' - 3" ELEVATION LEGEND: 1.ACID ETCHED PRECAST CONCRETE SPANDREL OR WALL 2.ACID ETCHED PRECAST CONCRETE SPANDREL WITH TEXTURED SURFACE 21.3'0 10.6' SCALE: 3/32" = 1'-0" Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION ESTES PARK TRANSIT FACILITY PARKING STRUCTURE ISSUE DATE: 06-24-2015 AND LOT 3, STANLEY MEADOWS EDITION, TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO SHEET 16ARCHITECTURAL ELEVATIONS - 3/32" = 1'-0"1 SOUTH ELEVATION 3/32" = 1'-0"2 WEST ELEVATION 3.PRECAST GRAY CONCRETE COLUMN 4.STAINED PRECAST COPING OR INSET PANEL 5.STONE VENEER ON CMU OR PRECAST WALL 6.HEAVY TIMBER 7.LOG COLUMN 8.CORRUGATED, RUSTED FINISH STEEL ROOF 9.PAINTED METAL STAIRS AND GUARDRAIL 10.SIGNAGE 11.LIGHT POLE (AT TOP LEVEL) 12.STREET LIGHT POLE 13.HANGING METAL PLANTER BOX 14.SITE PLANTER WALL WITH VENEER STONE, PRECAST CAP AND CONTAINER PLANTS 15.WALL MOUNTED LIGHT FIXTURE 16.1" VERTICAL REVEAL 17.2" HORIZONTAL REVEAL 18.LANDSCAPED TERRACE 19.ACID ETCHED PRECAST CONCRETE SHEAR WALL 20.HEAVY TIMBER FASCIA PROSPECT ADDITION, SECOND LEVEL 12' - 0" 1 2 3 4 5 6 7 8 THIRD LEVEL 23' - 0" TOP LEVEL 34' - 0" GROUND WEST 1' - 6" THIRD WEST 24' - 6" TOP WEST 35' - 6" 1 2 3 4 13 6 5 19 14 9 814 8 7 9 8 5 1 2 3 4 11 344' - 9"19' - 10"15 18' - 2" GROUND LEVEL 0" SECOND LEVEL 12' - 0" ABC THIRD LEVEL 23' - 0" TOP LEVEL 34' - 0" 6 7 9 13 5 14 15 1 2 4 4 11 5 19 7 6 5 12 14 18 8 37' - 8"21' - 4"ELEVATION LEGEND: 1.ACID ETCHED PRECAST CONCRETE SPANDREL OR WALL 2.ACID ETCHED PRECAST CONCRETE SPANDREL WITH TEXTURED SURFACE 21.3'0 10.6' SCALE: 3/32" = 1'-0" Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION ESTES PARK TRANSIT FACILITY PARKING STRUCTURE ISSUE DATE: 06-24-2015 AND LOT 3, STANLEY MEADOWS EDITION, TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO SHEET 17ARCHITECTURAL ELEVATIONS - FUTURE - 3/32" = 1'-0"1 NORTH ELEVATION FUTURE 3/32" = 1'-0"2 EAST ELEVATION FUTURE 3.PRECAST GRAY CONCRETE COLUMN 4.STAINED PRECAST COPING OR INSET PANEL 5.STONE VENEER ON CMU OR PRECAST WALL 6.HEAVY TIMBER 7.LOG COLUMN 8.CORRUGATED, RUSTED FINISH STEEL ROOF 9.PAINTED METAL STAIRS AND GUARDRAIL 10.SIGNAGE 11.LIGHT POLE (AT TOP LEVEL) 12.STREET LIGHT POLE 13.HANGING METAL PLANTER BOX 14.SITE PLANTER WALL WITH VENEER STONE, PRECAST CAP AND CONTAINER PLANTS 15.WALL MOUNTED LIGHT FIXTURE 16.1" VERTICAL REVEAL 17.2" HORIZONTAL REVEAL 18.LANDSCAPED TERRACE 19.ACID ETCHED PRECAST CONCRETE SHEAR WALL 20.HEAVY TIMBER FASCIA PROSPECT ADDITION, 12345678 SECOND WEST 13' - 6" THIRD WEST 24' - 6" TOP WEST 35' - 6" 11 4 1 2 13 3 121 1 2 3 4 13 5 5 119' - 10"25' - 8"11 11 A B C GROUND WEST 1' - 6" SECOND WEST 13' - 6" THIRD WEST 24' - 6" TOP WEST 35' - 6" 11 4 1 2 13 3 5 8 14 6 199 14 12 37' - 8"19' - 10"ELEVATION LEGEND: 1.ACID ETCHED PRECAST CONCRETE SPANDREL OR WALL 2.ACID ETCHED PRECAST CONCRETE SPANDREL WITH TEXTURED SURFACE 21.3'0 10.6' SCALE: 3/32" = 1'-0" Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION ESTES PARK TRANSIT FACILITY PARKING STRUCTURE ISSUE DATE: 06-24-2015 AND LOT 3, STANLEY MEADOWS EDITION, TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO SHEET 18ARCHITECTURAL ELEVATIONS - FUTURE - 3/32" = 1'-0"1 SOUTH ELEVATION FUTURE 3/32" = 1'-0"2 WEST ELEVATION FUTURE 3.PRECAST GRAY CONCRETE COLUMN 4.STAINED PRECAST COPING OR INSET PANEL 5.STONE VENEER ON CMU OR PRECAST WALL 6.HEAVY TIMBER 7.LOG COLUMN 8.CORRUGATED, RUSTED FINISH STEEL ROOF 9.PAINTED METAL STAIRS AND GUARDRAIL 10.SIGNAGE 11.LIGHT POLE (AT TOP LEVEL) 12.STREET LIGHT POLE 13.HANGING METAL PLANTER BOX 14.SITE PLANTER WALL WITH VENEER STONE, PRECAST CAP AND CONTAINER PLANTS 15.WALL MOUNTED LIGHT FIXTURE 16.1" VERTICAL REVEAL 17.2" HORIZONTAL REVEAL 18.LANDSCAPED TERRACE 19.ACID ETCHED PRECAST CONCRETE SHEAR WALL 20.HEAVY TIMBER FASCIA PROSPECT ADDITION, 21.3'0 10.6' SCALE: 3/32" = 1'-0" Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION ESTES PARK TRANSIT FACILITY PARKING STRUCTURE ISSUE DATE: 06-24-2015 AND LOT 3, STANLEY MEADOWS EDITION, TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO SHEET 19-PHOTO SIMULATION - EAST VIEW- PROSPECT ADDITION, 21.3'0 10.6' SCALE: 3/32" = 1'-0" Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION ESTES PARK TRANSIT FACILITY PARKING STRUCTURE ISSUE DATE: 06-24-2015 AND LOT 3, STANLEY MEADOWS EDITION, TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO SHEET 20PHOTO SIMULATION - FUTURE EAST VIEW - PROSPECT ADDITION, 21.3'0 10.6' SCALE: 3/32" = 1'-0" Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION ESTES PARK TRANSIT FACILITY PARKING STRUCTURE ISSUE DATE: 06-24-2015 AND LOT 3, STANLEY MEADOWS EDITION, TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO SHEET 21PHOTO SIMULATION - WEST VIEW - PROSPECT ADDITION, 21.3'0 10.6' SCALE: 3/32" = 1'-0" Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION ESTES PARK TRANSIT FACILITY PARKING STRUCTURE ISSUE DATE: 06-24-2015 AND LOT 3, STANLEY MEADOWS EDITION, TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO SHEET 22PHOTO SIMULATION - FUTURE WEST VIEW - PROSPECT ADDITION, 21.3'0 10.6' SCALE: 3/32" = 1'-0" Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION ESTES PARK TRANSIT FACILITY PARKING STRUCTURE ISSUE DATE: 06-24-2015 AND LOT 3, STANLEY MEADOWS EDITION, TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO SHEET 23PHOTO SIMULATION - NORTH VIEW - PROSPECT ADDITION, 21.3'0 10.6' SCALE: 3/32" = 1'-0" Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION ESTES PARK TRANSIT FACILITY PARKING STRUCTURE ISSUE DATE: 06-24-2015 AND LOT 3, STANLEY MEADOWS EDITION, TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO SHEET 24PHOTO SIMULATION - FUTURE NORTH VIEW - PROSPECT ADDITION, 21.3'0 10.6' SCALE: 3/32" = 1'-0" Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION ESTES PARK TRANSIT FACILITY PARKING STRUCTURE ISSUE DATE: 06-24-2015 AND LOT 3, STANLEY MEADOWS EDITION, TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO SHEET 25PHOTO SIMULATION - STAIR ENTRY VIEW - PROSPECT ADDITION, 21.3'0 10.6' SCALE: 3/32" = 1'-0" Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION ESTES PARK TRANSIT FACILITY PARKING STRUCTURE ISSUE DATE: 06-24-2015 AND LOT 3, STANLEY MEADOWS EDITION, TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO SHEET 26PHOTO SIMULATION - FUTURE STAIR ENTRY VIEW - PROSPECT ADDITION,