HomeMy WebLinkAboutMINUTES Estes Valley Board of Adjustment 2014-12-02RECORD OF PROCEEDINGS
Regular Meeting of the Estes Valley Board of Adjustment
December 2, 2014 9:00 a.m.
Board Room, Estes Park Town Hall
Board: Chair John Lynch, Vice-Chair Jeff Moreau, Members Wayne Newsom,
Pete Smith, and Don Darling
Attending: Chair Lynch, Members Moreau, Newsom, Smith, and Darling
Also Attending: Planner Kleisler, Recording Secretary Thompson
Absent: None
Chair Lynch called the meeting to order at 9:00 a.m. There were two people in
attendance. He introduced the Board members and staff.
The following minutes reflect the order of the agenda and not necessarily the chronological
sequence. There were two people in attendance.
1. PUBLIC COMMENT
None.
2. CONSENT
Approval of minutes of the November 4, 2014 meeting.
It was moved and seconded (Smith/Moreau) to approve the Consent Agenda as
presented and the motion passed unanimously.
3. METES & BOUNDS PARCEL LOCATED AT 2515 TUNNEL ROAD (YMCA)
Planner Kleisler reviewed the staff report. The request is for a variance from EVDC
Section 4.4, Table 4-5 which limits building height to thirty (30) feet in all zone districts,
with additional height allowances for sloped land. The applicant desires to construct a
proposed Mountain Center with an indoor climbing wall approximately two feet above the
slope-adjusted height limit. Planner Kleisler stated a development plan was approved by
the Estes Valley Planning Commission October 18, 2014, and includes a 5,400 square
foot building, 6,200 square foot walkout area, and a 55-space parking lot. The proposed
LEED Certified building will be constructed in one phase, with the date of commencement
still to be determined. The proposed building will have an open floor plan to accommodate
a variety of recreation sports for use by on-site guests. Planner Kleisler described how the
slope-adjustment is calculated. The YMCA of the Rockies’ proposal aligns with their 2007
Master Plan. He explained only a small portion of the building will exceed the height limit.
RECORD OF PROCEEDINGS
Estes Valley Board of Adjustment 2
December 2, 2014
The design of the proposed Mountain Center aligns with the character of the surrounding
buildings on the property.
Planner Kleisler stated the application was routed to affected agencies and adjacent
property owners. No written comments were received. One nearby property owner visited
the Community Development Department to inquire about the project. After viewing the
plans, he was not opposed to the variance.
Staff Findings
1. In determining whether special circumstances or conditions exist, staff found the
project site has an average slope of approximately 10%. This slope, combined with the
proposed layout of the building, presents practical difficulty in meeting the height
limitations.
2. In determining “practical difficulty”, staff found:
a. The accommodations use may continue
b. The variance is not substantial
c. The essential character of the neighborhood would not be substantially altered with
the approval of this variance. Given the size of the YMCA property (593 acres), the
building will likely not be seen from surrounding residential properties. The distance
to the nearest residential property is over 1,000 feet and generally screened by
topography and vegetation. There also appears to be little or no impact to
surrounding cabins on the YMCA property.
d. Affected agencies expressed no concerns relating to public services for this
variance.
e. The YMCA of the Rockies was established in 1907, long before land use codes.
The YMCA received approval for their long range master plan in 2007, after the
adoption of the current height standards.
f. The applicant’s predicament can be mitigated only through a height variance.
3. If authorized, a variance shall represent the least deviation from the regulations that
will afford relief. Staff found the applicant has designed the building with height
limitations in mind, sinking the lower floor approximately three feet below existing
grade. According to the application, sinking the building further down would negatively
impact the parking lot. Altering the pitch and design of the roof is possible, but this
would further shorten the climbing wall and may be out of character with other YMCA
buildings.
4. In granting such variances, the Board of Adjustment may require such conditions as
will, in its independent judgment, secure substantially the objectives of the standard so
varied or modified. Should the variance be obtained, staff recommends a Surveyor
Certificate be required to confirm compliance.
Staff recommends approval of the requested variance, with conditions of approval listed
below.
RECORD OF PROCEEDINGS
Estes Valley Board of Adjustment 3
December 2, 2014
Staff and Member Discussion
There was brief discussion about a discrepancy on the site plan.
Public Comment
Steve Lane/applicant representative clarified the walkout area will be 6200 sq feet with the
upper area being 5400 square feet. From the loop of cabins to the SE of the site, the
building will not appear to be above the height limit. The climbing wall comes in at just
about 28 feet, which is a little shorter than desired.
Conditions of Approval
1. Height (elevation) certificate shall be submitted to the Community Development
Department prior to issuance of a Certificate of Occupancy.
It was moved and seconded (Newsom/Moreau) to approve the YMCA of the Rockies
height variance request with the findings and conditions recommended by staff and
the motion passed unanimously.
4. METES & BOUNDS PARCEL LOCATED AT 165 VIRGINIA DRIVE (Courtyard Shops)
Planner Kleisler stated the applicant was requesting a variance from EVDC Section 4.4,
Table 4-5, which requires buildings and accessory structures be setback a minimum of
eight (8) feet from the front property line in the CD–Commercial Downtown zone district.
The request is to encroach approximately four (4) feet into the setback to construct a 25-
square-foot fire riser room addition. The Courtyard Shops building is mixed-use, with
commercial units in the front, and residential units in the rear. Planner Kleisler stated the
applicant received a variance for the fire riser room addition on May 7, 2013, but did not
commence work before the variance approval expired. There have been no changes from
the original variance application. Planner Kleisler stated changes of use for portions of
the building triggered the requirement of an automatic fire sprinkler system. The riser
room is part of that system.
Planner Kleisler stated the application was routed to affected agencies, and comments
are addressed in the Conditions of Approval listed below.
Staff Findings
1. In determining whether or not special circumstances or conditions exist, staff found the
location of the water line/tap serving the Courtyard Shops building was determined
with the Virginia Drive paving project two years ago. At that time, the Town installed a
new water service line/tap in anticipation of the need to upsize service into the
building.
2. In determining “practical difficulty”, staff found:
RECORD OF PROCEEDINGS
Estes Valley Board of Adjustment 4
December 2, 2014
a. Installation of the sprinkler system has a significant positive impact on building use.
The illegal residential units can become legal units, and as businesses change in
the future, the sprinkler system provides more flexibility for uses of individual rental
spaces to change uses in the future.
b. The variance is not substantial. The eight-foot minimum setback allows for
sidewalks and pedestrian access in the downtown area. The adjacent sidewalk on
Virginia Drive and pedestrian traffic will not be adversely impacted.
c. Regarding substantial alteration of the essential character of the neighborhood,
staff found the sprinkler system will reduce risk of fire spreading to adjacent
properties and is, therefor, a benefit to adjacent properties. Building safety will be
significantly improved with installation of the sprinkler system.
d. The applicant purchased the property in 2013 with knowledge of the setback
standards.
e. The applicant’s predicament cannot be mitigated through some method other than
a variance. Per code, a room must be dedicated solely for use as the riser room.
The garage was considered an option, but it contains mechanical equipment and
electrical panels.
f. If authorized, the variance represents the least deviation that will afford relief. The
room is small at just 25 square feet.
g. In granting such variances the Board of Adjustment may require conditions. Staff
can determine compliance with the variance without a setback certificate.
Planner Kleisler stated staff recommended approval, with the conditions of approval listed
below.
Staff and Member Discussion
Member Darling inquired about the finish of the riser room.
Public Comment
Steve Carlyle/applicant stated the finish would match the existing exterior finish. He
explained there were problems locating and installing the water line prior to the summer
season, which delayed the process and allowed the previous variance approval to expire.
Conditions of Approval
1. Compliance with memo from the Estes Valley Fire Protection District dated November
19, 2014.
It was moved and seconded (Darling/Smith) to approve the variance request for the
Courtyard Shops with the staff findings and conditions recommended by staff and
the motion passed unanimously.
RECORD OF PROCEEDINGS
Estes Valley Board of Adjustment 5
December 2, 2014
5. REPORTS
1. Planner Kleisler reported on a variance request for lot width in the High Drive area.
The application will be before the Board of adjustment in March.
2. Planner Kleisler will continue bringing an educational piece to the Board. If the Board
has specific topics in which to become more educated, please let him know.
There being no other business before Board, the meeting was adjourned at 9:18
a.m.
___________________________________
John Lynch, Chair
__________________________________
Karen Thompson, Recording Secretary