HomeMy WebLinkAboutPACKET Estes Valley Planning Commission 2015-08-18Prepared: August 5, 2015
* Revised:
STUDY SESSION AGENDA
ESTES VALLEY PLANNING COMMISSION
Tuesday, August 18, 2015
12:00 p.m.
Estes Park Town Hall, Room 202
12:00 Lunch Chair Hull
12:15 Review of Minutes (5 minutes) Chair Hull
12:20 Transit Facility & Parking Structure Planner Kleisler
Development Plan 2015-04, Location & Extent
Review (20 minutes)
12:40 Vacation Home Update (30 minutes) Chair Hull
1:10 Adjourn to meeting Chair Hull
Informal discussion among Commissioners concerning agenda items or other Town matters may
occur before this meeting at approximately 11:45 a.m. The public is welcome to attend study
sessions; however, public comment will not be accepted.
Prepared: August 5, 2015
* Revised:
AGENDA
ESTES VALLEY PLANNING COMMISSION
August 18, 2015
1:30 p.m. Board Room, Town Hall
1. OPEN MEETING
Planning Commissioner Introductions
2. PUBLIC COMMENT
The EVPC will accept public comments regarding items not on the agenda. Comments should not
exceed three minutes.
3. CONSENT AGENDA
A. Approval of minutes, July 21, 2015, Planning Commission Meeting
4. DEVELOPMENT PLAN 2015-04 — ESTES PARK TRANSIT FACILITY & PARKING STRUCTURE,
500 Big Thompson Avenue
Owner: Town of Estes Park
Applicant: Ginny McFarland, Space Into Place
Request: Proposed parking structure, with Phase I adding one deck & 110 new spaces.
Future Phase II would add two additional decks and 198 new spaces. At
completion, 410 total spaces would be available for public parking.
Staff: Phil Kleisler
5. REPORTS
A. Estes Valley Board of Adjustment
1. Wilson Residence Variance Approved at a Special Meeting July 28, 2015
B. Estes Valley Planning Commission
1. Update on Downtown Neighborhood Plan process
2. Estes Valley Comprehensive Plan Modernization Update
C. Estes Park Town Board
D. Larimer County Board of County Commissioners
E. Flood Recovery/Mitigation
F. Vacation Home Rental Update
G. Other
6. ADJOURN
The Estes Valley Planning Commission reserves the right to consider other appropriate items not available at the time the agenda
was prepared.
RECORD OF PROCEEDINGS
Estes Valley Planning Commission
1
July 21, 2015
Board Room, Estes Park Town Hall
Commission: Chair Betty Hull, Commissioners Doug Klink, Nancy Hills, Steve Murphree, Sharry
White, Russ Schneider, Michael Moon
Attending: Chair Hull, Commissioners Klink, Hills, Murphree, White and Moon
Also Attending: Director Alison Chilcott, Planner Phil Kleisler, Town Attorney Greg White, and
Recording Secretary Karen Thompson
Absent: Town Board Liaison John Phipps, Larimer County Liaison Michael Whitley,
Commissioner Schneider
Chair Hull called the meeting to order at 1:30 p.m. There were approximately 15 people in
attendance. Each Commissioner was introduced. Chair Hull explained the process for accepting public
comment at today's meeting. The following minutes reflect the order of the agenda and not
necessarily the chronological sequence.
1. PUBLIC COMMENT
None.
2. CONSENT AGENDA
A. Approval of minutes, April 21, 2015 Planning Commission meeting.
It was moved and seconded (White/Klink) to approve the consent agenda as presented and the
motion passed unanimously with one absent.
3. AMENDED DEVELOPMENT PLAN 06-01D, MARYS MEADOW CONDOMINIUMS, TBD Kiowa Trail
and TBD Bemish Court
Planner Kleisler reviewed the staff report. He provided a brief history of the development and
stated this was the fourth amendment to this plan. The property is zone A—Accommodations, with
areas to the south zoned E-1—Estate. Areas to the west, north, and east are zoned A—
Accommodations, and includes some undeveloped property. The initial plan had a co-housing
concept, which was not attractive to buyers, so the plan was amended to include duplexes. The
applicant, Frank Theis, is now wrapping up the first phase, and ready to begin future phases. He
now wishes to move towards a more traditional model including duplexes and single family
dwellings. The proposed amendment reduces the density from 35 approved units to 24 proposed
units. Planner Kleisler stated the original development plan established Kiowa Trail, which is
maintained by the property owner. The site plan from the previously approved amended
development plan is being used for this project; however, there are some pedestrian circulation
and vehicle access changes. Bemish Court would come off of the northwest end of Kiowa Trail,
and would be the roadway for the single family dwellings. Both the duplexes on Kiowa Trail and
the homes on Bemish Court would have garages, allowing the removal of street parking on Kiowa
Trail. Planner Kleisler stated fairly significant changes have been made to the architecture of the
RECORD OF PROCEEDINGS
Estes Valley Planning Commission
2
July 21, 2015
Board Room, Estes Park Town Hall
proposed duplexes, as compared to the previously approved plan. The changes include, but are
not limited to, the inclusion of single-car garages.
Planner Kleisler stated the application was routed to all affected agencies for review and notice
was sent to the local newspaper and adjacent property owners. The Planning Commission
received public comment relating to the location of the proposed sewer line. The proposed sewer
line consists of a main extension between the Phase II and Phase Ill units. Upper Thompson
Sanitation District supports the concept, with minor changes involving moving the line to allow
better access, as well as prohibiting landscaping in the sewer easement. The current proposal
attempts to keep the natural flow of drainage throughout the site, which is why no curb and
gutter is proposed.
Planner Kleisler stated the applicant has requested a minor modification regarding the minimum
number of spaces for bicycle parking. The requirement is four (4) spaces. In accordance with the
Estes Valley Development Code (EVDC) Section 3.7, the Planning Commission may grant a minor
modification of up to a maximum of 25% from certain zone district standards. In this case, the
Commission could lower the requirement of four spaces to three spaces. The applicant is
proposing some surface parking and primarily single-car garages. Because of the limited garage
space, staff assumes future residents and guests would utilize bicycle racks. If the Commission
decides to approve the minor modification request, they would need to make one of the
following findings: (1) The modification advances the goals and purposes of the EVDC; (2) The
modification results in less visual impact; (3) The modification results in more effective
environmental and open space preservation; or (4) The modification relieves practical difficulties
in developing a site.
Public comment issues involve a no-build easement, which is shown on the plat. There was no
town involvement with the creation of the easement. Because it is a recorded easement, it is
required to be shown on the plat. Staff has reviewed this document with Town Attorney White,
and the legal opinion is the enforcement power of this easement rests with the developer and the
HOA. It is staff opinion the amended development plan complies with the easement. The
Easement states, in part, "...shall not build any buildings or structures within the area...to preserve
the view of condominium units over and across the portion of the property shown in Exhibit A."
Planner Kleisler stated the other key issue with this proposal is the grading for units 19 and 20 on
Bemish Court. A substantial amount of cut and fill was planned, and staff determined it did not
comply with the building standards in the EVDC. The applicant revised the plan by designing a
slightly steeper road that will eliminate most of the cut and fill. If those steps are taken, the
property would be in compliance with that standard. A condition of approval addresses this issue.
Staff Findings
1. The application is consistent with the policies, goals and objectives of the Comprehensive
Plan.
2. Adequate services and facilities are available to serve the development.
RECORD OF PROCEEDINGS
Estes Valley Planning Commission
3
July 21, 2015
Board Room, Estes Park Town Hall
3. If revised to comply with recommended conditions of approval, the application will
comply with applicable sections of the Estes Valley Development Code, as described in the
staff report.
4. The Planning Commission is the decision-making body for this application.
Staff and Commission Discussion
Planner Kleisler clarified the duplexes are proposed to have single-car garages, with the single-
family dwelling having double-car garages.
Public Comment
Frank Theis/applicant stated the project includes a construction site maintenance agreement to
ensure the area will be kept clean during construction. After discussion with the property owner,
he stated Unit 24 will be removed from the plan to satisfy owners of the nearest existing unit who
were concerned about that unit blocking their view. After this change, there would be a total of
23 units in the development.
Sabina McWhinney/town resident was one of the first residents in Phase I. She stated the HOA
requested the no-build easement, as a way to ensure the open space would remain as such in
order to maintain the view corridor. She stated the intent of the easement was housing units
would be limited to Kiowa Trail, and that the detention ponds would be constructed in a natural
manner. She was opposed to the single-family dwellings on Bemish Court. She was supportive of
the construction site maintenance agreement.
John Crone/attorney representing Marys Meadow Development clarified the No-Build Easement
is a private matter between the developer and the HOA, and is outside the purview of the
Planning Commission.
Beverly Wright/town resident was one of the original owners in phase I. She understood there
would be one more row of homes on Kiowa Trail (Phase II), and the developer never alluded to a
Phase Ill. She was opposed to the proposed development.
Frank Theis/applicant stated it was not his intent to mislead the property owners, and he is willing
to make concessions to satisfy them. His intent with the no-build easement was to prevent the
neighbors from seeing any buildings in the open space.
Mia Tawney/property owner stated Phase I was under construction at the time her father, Jim
Tawney, passed away. As the new property owner, her intentions are to keep the commitment
that her father wanted. Jim was a futurist and cared strongly about community. She explained
the concept behind the original co-housing development.
Sabina McWhinney/town resident stated the intent of the easement was to keep the area in its
natural state.
RECORD OF PROCEEDINGS
Estes Valley Planning Commission
4
July 21, 2015
Board Room, Estes Park Town Hall
Richard James/town resident stated his unit was going to be directly impacted by proposed Unit
24, and sees the removal of that unit as a positive. His main concern with this proposal is the
height of the buildings. He purchased his unit in 2013, and Mr. Theis presented a plan similar to
what is being presented with this application.
Public comment closed.
Staff and Commission Discussion
Town Attorney White clarified the easement was recorded with Larimer County. It is an easement
agreement between Marys Meadow LLC and Marys Meadow Condominium HOA. The Town is not
involved. The recording puts it on record so it will be found during a title search. He advised the
Planning Commission that it is not their responsibility to react to this easement.
Conditions of Approval
1. Compliance with the following affected agency comments:
a. Estes Valley Fire Protection District memo dated June 25, 2015;
b. Town of Estes Park Utilities Division memo dated June 25, 2015;
c. Town of Estes Park Community Development memo dated June 29, 2015;
d. Town of Estes Park Public Works memo dated July 13, 2015;
e. Upper Thompson Sanitation District memo dated July 15, 2015.
2. The site plan shall be amended to accurately show the existing grade and drainage flow
along Kiowa Trail, including how off-site drainage flows through the area near the existing
traffic island.
3. The slope of parking stalls shall be decreased to provide for safe vehicle access.
4. The site plan shall be amended to reflect the proposed adjustments detailed in the memo
from the applicant dated July 10, 2015. Such changes require the review and approval of
applicable reviewing agencies.
5. Utility pedestals and boxes north of Unit 18 shall be moved to the west to accommodate
20-foot clearance for utility truck access.
6. HOA Declarations shall be amended to prohibit any landscaping within the sewer and
electric easement area in Phase II and Ill, with the exception of small shrubs within three
(3) feet of units.
7. The site plan shall be amended to remove Unit 24.
It was moved and seconded (Klink/Hills) to approve the Amended Development Plan 06-01D,
with the findings and conditions recommended by staff and the motion passed unanimously
with one absent.
4. UPDATE ON VACATION HOMES REGULATIONS
Planner Kleisler stated the purpose of this presentation is to provide the Commission with an
update as to where staff and the Town Board are concerning vacation homes. Discussion has
occurred concerning changes to processes and policies throughout the Estes Valley. Vacation
RECORD OF PROCEEDINGS
Estes Valley Planning Commission
July 21, 2015
Board Room, Estes Park Town Hall
homes are becoming an issue nationwide. A major report, the Colorado Association of Ski
Towns (CAST) Report, addresses vacation homes and will be forwarded to the Commissioners
as soon as possible. The Town Board and County Commissioners requested staff review
processes and policies to ensure enforceability and meet the goals that they were initially
intended to do. He stated this information was shared at a Town Board Study Session, and the
Trustees wanted to make sure the Planning Commissioners were included in any conversation
concerning vacation homes. Planner Kleisler provided a recap of the schedule, stating June
through September would include refining the regulations and processes, with possible
adoption and implementation occurring before the end of 2015. In the spring of 2015, a public
meeting on this topic was held, and approximately 100 people attended and had the
opportunity to provide comments and share ideas about how vacation homes should or
should not be regulated in the Estes Valley. There will be an additional meeting in mid-
September to allow further discussion.
Planner Kleisler provided a summary of the trends. Legally permitted vacation homes have
increased by roughly 25% since 2010, and staff assumes this number will continue to rise. The
Larimer County attorney is reviewing the addition of licensing fees for vacation homes in the
Estes Valley, outside of Town limits. The main concerns coming out of the meeting included,
but were not limited to: enforceability, including fair fees and applications; clearly defined
expectations, signed by owners, posted for renters; property managers, or equivalent, held
responsible to "act"; flexibility in the regulations, recognizing differences of needs based on
location, lot size, proximity, and number of rooms. Occupancy limits were discussed, and
flexibility was encouraged. More specific comments/ideas were as follows: Property managers
should have clear expectations and processes for grievances; need not be a full-time resident
of Estes Park but must be easily reachable; residents in neighborhood and visitors to rental
have clear knowledge of who to contact for what; does not have to be property manager but
has to have clear access and accountability in the process. Town and County Fees should be
enforced with fines for violators; fees should be commiserate with occupancy limits and
enforcement time; fees need to be clear and concise and known by all. Location of vacation
homes should preserve the character of long-term neighborhoods, and more code
enforcement would be supported; Vehicles parked at vacation homes should be proportionate
with the size of the home. Attendees at the public meeting said they would like to see more of
the following: compliance, enforcement, clarity in the regulations, encouragement of long-
term rentals, and owner-signed statements stating they understand the regulations. They
would like to see less overlap of regulations between residents and rentals, and less
unenforced regulations. During a brainstorming session, attendees said the most important
considerations were: enforce, define and clarify; flexibility; clear lines of accountability for
owner/property manager; preserve neighborhood character; expand occupancy limits based
on size, number of bedrooms and bathrooms, lot location and size.
Planner Kleisler stated the project scope includes: Occupancy Limits, Vehicles and Parking, Fire
Protection, Workforce Housing Impact, Highway Development, Fees, Licensing, and Property
Management. There is now a trend occurring that the most dense zone districts for
RECORD OF PROCEEDINGS
Estes Valley Planning Commission
July 21, 2015
Board Room, Estes Park Town Hall
accommodation uses have less dense developments being built. Consequences for violations
have been rolled into the licensing and enforceability. The Town has one code compliance
officer, and vacation home regulations are a small part of her duties.
Commissioner White recommended the Commissioners read the CAST report when they
receive it. She thinks our community can learn a lot about this issue from other communities.
S. DISCUSSION CONCERNING ESTES VALLEY COMPREHENSIVE PLAN MODERNIZATION
Planner Kleisler stated this chapter, Planning the Valley's Future, sets the stage for the next
update of the Comprehensive Plan. The goal is to have a final draft of this chapter next month.
Planning the Valley's Future provides a primer on some key upcoming issues facing the
community. Much of this narrative is conceptual and policy related. As such, staff has
primarily updated the statistical information, and would welcome feedback to learn if they are
going in the right direction. Visit Estes Park has completed a study, and staff would like to
review that information and possibly add some of that information to the Plan. Commissioner
Moon stated he saw this chapter not as a code issue but a directional chapter. There are many
changes in the socio-economic aspect of our visitor base as well as residential base.
Workforce housing should be addressed. What do we want to be in 10 years? He urged the
Commission to be visionary in the document. He is willing to participate in the editing process
of this chapter. Planner Kleisler stated this chapter has a lot of gray areas, and it may be a
good idea to take it to Town Board and the County Commission in the near future to get their
feedback. Commissioner Klink explained the reason behind the modernization versus an
overhaul of the entire plan, where funding was an issue. Director Chilcott stated it would be
best to have the Downtown Neighborhood Plan concluded before pursuing additional funding
to fully update the Comprehensive Plan. She stated it was within the scope of the
modernization to accurate reflect the trends being seen by the town, county, state, and
country. However, there are some gray areas and we need to be cautious about being biased
about what trends we choose to include in the modernization of the plan. She would
recommend allowing staff to continue to work on this chapter, adding some additional
language. Staff could give the Planning Commission the original language and the proposed
language. Commissioner Hills recommended having each Commissioner provide written
comments to staff. Additional information will be provided at the next Planning Commission
meeting.
6. REPORTS
a. Director Chilcott reported the Board of Adjustment approved a variance request for a
storage shed on Pinewood Lane.
b. Director Chilcott reported the Riverview Pines Development Plan was withdrawn by
the applicant. Staff expects to see a revised plan in the next few months.
c. Director Chilcott reported the Town Board and County Commission approved the
amendment to the EVDC allowing pet grooming in the CD—Commercial Downtown
zone district. She stated the business owner requesting the amendment has since
closed her business.
RECORD OF PROCEEDINGS
Estes Valley Planning Commission
July 21, 2015
Board Room, Estes Park Town Hall
d. Director Chilcott reported the Town Board approved the Amended Plat for Silver Moon
Inn.
e. Director Chilcott reported the Marys Lake Replat Amended Development Agreement
was withdrawn by the applicant. She stated there was a steep lot in the Marys Lake
Subdivsion that the property owner hoped to place in a conservation easement. That
did not occur, and the property owner desired to make the lot available for a single-
family dwelling. A request was processes, but there were some legal issues and the
application was withdrawn pending resolution of the legal issues.
f. Director Chilcott reported staff would like to have a plan in place for public outreach
and education to inform the public of the risks of flooding. By flood standards, the
2013 flood was not a big flood for the local rivers involved. Staff expects FEMA to
require remapping of the floodplains using accurate information. Estes Park is in a high
risk area, and the cost of flood insurance will be extremely high. Staff is especially
concerned about the impacts of risk and the cost of insurance in the downtown area
and other areas near river corridors. Additional hydrology studies are being
completed. It is important that the Town have a good strategy to engage the public on
next steps for mitigation. Staff is working with Slate Communications to assist with a
successful public engagement process. The Town has contracted with Brian Varrella
from Olsson & Associates to perform our floodplain management duties for the
immediate future. Brian is the former floodplain manager for the City of Fort Collins,
and the past-president of the Colorado Association of Stormwater and Floodplain
Managers.
g. Director Chilcott reported staff is reviewing a possible change in the code to allow for
an extended re-build time, similar to what was done following the Woodland Heights
Fire. The elected officials have directed staff to put an amended re-build process in
place. The August agenda will include a draft EVDC amendment on this topic.
h. Director Chilcott reported the Downtown Plan Request for Proposal (REP) will be
released tomorrow. Consultants will have 21 days to submit proposals. A selection
committee will be created to select the consultant. Chair Hull stated Commissioner
White would be willing to serve on the selection committee if allowed the opportunity.
Director Chilcott stated she would need to submit an application.
There being no further business, Chair Hull adjourned the meeting at 3:04 p.m.
Betty Hull, Chair
Karen Thompson, Recording Secretary
fP
Estes Park Transit Facility Parking Structure
Estes Park Community Development Department, Planning Division
Room 230, Town Hall, 170 MacGregor Avenue
PO Box 1200, Estes Park, CO 80517
Phone: 970-577-3721 Fax: 970-586-0249 www.estes.org
ESTES VALLEY PLANNING COMMISSION
MEETING DATE & LOCATION: August 18, 2015, 1:30 PM; Board Room,
Town Hall, 170 MacGregor Avenue
APPLICANT REQUEST:
Location and Extent application review and approval.
STAFF OBJECTIVE:
1. Review for compliance with the Estes Valley Development Code
(EVDC); and
2. Provide a recommendation to the Planning Commission.
PLANNING COMMISSION OBJECTIVE:
1. Review for compliance with the Estes Valley Development Code
(EVDC);
2. Conduct a public hearing to consider applicants testimony, public
comment, and Town staffs findings and recommendations; and
3. Consideration of a motion approving or denying the application.
LOCATION: Lot 1, Visitor Center Subdivision; Lot 3, Stanley Meadows
Addition.
OWNER/APPLICANT:
Lot 1: Town of Estes Park
Lot 3: Rocky Mountain National Park
CONSULTANT/ENGINEER:
Primary Contact: David Bangs, Van Horn Engineering
STAFF CONTACT: Philip Kleisler, Planner II
REPORT SUMMARY:
This report describes a request to build a four story, 414 space parking
structure on government land just south of the Estes Park Visitor's Center
along Highway 36.
The applicant received land use approvals in March, 2014 to construct a
parking structure adjacent the Visitor's Center along Highway 34. Since
this time the applicant (Town) has determined that the proposed location
along Highway 36 was a better fit for the structure by achieving better
access and fewer visual impacts.
Staff reviewed this application for compliance with the Estes Valley
Development Code and finds that if revised to comply with recommended
conditions of approval, the application will comply with applicable
regulations. Therefore, staff recommends approval of the application,
subject to conditions described in the staff report.
CONTENTS
SITE DATA MAP AND TABLE. 3
PROJECT DESCRIPTION & REVIEW PROCESS: 6
REVIEWING AGENCY COMMENTS: 7
PUBLIC COMMENTS: 7
STAFF REVIEW: 8
STAFF FINDINGS 12
RECOMMENDATION 12
Estes Valley Planning Commission, August 18, 2015 Page 2 of 12
Estes Park Transit Facility Parking Structure
Stanley Village
Safeway
Light and Power
Fire District
To Visitor
Center Project
Site
SITE DATA MAP AND TABLE:
The building site is located directly south and across the Big Thompson
River from the Estes Park Visitor Center. Figures 1 a and 1 b shown below
provides views from Highway 36 showing the relationship of the project site
to surrounding buildings. Located less than one half block east of
downtown, the site is considered by many to be an important entry point
into the commercial center of Estes Park. The site is bordered by a river
and the Visitor Center to the north, a golf course to the east, highway and
single family residential homes to the south and downtown to the west.
Figures 2a thru 21 illustrate the overall residential and commercial context.
Figures la (above) and lb (below): Proximity of Site to Nearest Buildings
Figures 2a thru 21: Character of Surroundings
Parcel Number:
35251-71-901
25302-53-903
Project Area: 2.6 Acres
Existing Land Use:
94 Surface Parking Spaces (public)
Proposed Land Uses:
414-space multi-level parking structure
Services:
Water: Town of Estes Park Sewer: Estes Park Sanitation District
Hazards/Physical Features Mapped in the project vicinity?
Wildfire Hazard No
Geologic Hazard No
Wetlands No
Streams/Rivers Yes
Ridgeline Protection No
Wildlife Habitat Yes
PROJECT DESCRIPTION & REVIEW PROCESS:
This is a request to replace an existing surface parking lot with a four level
399-space structured parking facility. The parking structure will be located
south and across the river from the Visitor Center, and will utilize the
existing access from Highway 36.
This application package includes:
Location and Extent Review (§3.13): This Section is intended to
provide an opportunity for review of the location and extent of specified
public facilities and uses sought to be constructed or authorized within
the Estes Valley, especially as to whether such public use is consistent
with the Estes Valley Comprehensive Plan and the EVDC. Following
the Location and Extent Review, the applicant may exempt itself from
local zoning regulations; such an exemption requires a majority vote of
the entire Town Board.
c. Sosple Fertlly
lissIdenthi
Figure 4: Land Use of Subject Property
Fy
EsIale
Figure 5: Zoning of Subject Property
1, Estes Valley Planning Commission, August 18, 2015 Page 6 of 12
R Estes Park Transit Facility Parking Structure
Decision-Making Body: Estes Valley Planning Commission
Variance (§3.6): The location of the building is such that a setback
variance is required: the variance is to allow a greater setback than is
allowed in the Downtown district, which has a maximum front setback
requirement of 16-feet. The purpose of the maximum setback is to
maintain a 'street wall' in the downtown area.
The applicant is also seeking (i) height variance to account for the
additional (future) stories and light poles and (ii) a variance to allow the
main entryway to the structure not face the highway.
The variance application will be reviewed after the Planning
Commission's determination.
Decision-Making Body: Estes Valley Board of Adjustment
REVIEWING AGENCY COMMENTS:
This request has been submitted to reviewing agency staff for consideration
and comment. Memos are included as part of this staff report.
• Estes Park Sanitation District email dated July 16, 2015;
• Estes Valley Fire Protection District memo dated July 21, 2015,
2015;
• Town of Estes Park Utilities Department memo dated July 1, 2015;
• Town of Estes Park Community Development memo dated July 21,
2015;
• Town of Estes Park Public Works Department memo dated July 24,
2015;
PUBLIC COMMENTS:
In accordance with the notice requirements in the Estes Valley
Development Code, legal notices were published in the Estes Park Trail-
Gazette. Town staff exceeded typical mailings by sending notices to all
properties notified of the original proposal and all additional properties
within 1,500 feet. Additionally, a press release was also published on July
31, 2015, notifying the community of this review. Typical mailings include a
500-foot radius.
As of August 6, 2015, no formal written comments have been received for
this application package. Written comments will be posted to
www.estes.orq/currenta•_plications if received after August 6 and
summarized in the staff presentation.
, Estes Valley Planning Commission, August 18, 2015 Page 7 of 12
'; '1 Estes Park Transit Facility Parking Structure
STAFF REVIEW:
The area included as the project includes a small portion of Town-owned
land zoned CD to the west, with the remainder of the site being federally
owned, yet locally managed by the Estes Valley Parks and Recreation
District. Given the unique site, staff reviewed the proposal with the
assumption that the entire site is zoned CD. The rationale for this decision
is that this is a critical entryway to downtown and that any future rezoning
would likely be to CD.
Additionally, the applicant must obtain final approval from the U.S. Bureau
of Reclamation. The Bureau has the authority, given that they are the land
owner, to require adjustments to the site. Therefore, staff recommends that
the Planning Commission acknowledge that minor changes may be
necessary as a result of the Bureau's permitting process.
On a similar note, the applicant has also worked closely with the Estes
Valley Parks and Recreation District to mitigate any potential adverse
impacts to the golf course. Some minor changes may also be necessary
depending on further input from the Recreation District.
Use, Density and Dimensional Standards
The site plan demonstrates compliance with density and dimensional
standards, vehicular access/circulation requirements, and pedestrian
amenities/linkage requirements.
Use (EVDC §4.4)
As with the original proposal, a single use is proposed: Park and Ride
Facility, which is a Use-By-Right in the CD Commercial Downtown
district.
Grading and Site Disturbance Standards (EVDC §7.2)
The grading plan demonstrates compliance with general grading standards
such as limits on raising/lower natural grade and design of stormwater
basins. The plan attempts to limit grading disturbance by following the
natural grade of the land as much as possible. To that end, the plan
utilizes some of the existing surface parking spaces to the west as part of
the site design.
Landscaping and Buffers (§7.5)
The plan proposes various enhancements to the site, the centerpiece being
the wildflowers, shrubs and trees planted at the entryway to the structure.
Given the existing site conditions, there is very limited space available for
screening along the westerly, uncovered surface spaces. Staff finds that
the roadside light poles and planters achieve the EVDC intent for street
frontage landscaping.
Estes Valley Planning Commission, August 18, 2015 Page 8 of 12
E L'' Estes Park Transit Facility Parking Structure
Stall Depth
Stall Width
19'-6"
9'-0"
17'-9"
8'-6"
Drive Aisle 24'-0" 26'-0"
Parking Standard EVDC Requirement Proposed Dimensions
Exterior Lighting (EVDC §7.9)
The applicant has submitted an exterior lighting analysis (sheet 11 — 12)
that complies with this Section. The light poles on the top level will be
roughly 19 feet high (maximum height is 25 feet).
Off-Street Parking and Loading (EVDC §7.11)
The site plan generally demonstrates compliance with the EVDC Off-
street Parking and Loading standards. The applicant requests three
Minor Modifications to these standards:
1. Location of Parking
Section 4.4.D.3, Table 4-7 requires that off-street parking not be located
between the building line and the lot line in the CD district. In this case a
small handful of surface parking spaces to the west and east of the
building will be slightly in front of the building line. As with other standards
in the CD district, the intent of the requirement is to maintain a "street
wall" in the downtown area.
2. One-way Drive Aisle Width
Section 7.11.K.2 required a minimum driveway width of 15 feet for large,
non-residential uses. The ground level plan (sheet 5) proposes a 14-foot
one-way drive aisle entering from the, existing surface spaces on the
west.
3. Stall Dimensions
As with the original submittal, the applicant proposes slightly shorter stall
lengths, which as generally consistent with industry best practices for
parking structures. The intent of the request is to help minimize the
structure footprint, while still allowing for comfortable movement within the
structure. Additionally, the smaller stall depth will encourage drivers to
drive further into the stall, thus keeping a wider drive aisle for vehicles
passing circulating through the structure.
As shown below in Table 1, while the stall will be slightly shorter than the
requirement of 19'-6", the total length (staff depth + drive aisle) is wider
than the EVDC requirement.
Table 1. Pro osed alterations to •arkin. stall size.
Adequate Public Facilities (EVDC §7.12)
Adequate services and facilities are available to serve the development.
The design for public facilities will be finalized with construction plans.
Estes Valley Planning Commission, August 18, 2015 Page 9 of 12
Estes Park Transit Facility Parking Structure
Sewer
The structure will have no impact on nearby sewer lines along the west side
of the structure.
Water and Electric Service
Adequate water and electric service are available to serve the site. A water
main extension is required for fire protection. The applicant has worked
with the Water Division on a concept to provide non-potable water to the
site for the sole purpose of supporting two new fire hydrants.
An existing electrical line will be rerouted around the building to an existing
electrical vault on the north end of the structure (see sheet 10). The Light
and Power Division has no concerns with this approach.
Drainage.
The applicant has submitted a preliminary drainage report. Existing
drainage flows from the south will remain largely unchanged, traveling
through culverts/inlets under US-36. On-site pipes convey the runoff
through water quality ponds and discharge into the river. Some additional
details about the internal drainage concept will be needed with
construction plans. Public Works reviewed and provided comments for
the preliminary drainage report.
Fire Protection.
Two new hydrants will be installed just north of the structure for fire
protection (see sheet 10). The Estes Valley Fire Protection District did not
express concerns with this concept.
Transportation.
A traffic impact analysis (TIA) was submitted with the application, which
determined that no traffic improvements (e.g. traffic light) are required in
the public right-of-way as a result of this application. However, one warrant
was triggered, leading the traffic engineer to recommend additional
monitoring of the site to determine if a traffic light is needed in the future.
The TIA indicated that the left-turn movements of the parking facility and
onto US-36 will operate at a Level of Service F during the peak conditions
(pg. 23). A Level of Service is often used in transportation planning to
describe measures such as the average travel delay, number of vehicle
miles traveled and level of congestion. A Level of Service rating may cover
a variety of activities (e.g. transit, signalized intersections, bicycle facilities,
stairwells) and will range from an A through an F rating (with A being the
most functional).
Estes Valley Planning Commission, August 18, 2015 Page 10 of 12
c. 'I Estes Park Transit Facility Parking Structure
Both the intersection at the project site and at 34/36 has a Level of Service
rating of F during peak conditions. Because of this, the Public Works
Department requests additional alternatives and more analysis.
The TIA also indicated that the intersection of the parking facility may
warrant a signal by 2016 and recommends that the site be monitored over
time to assess the need for traffic light (pg. 23).
Outdoor Storage Areas, Activities and Mechanical Equipment (§7.13)
As with the original submittal, loading areas will be screened from public
view through landscaping and building placement.
Street Design and Construction Standards (Appendix D)
Many of the standards found in Appendix D are addressed with
construction plans, such as the detailed driveway design and erosion
control methods.
Minor Modifications
In summary, the applicant has requested three Minor Modifications, as
outlined in Table 2 below.
Table 2. Minor Modifications re • uested b a . Iicant.
Standard EVDC Section
Decision-making Body
Location of Parking
One-way Driveway Width
Parking Staff Dimensions
4.4.D.3, Table 4-7
7.11.K.2
7.11.0.3
Planning Commission
Planning Commission
Planning Commission
Estes Valley Comprehensive Plan
The site is located within the Downtown planning area. The proposed use
and design is consistent with the uses and issues outlined in the Estes
Valley Comprehensive Plan.
The Estes Valley Comprehensive Plan was adopted by the Estes Park
Planning Commission and Larimer County Planning Commission in 1996,
and continues to serve as the guiding document in the Estes Valley. A
component of the Estes Valley Plan was transportation planning to help
reduce downtown traffic congestion. To this end, the Town, Larimer
County, State, and Rocky Mountain National Park partnered in the creation
and adoption of the Estes Valley Transportation Alternatives Study in 2002-
2003. This study identified the Visitor Center for structured parking. The
proposed parking structure will fulfill this component of the Transportation
Alternatives report.
Community-Wide Policies. Community-wide policies in the Comprehensive
Plan include "the natural colors of wood and stone are most desirable for
Estes Valley Planning Commission, August 18, 2015 Page 11 of 12
Estes Park Transit Facility Parking Structure
building exteriors." The proposed structure includes stone veneer and
heavy timber.
STAFF FINDINGS:
Based on the foregoing, staff finds:
1. If revised to comply with recommended conditions of approval, the
application will comply with applicable sections of the Estes Valley
Development Code, as described in the staff report.
2. The application is consistent with the policies, goals and objectives of
the Comprehensive Plan.
3. Adequate services and facilities are available to serve the development.
4. The requested Minor Modification concerning the location of parking
relieves practical difficulties in developing the site.
5. The requested Minor Modification concerning the parking stall and
driveway dimensions results in more effective open space preservation.
6. The Planning Commission is the Decision-making Body.
RECOMMENDATION: Staff recommends APPROVAL of the Development
Plan (DP 2015-04)
All subject to the following conditions:
1. Variance approval for the building setback, height and location of
entryway.
2. Compliance with the following affected agency comments:
a. Estes Park Sanitation District email dated July 16, 2015;
b. Estes Valley Fire Protection District memo dated July 21, 2015,
2015;
c. Town of Estes Park Utilities Department memo dated July 1,
2015;
d. Town of Estes Park Community Development memo dated July
21, 2015; and
e. Town of Estes Park Public Works Department memo dated July
24, 2015.
SAMPLE MOTIONS:
I move to recommend APPROVAL (or denial) of Development Plan
Application 2015-04, as described in the staff report, with the findings and
conditions recommended by staff.
Estes Valley Planning Commission, August 18, 2015 Page 12 of 12
Estes Park Transit Facility Parking Structure
A
•••••••111
TOWN or ESTES PARK
Community Development Memo
To: Ginny McFarland, Applicant
Anirudh A. Chopde, Walker Parking Consultants
From: Philip Kleisler, Planner II
Date: July 21, 2015
RE: Estes Park Transit Facility Parking Structure — Findings of Compliance with Estes
Valley Development Code (EVDC)
This written analysis includes only those EVDC provisions that apply to this development
proposal. The following are a list of comments which must be addressed in order for staff to
determine that the application complies with the EVDC. Planning staff would like to meet with
you at your earliest convenience to discuss these comments.
Approach to this Review
As discussed in the Pre-Application Meeting, staff will review the application as if the
entire site is zoned CD Commercial Downtown. During the original review staff
determined this use to be classified as "Transportation Facility Without Repairs", which
is a Use by Right in the CD district, but does require Location and Extent Review by the
Estes Valley Planning Commission.
Building Height and Setback
1. Building height exceeds the maximum limit. A variance application has been submitted.
2. The proposed parking structure is setback 24' to 35' from the property line. The CD
district has a maximum setback of 16 feet. A variance application has been submitted.
3. Include the Annual High Water Mark to confirm River Setback (7.6.E.1.a.3).
Building Siting, Orientation and Materials Requirements
1. The main entrance of buildings shall be oriented towards highway (4.4.D.2.a). Please
add this to your Board of Adjustment Variance application.
2. Planters, as shown in visual illustrations, help achieve the Code requirement of avoiding
long, blank walls that face a public street (4.4.D.2.a).
Parking
1. Some off-street parking is located between the building line and lot line (4.4.D.3, Table
4-7, "Location of Parking"). The Planning Commission will consider this as a Minor
Modification.
2. The one-way drive on the ground level (sheet 5) is one (1) foot short of the 15 foot
requirement. The Planning Commission will consider this as a Minor Modification.
Page 1
3. The Planning Commission will consider your Minor Modification request for the stall
length, as outlined in the Statement of Intent.
Site Grading
1. Add Proposed Contours to Sheet 9 legend.
2. Indicate which trees are being removed. Proposed contours run over trees and through
driplines.
3. Slopes of 25% or less are strongly encouraged whenever possible (7.2.B.5.a). How
much additional site disturbance will take place as a result of decreasing the 3:1 slopes.
Slopes over 25% must be reestablished with plant materials with deep rooting
characteristics to minimize erosion and reduce surface runoff (7.2.C.3).
Landscaping
1. Parking Lot Perimeter Landscaping Requirements call for a minimum of one (1) tree per
twenty (20) lineal feet and one (1) shrub per five (5) lineal feet along the perimeter of a
parking area located adjacent to an arterial street. Due to existing conditions, there does
not appear to be adequate room for plantings along the existing westerly surface lot.
It also appears that partial intent of the roadside light poles and planters is to screen the
electric vehicle parking spaces. The grade separation also partially screens these
spaces.
2. A minimum of one (1) tree and two (2) shrubs should be planted in each interior
landscaped island.
Lighting
1. The style and height of light poles complies with §7.9 Exterior Lighting. Please note that
all outdoor light not necessary for security purposes shall be reduced, activated by
motion sensors devices or turned off during non-operating hours.
Easements
1. Do any of the platted easements need to be vacated with the new design?
Input from Golf Course
Planning staff understands and supports necessary changes to the site plan as a result of input
by the U.S. Bureau of Reclamation and/or Estes Valley Recreation District (i.e. Golf Course).
Staff will need to review changes to the plan to ensure compliance with the EVDC.
Drafting Modifications
1. An official Town Logo should be used in place of the Visit Estes Park logo (pg. 1).
Construction plans must address:
Page 2
1. 7.5.D.3.e: Trees cannot be within seven (7) feet of buildings.
2. Exterior Lighting:
a. Include unit fixtures, light pole height and design.
3. Label man-made slopes greater than 25%.
1. §7.2.0 Restoration of Disturbed Areas
2. §7.5.D.2.b.3 Root Zones. Trees need to be surrounded by pervious area around 1.5
times the area of the drip line.
3. §7.5.D.5 Standards for Protection During Construction.
4. §7.5.D.3.i No trees shall be planted within 25 feet of intersections
5. §7.5.D.5 Include plan for irrigation
6. §7.11.0 Parking and Loading Area Design Standards. Add note stating that markings
shall be white.
7. §7.11.J Accessible Parking for Disabled Persons regarding ADA signs and markings,
and slope of parking space and access aisle.
8. §7.13 Outdoor Storage Areas, Activities and Mechanical Equipment. Trash enclosure
materials, colors and design of screening walls or fences shall conform to those used as
predominant materials and colors of the buildings. If such areas are to be covered, then
the covering shall conform to those used as predominant materials and colors on the
building.
9. Appendix D.III.B.9 Driveway Design Requirements
10. Appendix D.I II. B.10 Driveway Construction Standards.
11. Appendix D.V Sidewalks, Pedestrian Connections and Trails
12. Appendix D.VI Erosion Control
13. Appendix D.VII Tree and Vegetation Protection During Construction and Grading
Activities
14. Appendix D.VIII Other Requirements, regarding construction plan approval, quality
control, etc.
15. Demonstrate positive drainage from building.
Page 3
A
EP
TOWN OF ESTES PARK
Memo
PUBLIC WORKS
To: Phil Kleisler
From: Kevin Ash, PE, Public Works Civil Engineer
Date: July 24, 2015
RE: Estes park Transit Facility Parking Structure Development Plan
Phil — Public Works has reviewed the submitted application for the Estes Park Transit
Facility Parking Structure and offers the following conditions:
Transportation:
1. Traffic Impact Analysis (FHU, June 2015) indicates left-turn movements out of
the parking facility site will operate at a Level of Service F during peak conditions.
A delay of 273.4 seconds is modeled for the 2020 period. The application should
acknowledge this impact and propose alternatives: right-in/right-out only in peak
season/peak hour times; signage; etc.
2. The traffic study indicates a warrant exists at the intersection for a traffic control
signal. This warrant is raised because of the peak hour volume. A warrant
exists, but that does not require the installation of a traffic signal. Discussions
with CDOT about a signal at this intersection should be ongoing. A schedule for
when this signal would be installed should be investigated.
3. LOS F conditions exist at the US 34/US 36 intersection. This application does
not address that issue.
4. Additional turn lanes at the intersection are not required.
5. Applicant is required to submit and get approval of Final Construction Plans
before construction of any transportation related infrastructure.
Drainage:
1. The submitted drainage report (Van Horn, June 24, 2015) addresses off-site
drainage basins from the south. Existing culverts/inlets will pass the flow from
the south across US 36. On-site pipes convey the runoff through water quality
ponds and discharge into the river. The proposed storm system re-routes this
storm pipe/pond system — and adequately conveys off-site runoff flows.
2. Drainage Plan does not address proposed runoff inside the structure (or the top)
with much detail. Drainage flow arrows/slopes/elevations/inlets/etc. should be
provided.
3. Applicant is required to submit and get approval of Final Construction Plans
before construction of any drainage related infrastructure.
From: James Duel(
To: pkleisler(aeste_s.org
Subject: RE: REFERRAL FOR COMMENT: FINAL REVIEW - Estes Park Transit Facility Parking Structure - Lot 1, Visitor
Center Subdivision less por. in Tax Dist. 3300 - 500 Big Thompson Avenue
Date: Thursday, July 16, 2015 12:57:47 PM
Hello Phil — as per review of the 6/24/15 Estes Park Transit Facility Parking Structure plans, structure
will have no impact on the District or our lines that are along the west side of the structure
providing that no cover is removed the line location.
Also the District is fine with draining the 3000 gallon sand and oil interceptor to the water quality
pond and subsequently the river drainage. Obviously regular cleaning of the interceptor will be
required to ensure the purpose of the interceptor.
Thank you — Jim Duell, Estes Park Sanitation District
From: pkleisler@estes.org [rnailto:pkleisler@estes.org ]
Sent: Tuesday, July 14, 2015 1:20 PM
To: 'Karen Thompson'; 'Greg White'; 'Frank Lancaster'; 'Alison Chilcott'; 'Greg Muhonen'; '05 Kevin Ash';
'06 Jen Imber'; '07 Susie Parker'; 'Cliff Tedder; 'Steven Rusch; '08 Jeff Boles'; '09 Reuben Bergsten';
'Joe Lockhart'; 'Will Birchfield'; '12 Marc Robinson'; '13 Eric Rose'; '14 Skyler Rorabaugh'; 'Kate Rusch';
'31 Gloria Hice-Idler'; '32 Rick Spowart'; 'Jim Duell'; 'Ron Duell'; '47 Laura Harger'; 'Stroh, Terence'
Cc: 'Ginny McFarland'
Subject: RE: REFERRAL FOR COMMENT: FINAL REVIEW - Estes Park Transit Facility Parking Structure -
Lot 1, Visitor Center Subdivision less por. in Tax Dist. 3300 - 500 Big Thompson Avenue
The routing attachment was not attached to the previous email (my apologies)
Phil Kleisler
Planner II
Town of Estes Park, CO
970.577.3725
From: pkleislerestes.oro [nnailto:pkleisler(aestes.orcil
Sent: Tuesday, July 14, 2015 1:18 PM
To: 'Karen Thompson; 'Greg White'; 'Frank Lancaster'; 'Alison Chilcott; 'Greg Muhonen'; '05 Kevin Ash';
'06 Jen Imber; '07 Susie Parker'; 'Cliff Tedder'; 'Steven Rusch; '08 Jeff Boles'; '09 Reuben Bergsten';
'Joe Lockhart'; 'Will Birchfield'; '12 Marc Robinson'; '13 Eric Rose'; '14 Skyler Rorabaugh'; 'Kate Rusch';
'31 Gloria Hice-Idler'; '32 Rick Spowart'; 'Jim Duell'; 'Ron Duell'; '47 Laura Harger'; 'Stroh, Terence'
Cc: 'tinny McFarland'
Subject: REFERRAL FOR COMMENT: FINAL REVIEW - Estes Park Transit Facility Parking Structure - Lot
1, Visitor Center Subdivision less por. in Tax Dist. 3300 - 500 Big Thompson Avenue
Good afternoon,
Attached please find the guidelines for commenting on the FINAL REVIEW of the project listed
above. The Parcel ID is 25302-84-901. Documents can viewed at
www.estes.org/currentapplications. Please let me know if you prefer hard copies (no changes to
the site plan were made through the completeness stage).
Comments concerning this review are due on or before Friday, JULY 24, 2015. Please be sure to copy
the applicant on your comments (ginnyPspaceintoplace.com ).
Please let me know if you have any questions. We look forward to hearing from you and please
don't hesitate to contact with any questions.
Phil Meister
Planner II
Town of Estes Park, CO
970.577.3725
ESTES VALLEY
FIRE PROTECTION DISTRICT
1907
Serring the Residents and Tisitars of the Estes Miley with Superior Fire and Safety Services
PLAN REVIEW COMMENTS
Date: July 21, 2015
Project Identification: Estes Park Transit Facility & Parking Structure
Location: Lot 1 Visitor center Subdivision
Referral: Step 3: Final Development Review
The Estes Valley Fire Protection District has reviewed the submitted material describing the
proposed project referenced above, and approves those plans contingent on compliance with
the following requirements (conditions of approval):
Prior to the issuance of a building permit the following requirements shall be met:
1. Construction plans (access / roads, water line system design) shall be reviewed and must
meet approval of the Fire District.
2. The new required fire hydrants shall be installed before any combustible material are on
site. The hydrants shall be maintained operational at all times thereafter, unless alternate
provisions for water supply are approved by the fire District. The Town of Estes Park must
approve the installation and oversee the testing of water mains and hydrants.
3. 3 foot clear space shall be maintained around the circumference of the proposed fire
hydrants.
4. In accordance with IFC Chapters 5 and 14, approved fire department access shall be
provided during all phases of construction, as well as to completed buildings. The criteria
for fire department access roads shall be as follows:
A. Permanent asphalt or concrete roads shall be installed unless a temporary road
surface, such as recycled asphalt or concrete, is approved.
B. Fire apparatus access roads shall be designed and maintained to support the
imposed loads of fire apparatus.
C. The unobstructed width of a fire apparatus access road shall be not less than 20
feet.
D. Turning radii of a fire department access road shall be a minimum of 25 feet inside
and 50 feet outside.
E. All dead-end roads in excess of 150 feet in length shall provide adequate space for
fire apparatus to turn around.
F. Emergency access gates shall be located a minimum of 40 feet back from the
adjacent street flow line. Swinging gates must open in the direction of ingress (both
directions) to the site. Gates must have a minimum opening width of 20 feet
Emergency only access gates shall have approved signage marked:
EMERGENCY ACCESS ONLY
NO PARKING FIRE LANE
901 N. Saint Vrain Avenue • Estes Park, CO 80517 • P-970-577-0900 • F-970-577-0923
#14(i,
ESTES VALLEY
FIRE PROTECTION DISTRICT
Serving the Residents and Visitors of the Estes Valley with Superior Fire and Safety Services
4. Fire apparatus access roads shall be permanently signed and / or marked "NO
PARKING FIRE LANE" in accordance with municipal sign/traffic standards.
A. Access roads less than 26 feet wide shall be marked as fire lanes on both sides
of the road.
B. Access roads at least 26 feet wide but less than 32 feet wide shall have at least
one side of the road marked as a fire lane.
C. Access roads at least 32 feet wide need not have fire lane markings.
All construction and processes shall be in accordance with the provisions of the International
Fire Code (2009 Edition) and the International Building Code (2009 Edition).
Nothing in this review is intended to authorize or approve any aspect of this project that does
not strictly comply with all applicable codes and standards. Any change made to the plans will
require additional review and comments by the Estes Valley Fire Protection District.
If you have any questions please feel free to contact me.
Sincerely,
Marc W. Robinson
Fire Marshal
970-577-3689
mrobinsonOestesvalleyfire.org
901 N. Saint Vrain Avenue • Estes Park, CO 80517 • P-970-577-0900 • F-970-577-0923
A
EP
TOWN or EST ES PARK
Inter-Office Memorandum
To: Community Development
From: Steve Rusch
Date: 7/1/2015
Re: REFERRAL FOR COMMENT: COMPLETENESS - Estes Park Transit
Facility Parking Structure - Lot 1, Visitor Center Subdivision less por. in
Tax Dist. 3300 - 500 Big Thompson Avenue
The Utilities Department has the following Completeness Review comments for
the above application:
Water Division:
The above application is complete for Water Division review but not approved as
waterline construction drawings for the water line installation or issuance of any
building permits.
A Water Main Extension will be required for fire protection. At this time, this new line
will be required to have an approved backflow prevention assembly and pressure
reducing valve installed at the tie in point of the extension and it is to be considered
a non-potable water main for the sole purpose of supporting two new fire hydrants.
This assembly is to be owned, tested annually and maintained by the Town's Public
Works Department. Spill control method must be shown for proper disposal of
discharge from the relief valve, indicating location and sizing of drainage capable of
accommodating the discharge that could occur. Gate valves will be needed at each
of the two dead end lines for future connections to eliminate the dead ends and the
need for backflow protection. This infrastructure must be installed; testing
performed/passed and accepted by the Division prior to issuance of any building
permits. Any project phasing of the infrastructure must be submitted with the
construction drawings for approval prior to construction. Phased infrastructure must
be completed and accepted prior to issuance of any building permits within the
phase.
Construction Drawings are required and must be submitted for review, approval
and signatures by the Utilities Director or his designated representative. No
installation of any project infrastructure is allowed until the Construction Drawings
have been signed. All water main lines and easements must be deeded to the
Town of Estes Park. Along with the submission of the construction drawings
A
EP
TOWN 01: ESTES PAR1c
Inter-Office Memorandum
provide the contact information of the firm or person acting as Utility Construction
Manager for the project.
Construction drawings must include:
• Plan and profile to show potential conflicts between water and other
utilities including culverts, show Utility Easement locations when utility is
not in Road Right of Way.
All water line design and construction shall be done according to the Water Utility
Policies and Standards. All water main lines and easements must be deeded to the
Town of Estes Park.
All water mainlines are required to have a minimum of 10 ft. horizontal separation
from both sanitary sewer and storm sewer. Additionally, water mainlines are
required to have a minimum 4 ft. horizontal separation from all other utilities.
All construction and processes shall be in accordance with the provisions of the
International Fire Code (2009 Edition), the International Building Code (2009
Edition) and Town of Estes Park Codes and Standards.
Nothing in this review is intended to authorize or approve any aspect of this project
that does not strictly comply with all applicable codes and standards. Any change
made to the plans will require additional review and comments by the Town of Estes
Park Water Division.
Light and Power:
The above application is complete for review but not approved as construction
drawings or issuance of any building permits.
• Please schedule a required meet at site with Joe Lockhart, Line
Superintendent at (970)577-3613.
• All infrastructures must be paid in advance to the Town of Estes Park. No
Building permits will be approved by Light & Power until such time.
• All new construction must be underground. Trenching & conduit to be
provided and installed by developer to Town specifications.
• All other material will be purchased from & installed by the Town of Estes
Park.
TOWN or ESTES PARIc
Inter-Office Memorandum
• All Town of Estes Park Light and Power lines, (Primary/Secondary) must
have a 20 ft. utility easement. This easement can be shared by water,
phone and cable.
• Water must be at least 4ft from electric.
• All services must be on the owner's property.
• The size of the service must be shown on the electrical drawings.
• All existing lines must be shown on the electrical drawings.
• Transformers/pen cells must be in an easement, or if possible on the
property line.
• All primary lines must be 4ft deep with red warning tape at 2ft.
• All subdivision must be designed by an electrical engineer.
• All pipes must be schedule 40 gray PVC pipe, if there are more than 4
pipes in a trench then all conduit must be put into a pipe rack.
• Town must have ownership of all road crossings.
• On underground electric services, it will be the electrician's responsibility
to dig them into the transformers or pedestals.
• The electrician will need to schedule with L&P to unlock and open
transformers or pedestals.
• All temporary and permanent electric services will be connected by Light &
Power within 5 business days after the state electrical inspection & fees
are paid.
• Permanent meter sockets must be permanently marked with address or
unit number.
• All spare conduits will be provided by Light and Power and to be installed
by the developer at their cost. Light and Power will not reimburse
contractor or developer for conduit obtained elsewhere.
Nothing in this review is intended to authorize or approve any aspect of
this project that does not strictly comply with all applicable codes and
standards. Any change made to the plans will require additional review
and comments by the Town of Estes Park Light and Power Division.
From: Glenn Malpiede [mailto:glennOesteslegalservicescom]
Sent• Tuesday August 11, 2015 6:25 PM
To: pkleisler@lestes.orq
Subject: Transit Facility Parking Structure
Hi Phil, c_.(aymoy,,,.
V...._JL___ EL0P4::"
At i G 1 2 2015 id 0
lib(ill
----4,10)
I just wanted to reiterate my opinion regarding the stair tower on the northeast corner of the Transit Facility Parking
Structure as presented in the public input meeting where the clear majority of us chose the four-story tower vs the two-story
tower despite the possibility that the parking structure itself may only have two stories for some period of time.
My understanding is that, since that meeting, there have been discussions of, instead, moving the stairwell inside the
structure and eliminating the tower. I, and others with whom I have discussed this, feel that this would be a lost opportunity, at
best (and a huge mistake at worst).
My understanding is that the reason for this is because the golf course has pointed out that there would be a danger of flying
golf balls entering the exposed stairwell, a danger, I might add, that currently exists throughout the current parking area
where the structure is to be built, yet nothing has ever been constructed to "protect" the occupants exiting or entering vehicles
(or the vehicles themselves) for all this time.
So why worry now?
Furthermore, even if suddenly there were some compounded danger (which I simply cannot accept) the "exposed" tower
stairway could easily be protected with some form of netting without losing the positive aspects of being more esthetically
pleasing and offering an attraction to tourists at the same time.
Please do not change the structural plans that the entire community approved simply to "avoid" a truly non-existent "danger"
(or at the very least, a "danger" which has been accepted for many years in relation to the current parking configuration).
Thank you.
Best regards,
Glenn
Glenn D. Malpiede, Esq.
Estes Legal Services, LLC
212 Virginia Drive
Estes Park, CO 80517
Office: 970-586-2874
STATEMENT OF INTENT FOR PLANNING COMMISSION
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE PARKING CON SUIANTS
ift441-;: WALKER
AUGUST 12, 2015
STATEMENT OF INTENT
DESCRIPTION
tti2 E Li
AUG 1 2 205
FZ
cgAtywrirpEvELopmENT
The need for the proposed Estes Park Transit Facility Parking Structure was identified in the Estes
Valley Transportation Alternatives Study, by Felsburg Holt & Ullevig, published in 2013. This Study
identified the need for an additional 525 new parking spaces to serve the needs of Estes Park in
2020 due to increased visitation to Rocky Mountain National Park.
The proposed parking structure will be located across the river from the existing Visitor Center
and will provide an improved visitor experience by providing a total of 410 parking spaces, 258
of which will be covered.
An initial phase of the project with 110 new spaces on two levels is currently funded, and two
additional levels will be possible if more funding becomes available. A total of 308 new parking
spaces could be achieved in a future four-level structure. The first phase, a two-level design, will
result in an upper deck approximately level with U.S. 36 adjacent to the structure. When the full
four-level structure is funded, the height above the level of U.S. 36 will be similar to that of a two-
story home. View corridors to the Continental Divide, Lumpy Ridge and the Stanley Hotel will be
maintained except for a momentary lapse in view for westbound motorists as they pass the
structure on U.S. 36.
UTILITIES
Sanitary sewer lines: The site contains no sanitary sewer lines. No sanitary sewer will be required
for this project.
Drainage / Storm Sewer: The historic drainage is mostly handled as sheet flow across the subject
property with the exception of some existing storm drainage paths that are discharged onto the
property in the form of point releases from the mostly undeveloped areas located to the south
of Highway 36. All flows from the parking lot area then pass through the site and are discharged
into a water quality basin prior to discharging into the Big Thompson River. The major drainage
flow paths for offsite flow will still be kept historic for the most part by the use of the proposed
storm sewer networks. The runoff generated on the western side of the site is proposed to be
conveyed to the eastern side of the lot and discharged into a rain garden which will provide
water quality treatment of storm water discharge from the parking areas. The flow from the
eastern side of the site will be handled as sheet flow into the golf course area as currently occurs
and functions as a natural grass buffer for treatment of storm water flows prior to being
discharged into the river.
Water: The site contains no water lines or service. New water lines for fire protection will be
installed, either through extension of an existing line to the east of the site, or extension (under
the river of and existing line to the north across the river.
Page I of 4
STATEMENT OF INTENT FOR PLANNING COMMISSION
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
WALKER -44§1-3r PARKING CONSUTANTS
AUGUST 12, 2015
Electric: There is an existing electrical vault on the site, and conduit / supply to it directly under
the area to be developed. Plans are being made to provide for access to these lines through
construction accommodation and easement or special use permit with the BoR.
Fiber: There is an existing fiber line that is located along the buried primary power through the
site and extends into the electrical vault; it comes from the west foot bridge. The line is a critical
communications line that is looped in the valley, but there are plans in place (as part of a
different project) to sever the loop on the other side of Town for repairs.
Gas: No natural gas mains are known to pass through the subject property.
PUBLIC OUTREACH
This project has continued the intensive public outreach effort that was started with the original
plan to locate this project on the north visitor center parking lot. In that effort, a three day design
charrette gathered and engaged residents and stakeholders. Public desire was gaged on
programming and site use, aesthetic preferences, and practical feedback, all of which was
considered, with much of it integrated in rendering the design for that first effort. Much of that
feedback and public engagement has been translated and reintegrated in this refreshed south
site effort. The public has been invited to public presentation and polled for thoughts and
feedback on the initial designs in the last several weeks and months, Specific feature integration
has been with regard to roof form (gable selected over flat), color and stair tower
integration. The public was polled on height of the structure and all unanimously agreed that a
four story structure was preferable to a two story structure. We have received comment in
public presentation and through website feedback and response to several email outreach
efforts.
BICYCLE RACK INTEGRATION
Bicycle racks will be integrated on the north side of the structure, with some under cover and
some more visually apparent on the exterior of the structure. Because high usage is anticipated,
the design team will integrate a higher than required number of bicycle securing stations. The
design team is looking at new, innovative rack design, to encourage use and elevate
awareness of their presence.
MINOR MODIFICATIONS
1. Off Street Parking and Loading (EVDC Section 7.11.0.3)
A Planning Commission minor modification is requested from the Town of Estes Park Zoning
requirement 7.11.0.3 which requires 9'-0" wide parking spaces with a 19'-6" stall depth and 24'-
0" two-way drive aisle for 90° parking. This results in a 63'-0" parking module. We typically
Page 2 of 4
STATEMENT OF INTENT FOR PLANNING COMMISSION
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
-1 %.,-"Zif, WALKER
..IlpiP PARKING CON5AANI5
AUGUST 12, 2015
recommend a Level of Service (LOS) A parking module of 61'-6", in accordance with industry
recognized and published parking dimensions. This slightly smaller parking module will continue
to provide an industry recognized highest level of service for patrons, while helping to minimize
the footprint of the parking structure.
The "level of service" approach used by traffic engineers con also be used as a tool for adapting
parking module designs to the specific needs of users. LOS A, which is the most comfortable,
allows vehicle movement with little or no constraint. As the level of service decreases, from A
to D, the comfort level decreases, LOS D is the minimum dimension for safe maneuvering of a
vehicle at low speed.
The table below displays published LOS A, or "high level of comfort" parking module dimensions.
Reference Stall Width Stall lencith Aisle Width Module
Urban Land Institute' 9'-O" 18'-0" 25'-0" 61'-0"
Walker Standards 2 91 -0" 17'-9" 26'-0" 61'-6"
National Parking Association 3 9'-0" 18'-0" 25'-6" 61'-6"
1. Smith, Mary and Cnristiar Luz. 'Parking C-eornetlics," in The Dimensions of Parking 'Fifth Edition) Woshingion. DC: Urban
iond Institute, 2010.
2. &test, Anthony, Mary Smith, et al Parking Structures, Third Edition. Boston. Kluwer, 2001
3. Pori,ing Consultants Council. Guidelines for Parking Geometries, Washington DC: National Porking Association, 201i
However, considering the various site constraints the proposed garage has to meet while
maintaining a minimum parking counting, we are proposing to use 8'-6" wide stalls, in lieu of
9'-0" wide, with a 61'-0" parking module, which results in a LOS B. By implementing these
measures, the structure will be shorter by 9'-0" in the east-west direction and by 2'-10" in the
north-south direction. The smaller footprint structure snug-fits on the site in a way that is
acceptable to all the stakeholders, i.e. Public Works, Bureau of Reclamation, and Recreation
District. To summarize, the parking garage will have a 61'-6" parking model with 26'-0" drive
aisles and 8'-6" by 17'-9" stalls.
2. Off-Street Parking Located Between the Lot Line and Building Line (4.4.D.3. Table 4-7,
"Location of Parking")
The design team has located a very small portion of parking {less that the equivalent of one
whole stall) between the lot line and building line, due to site constraints. Maximum effort has
been given to work with in the code intent to maintain the building edge at the street without
parking between street and building. The vast majority of the site design complies with
building edge at or near the street, with no parking between. The plan as shown maximized
landscaping opportunities with required parking stalls.
Page 3 of 4
STATEMENT OF INTENT FOR PLANNING COMMISSION
WALKER
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
.41%.11114.. I'ARKING CONSULTANTS
AUGUST 12, 2015
3. The One-Way Drive (Sheet 5) is 14 Feet Wide, One Foot Short of the Required 15 Feet Drive
Aisle Minimum.
The design team requests a minor modification to allow 14 foot drive aisle in this location, as
the 15 feet in this application is not material to parking drive level of service.
MAIN ENTRANCE OF BUILDINGS (EVDC SECTION 4.4.D.2.A)
The Design Team has carefully considered the design intent of Section 4.4.d.2.a. of the Code
with regard to entrance facing the street or highway. The urban design intent of this
development is to create street frontage and gateway to the community, in accordance with
design intentions of the Commercial Downtown District. The entrance to the structure will be
highly visible from the street (Highway 36) and the East and South Facades are to be positioned
to enhance the Gateway entrance quality to the community of Estes Park. The South Facade,
facing the street will be treated as celebrated entrance way, with flags and flowers, framing
the arrival of guests.
PARKING LOT LANDSCAPING (SECTION 7.5.G)
A Planning Commission minor modification is requested from the Town of Estes Park Zoning
requirement 7.5.G which requires minimum parking lot interior landscaping for all parking lots
with thirty (30) or more parking places.
We are proposing to preserve the existing planting zones, including existing trees, in the median
adjacent to Highway 34. Of the 39 surface lot parking stalls on the site, 20 are existing in the
southwest portion of the site, with no proposed modifications in this phase. The 19 new surface
lot stalls are proposed in the same location as an existing surface lot, (modified to provide
improved circulation for the visitor's center and new circulation to the proposed parking
structure) and do not introduce new uses or hardscape to areas that were not previously used
as surface parking.
We believe that the parking and landscape improvements proposed as part of the Transit
Facility Parking Structure project, specifically preserving the median adjacent to Highway 34,
the addition of a large vegetated round-about median, and the increased parking efficiency
of the Parking Structure itself, meets the design intent of the Parking Lot Interiors section, although
the project does not propose any individual landscaped islands.
Page 4 of 4
STATEMENT OF INTENT
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE 4GCONSUtTAN'5 TAN' .444' WALKER
JULY 14.2015
[I)
STATEMENT OF INTENT /
JUL 1
DESCRIPTION
ENIE1 h 2 2015
COMMUNITY DEVELOPMENT I
The need for the proposed Estes Park Transit Facility Parking Structure was iden Hied in the Estes
Valley Transportation Alternatives Study, by Felsburg Halt & Ullevig, published in 2013. This Study
identified the need for an additional 525 new parking spaces to serve the needs of Estes Park in
2020 due to increased visitation to Rocky Mountain National Park.
The proposed parking structure will be located across the river from the existing Visitor Center
and will provide an improved visitor experience by providing a total of 410 parking spaces, 258
of which will be covered.
An initial phase of the project with 110 new spaces on two levels is currently funded, and two
additional levels will be possible if more funding becomes available. A total of 308 new parking
spaces could be achieved in a future four-level structure. The first phase, a two-level design, will
result in an upper deck approximately level with U.S. 36 adjacent to the structure. When the full
four-level structure is funded, the height above the level of U.S. 36 will be similar to that of a two-
story home. View corridors to the Continental Divide, Lumpy Ridge and the Stanley Hotel will be
maintained except for a momentary lapse in view for westbound motorists as they pass the
structure on U.S. 36.
UTILITIES
Sanitary sewer lines: The site contains no sanitary sewer lines. No sanitary sewer will be required
for this project.
Drainage / Storm Sewer: The historic drainage is mostly handled as sheet flow across the subject
property with the exception of some existing storm drainage paths that are discharged onto the
property in the form of point releases from the mostly undeveloped areas located to the south
of Highway 36. All flows from the parking lot area then pass through the site and are discharged
into a water quality basin prior to discharging into the Big Thompson River. The major drainage
flow paths for offsite flow will still be kept historic for the most part by the use of the proposed
storm sewer networks. The runoff generated on the western side of the site is proposed to be
conveyed to the eastern side of the lot and discharged into a rain garden which will provide
water quality treatment of storm water discharge from the parking areas. The flow from the
eastern side of the site will be handled as sheet flow into the golf course area as currently occurs
and functions as a natural grass buffer for treatment of storm water flows prior to being
discharged into the river.
Water: The site contains no water lines or service. New water lines for fire protection will be
installed, either through extension of an existing line to the east of the site, or extension (under
the river of and existing line to the north across the river.
Page 1 of 3
STATEMENT OF INTENT
WALKER
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
JULY 14. 2015
Electric: There is an existing electrical vault on the site, and conduit / supply to it directly under
the area to be developed. Plans are being made to provide for access to these lines through
construction accommodation and easement or special use permit with the BoR.
Fiber: There is an existing fiber line that is located along the buried primary power through the
site and extends into the electrical vault; it comes from the west foot bridge. The line is a critical
communications line that is looped in the valley, but there are plans in place (as part of a
different project) to sever the loop on the other side of Town for repairs.
Gas: No natural gas mains are known to pass through the subject property.
PUBLIC OUTREACH
This project has continued the intensive public outreach effort that was started with the original
plan to locale this project on the north visitor center parking lot. In that effort, a three day design
charrette gathered and engaged residents and stakeholders. Public desire was gaged on
programming and site use, aesthetic preferences, and practical feedback, all of which was
considered, with much of it integrated in rendering the design for that first effort. Much of that
feedback and public engagement has been translated and reintegrated in fhis refreshed south
site effort. The public has been invited to public presentation and polled for thoughts and
feedback on the initial designs in the last several weeks and months. Specific feature integration
has been with regard to roof form (gable selected over flat), color and stair tower
integration. The public was polled on height of the structure and all unanimously agreed that a
four story structure was preferable to a two story structure. We have received comment in
public presentation and through website feedback and response to several email outreach
efforts.
BICYCLE RACK INTEGRATION
Bicycle racks will be integrated on the north side of the structure, with some under cover and
some more visually apparent on the exterior of the structure. Because high usage is anticipated,
the design team will integrate a higher than required number of bicycle securing stations. The
design team is looking at new, innovative rack design, to encourage use and elevate
awareness of their presence.
MINOR MODIFICATIONS
OFF STREET PARKING AND LOADING (EVDC SECTION 7.11.0.3)
A Planning Commission minor modification is requested from the Town of Estes Park Zoning
requirement 7.11.0.3 which requires 9'-O" wide parking spaces with a 19'-6" stall depth and 24'-
0" two-way drive aisle for 90° parking. This results in a 63'43" parking module. We typically
Page 2 of 3
STATEMENT OF INTENT
WALKER
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
PARKING CONSO:AN7S
JULY 14, 2015
recommend a Level of Service (LOS) A parking module of 61 1 -6", in accordance with industry
recognized and published parking dimensions. This slightly smaller parking module will continue
to provide an industry recognized highest level of service for patrons, while helping to minimize
the footprint of the parking structure.
The "level of service" approach used by traffic engineers can also be used as a tool for adapting
parking module designs to the specific needs of users. LOS A, which is the most comfortable,
allows vehicle movement with little or no constraint. As the level of service decreases, from A
to D, the comfort level decreases, LOS D is the minimum dimension for safe maneuvering of a
vehicle at low speed.
The table below displays published LOS A, or "high level of comfort" parking module dimensions.
Reference Stall Width Stall Length Aisle Width Module
Urban Land Institute' 9'-O" 18'-0" 251 -0" 61'-0"
Walker Standards 2 9,_0" 17'-9" 26'-0" 61'-6"
National Parking Association 3 9 1 -0" 18`-0" 25'-6" 611 -6"
1. Smith, Mary and Christian Luz, 'Parking Geometries,' in The Dimensions of Parking lFihh Editiord Washington, DC: Urban
Land Institute, 2010.
2. Chrest, Anthony, Mary Smith, et al. Parking Structures, Third Edition. Boston: Kluwer, 2001
3. Parking Consultants Council Guidelines for Parking Geometries, Washington DC. National Parking Association, 2011
However, considering the various site constraints the proposed garage has to meet while
maintaining a minimum parking counting, we are proposing to use 8'-61 ' wide stalls, in lieu of
9'-0" wide, with a 61'-0" parking module, which results in a LOS B. By implementing these
measures, the structure will be shorter by 9'-0" in the east-west direction and by 21 -10" in the
north-south direction. The smaller footprint structure snug-fits on the site in a way that is
acceptable to all the stakeholders, i.e. Public Works, Bureau of Reclamation, and Recreation
District.
To summarize, the parking garage will have a 61'-6" parking model with 26'-0" drive aisles and
8 1 -6" by 17'-9" stalls.
MAIN ENTRANCE OF BUILDINGS (EVDC SECTION 4.4.D.2.A)
The Design Team has carefully considered the design intent of Section 4.4.d.2.a. of the Code
with regard to entrance facing the street or highway. The urban design intent of this
development is to create street frontage and gateway to the community, in accordance with
design intentions of the Commercial Downtown District. The entrance to the structure will be
highly visible from the street (Highway 36) and the East and South Facades are to be positioned
to enhance the Gateway entrance quality to the community of Estes Park. The South Facade,
facing the street will be treated as celebrated entrance way, with flags and flowers, framing
the arrival of guests.
Page 3 of 3
STATEMENT OF INTENT
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE PARKING CONSLCAN1S .44Hrsw# WALKER
Ear----121 JUNE 24, 2015
STATEMENT OF INTENT JUN 2 I,
DESCRIPTION „
The need for the proposed Estes Park Transit Facility Parking Structure was identified in the-E
Valley Transportation Alternatives Study, by Felsburg Holt & Ullevig, published in 2013. This Study
identified the need for an additional 525 new parking spaces to serve the needs of Estes Park in
2020 due to increased visitation to Rocky Mountain National Park.
The proposed parking structure will be located across the river from the existing Visitor Center
and will provide an improved visitor experience by providing a total of 410 parking spaces, 258
of which will be covered.
An initial phase of the project with 110 new spaces on two levels is currently funded, and two
additional levels will be possible if more funding becomes available. A total of 308 new parking
spaces could be achieved in a future four-level structure. The first phase, a two-level design, will
result in an upper deck approximately level with U,S. 36 adjacent to the structure. When the full
four-level structure is funded, the height above the level of U.S. 36 will be similar to that of a two-
story home. View corridors to the Continental Divide, Lumpy Ridge and the Stanley Hotel will be
maintained except for a momentary lapse in view for westbound motorists as they pass the
structure on U.S. 36.
Page 1 of /
General Information
Project Name
Project Description
Project Address
Legal Description
Parcel ID #
Site Information
3 Well X None
3 Well E None
X EPSD
EPSD
7 Yes
E Other
Other (specify)
Other (specify)
UTSD
UTSD
K No
X None
• Septic r- None
▪ Septic
Proposed Zoning CD
ESTES VALLEY
DEVELOPMENT REVIEW APPLICATION
Submittal Date:
Type of Application
Development Plan r Boundary Line Adjustment Condominium Map
r Special Review I— ROW or Easement Vacation r - Preliminary Map
Rezoning Petition
Preliminary Subdivision Plat
Final Subdivision Plat
f— Street Name Change
r Time Extension
r Other: Please specify
r Su
FinaMaR
r t,91r
I
Minor Subdivision Plat
r Amended Plat
JUN 2 it 7niq
J
Estes Park Transit Facility Parking Structure
New Parking Structure to support the Visitor Center
500 Big Thompson Ave, Estes Park, CO 80517
Lot 1, Visitor Center Sub EPK (2050036687) Less Portion in Tax District 3300
25302-84-901
Lot Size 5.442 Acres + BoR Land Area of Disturbance in Acres 2.57
Existing Land Use
Proposed Land Use
Existing Water Service r Town
Proposed Water Service
X Town
Existing Sanitary Sewer Service
Proposed Sanitary Sewer Service
Is a sewer lift station required?
Existing Gas Service E Xcel
Existing Zoning CD/Federal Land
Surface Parking Lot
Parking Structure
Site Access (if not on public street)
Are there wetlands on the site?
US 36
X Yes r No
Site staking must be completed at the time application is submitted. Complete? X Yes r No
Primary Contact Information
Name of Primary Contact Person Ginny Gerhart McFarland, AIA, LEEP AP, NCARB
Complete Mailing Address PO Box 1645, Estes Park, CO 80517
Primary Contact Person is r Owner Applicant E Consultant/Engineer
Attachments
3 Application fee Requested waived, pending response Alison Chilcott
jr( Statement of intent
X 3 copies (folded) of plat or plan
tir 1 1 " X 17" reduced copy of plat or plan
Please review the Estes Valley Development Code Appendix B for additional submittal requirements, which
may include ISO calculations, drainage report, traffic impact analysis, geologic hazard mitigation report,
wildfire hazard mitigation report, wetlands report, and/or other additional information.
Town of Estes Park -G., P.O. Boy 1200 •G‘, 170 MacGregor Avenue -G.. Estes Park. CO 80517
Communjiy Development Deportmeni Phone: 1970) 577-3721 -e. Fax: 1970) 586-0249 - www.estes org/ComDev
Revised 2011,11.16 KT
Signatures:
Record Owner Owner
Contact Information
Record Owner(s) Town of Estes Park
Mailing Address Town Hall, 170 MacGregor Avenue, Estes Park, CO 80517
Phone 970-586-5331
Cell Phone N/A
Fax
Email townadmin@estes.org
Applicant Ginny Gerhart McFarland, AIA, LEEP AP, NCARB
Mailing Address PO Box 1645, Estes Park, CO 80517
Phone 303-731-3750
Cell Phone 303-731-3751
Fax
Email ginny@spaceintoplace.corn
Consultant/EngineerWalker Parking Consultants, Contact: Anirudh A. Chopde
Mailing Address 5350 S. Roslyn Street, Ste 220, Greenwood Village, CO 80111
Phone 303-694-6622
Cell Phone 813-482-2192
Fax 303-694-6667
Email anirudh,chopde@walkerparking.com
APPLICATION FEES
For development within the Estes Valley Planning Area, both inside and outside Town limits
See the fee schedule included in your application packet or view the fee schedule online at:
www.estes.orq/ComDev/Schedules&Fees/PlanninqApplscationFeeSchedule.pdt
All requests for refunds must be made in writing. All fees are due at the time of submittal.
MINERAL RIGHT CERTIFICATION
Article 65.5 of Title 24 of the Colorado Revised Statutes requires applicants for Development Plans, Special Reviews,
Rezoning, Preliminary and Final Subdivision Plats, Minor Subdivision Plats if creating a new lot, and Preliminary and Final
Condominium Maps to provide notice of the application and initial public hearing to all mineral estate owners where the surface
estate and the mineral estate have been severed. This notice must be given 30 days prior to the first hearing on an application
for development and meet the statutory requirements.
I hereby certify that the provisions of Section 24-65.5-103 CRS have been met.
Names:
Record Owner PLEASE PRINT: 1 -
Applicant PLEASE PRINT Z;11-41-1T
Date c I
Date
Revised 2011.11.16 KT
APPLICANT CERTIFICATION
10. I hereby certify that the information and exhibits herewith submitted are true and correct to the best of my knowledge
and that in filing the application I am acting with the knowledge and consent of the owners of the property.
IP In submitting the application materials and signing this application agreement, I acknowledge and agree that the
application is subject to the applicable processing and public hearing requirements set forth in the Estes Valley
Development Code (EVDC).
I10.- 1 acknowledge that I have obtained or have access to the EVDC, and that, prior to filing this application, I have had the
opportunity to consult the relevant provisions governing the processing of and decision on the application.
The Estes Valley Development Code is available online at:
httpa/www.estes.orolComDev/DevCode
111. I understand that acceptance of this application by the Town of Estes Park for filing and receipt of the application fee by
the Town does not necessarily mean that the application is complete under the applicable requirements of the EVDC,
10. I understand that this proposal may be delayed in processing by a month or more if the information provided is
incomplete, inaccurate, or submitted after the deadline date.
10. I understand that a resubmittal fee will be charged if my application is incomplete.
111. The Community Development Department will notify the applicant in writing of the date on which the application is
determined to be complete.
I. I grant permission for Town of Estes Park Employees and Planning Commissioners with proper identification access to
my property during the review of this application.
II. I acknowledge that I have received the Estes Valley Development Review Application Schedule and that failure to meet
the deadlines shown on said schedule may result in my application or the approval of my application becoming null and
void. I understand that full fees will be charged for the resubmittal of an application that has become null and void.
Names:
Record Owner PLEASE PRINT, 1--1 E. V -C4 A-P\tc- (.-t--tic
Applicant PLEASE PRINT. k
Signatures:
Record Owner`"--
2/1
Date
Applicant Date
Revised 20 1 .1 1 .1 6 KT
Created by Larimer County using data from
multiple sources. Larimer Count): makes no
esarrant,, as to the accuracy of this product.
map may not reflect recent updates prior to
date of printing.
ITTL
PRO:;PECT
MOUNT 427.,;
Visitor Center Transit Facility & Parking Structure
,c.je_cj 30 13
Owner Address City State Zip
ABUNDANT PROPERTIES OF THE ROCKIES LLC PMB 400-169 KERRVILLE TX 78028
ACHESON GERALD SHAW/MARY LYNNE 2300 W EISENHOWER BLVD LOVELAND CO 80537
ADAMS BRUCE G/KRISTIN J PO BOX 2825 ESTES PARK CO 80517
ALEXANDER ROBERT E/NANCY 242 CENTENNIAL DR ESTES PARK CO 80517
ANDERSON MARTHA D/EVERETT 1951 UPPER HIGH DR ESTES PARK CO 80517
ARCHDIOCESE OF DENVER 1300 S STEELE ST DENVER CO 80210
ARENTZEN ROLF F JR 137 STANLEY CIRCLE DR ESTES PARK CO 80517
BANK OF COLORADO 605 4TH ST FORT LUPTON CO 80621
BARLOW INC PO BOX 1116 ESTES PARK CO 80517
BARTLETT PATRICIA L /ROBERT 1506 SUNNYSLOPE DR CARROLLTON TX 75007
BENBROOK BRUCE T PO BOX 1008 WOODWARD OK 73802
BERGER JEFFREY W/TAMI M 13309 65TH ST NW WILLISTON ND 58801
BIEN GARY K/VICKI J 675 FREELAND CT ESTES PARK CO 80517
BOHLENDER LARRY L/KAREN G 1476 43RD AVE GREELEY CO 80634
BOYD HERBERT EUGENE 466 SKYLINE DR ESTES PARK CO 80517
BRECKENRIDGE ROBERT 9552 W HIGHWAY 14 BELLVUE CO 80512
BROWNFIELDS LEATHER SHOP INC PO BOX 250 ESTES PARK CO 80517
CAMPION CAROLYN A/FRAME JANET C 3805 VALLEY OAK DR LOVELAND CO 80538
CANDY LAND INVESTMENTS LLC PO BOX 270927 LITTLETON CO 80127
COMANCHE FORKS LLC PO BOX 270223 FORT COLLINS CO 80527
COOPER JOHN D/DONA R 838 PANORAMA CIR ESTES PARK CO 80517
COPE JAMES D/KATHERINE B 631 FINDLEY CT ESTES PARK CO 80517
DISCO DOG LAND CO 2898 S LAKERIDGE TRL BOULDER CO 80302
DIVERSIFIED HOLDINGS LLC PO BOX 355 HYGIENE CO 80533
DUELL JAMES L/LISA W 842 PANORAMA CIR ESTES PARK CO 80517
ELKHORN LLC PO BOX 173836 DENVER CO 80217
ERNST ROBERT/DIANE TRUST 147 STANLEY CIRCLE DR UNIT A ESTES PARK CO 80517
ESTES PARK LLC PO BOX 997 SNOQUALMIE WA 98065
ESTES PARK SANITATION PO BOX 722 ESTES PARK CO 80517
ESTES PARK VILLAGE GREENS HOA/STEPHENS GEORGE G/HAZEL D 5720 ARROWHEAD DR GREELEY CO 80634
ESTES VILLAGE PROPERTIES LTD PO BOX 4130 ESTES PARK CO 80517
ETCHCEPTIONAL 1 LLC 836 VISTA LN ESTES PARK CO 80517
FIRST NATIONAL BANK OF ESTES PARK PO BOX 2390 ESTES PARK CO 80517
PasViv,k) (r. 01 .1 I fV,-^3
Visitor Center Transit Facility & Parking Structure
FIXTER ROBERT H/CAROLE A PO BOX 1633 ESTES PARK CO 80517
FLATIRONS BANKING SOLUTIONS INC 401K 2030 MONIDA CT ESTES PARK CO 80517
FOWLER HAYWOOD CHERYL 5285 DIAMONDBACK DR LAS CRUCES NM 88011
FOX KEVIN R/BARBARA R /NAMUTH RONALD/PAIGE 1976 A ST LINCOLN NE 68502
GERON JOHN/MARY M/ JAMES M JR/ROSS MARY 4411 UNIVERSITY BLVD DALLAS TX 75205
GIBBS JOHN W/DORIS E 1836 GLEN GARRY DR LAKEWOOD CO 80215
GINTHER FREDERICK L/RITA B 3106 W EISENHOWER BLVD LOVELAND CO 80537
GREAT WESTERN BANK/FBO FUCHS OLIVER FAMILY 9290 W DODGE RD STE 401 OMAHA NE 68114
GREEN JIM B/MARY R 1715 GLACIER ST LARAMIE WY 82070
HABER ALEGRA M FAMILY TRUST 3208 ARDSLEY DR ORLANDO FL 32804
HAYEK EDWARD A/MARLENE A 611 FINDLEY CT ESTES PARK CO 80517
HAYES EUGENE W/DOLORES M 3 GLENKIRK LN SAINT LOUIS MO 63122
HEISER MATTHEW/TRESSELL SHELLIE PO BOX 3633 ESTES PARK CO 80517
HESS DONALD E 1484 CREEKSIDE CT ESTES PARK CO 80517
HILTNER ORIN K/CONNA L 464 SKYLINE DR ESTES PARK CO 80517
HIRSCHFIELD NANCY L 842 VISTA LN ESTES PARK CO 80517
HOFEMANN PAUL A/JOYCE A 13008 COUNTRY TRAILS LN AUSTIN TX 78732
HOFF BARRY J 2057 FOX MEADOW LN JOHNSTOWN CO 80534
HOLDT MARK L REVOCABLE TRUST 823 PANORAMA CIR ESTES PARK CO 80517
HOLLER MARK E/VICKY L PO BOX 303 ESTES PARK CO 80517
HOLLEY DONALD LEAGUE/MICHELE 680 HIGHLAND LN ESTES PARK CO 80517
HOLMES BRYON/DEBORAH 829 PANORAMA CIR ESTES PARK CO 80517
HORNBACHER SARA L 178 STANLEY CIRCLE DR ESTES PARK CO 80517
HOUSTON BENNETT R 434 KARSH DR LONGMONT CO 80501
HUGHEY IRA A/MARY F /LICKLIDER LINDA 905 COMPOUND ENID OK 73703
HUITT SHARON LOWTHER/CIANCONE KARYN 7423 GUINEVERE DR SUGAR LAND TX 77479
IMBACH-RINEHART KAROL J 7741 MONTECITO CT RANCHO CUCAMONGA CA 91730
JAENECKE RUSSELL E/CAROLE T 610 FINDLEY CT ESTES PARK CO 80517
JAROLIMEK TAMARA L/JAMES F PO BOX 3523 ESTES PARK CO 80517
JEREB RICHARD F II PO BOX 3473 ESTES PARK CO 80517
JOHNSON CANDACE/ZELL RODNEY 635 STEAMER DR UNIT A ESTES PARK CO 80517
JONES SHAUN T/JANET C 7580 LOST CREEK FLOWER MOUND TX 75022
JWC STANLEY HOLDING 333 WONDERVIEW AVE ESTES PARK CO 80517
KANE NICK AKA NICHOLAS PO BOX 1961 ESTES PARK CO 80517
Visitor Center Transit Facility & Parking Structure
KEIMIG GARY L/EILEEN L PO BOX 1014 ESTES PARK CO 80517
KEY SHARON B ./RANDALL 6755 COYOTE RIDGE CT UNIVERSITY PARK FL 34201
KING DAVID/SUSAN 134 STANLEY CIRCLE DR ESTES PARK CO 80517
KINGSWOOD MICHAEL R/CYNTHIA A 152 STANLEY CIRCLE DR ESTES PARK CO 80517
KIRKS FLYSHOP LLC PO BOX 1662 ESTES PARK CO 80517
KRALL RUSSELL G/DOLORES PO BOX 2242 ESTES PARK CO 80517
LEAGUE LARRY D/ALICE F 620 STEAMER DR ESTES PARK CO 80517
LEE GEORGE/MEI-CHI PO BOX 1973 ESTES PARK CO 80517
LEHMAN JAMES L/HENRIETTA 415 RIDGECREST CIR DENTON TX 76205
LEYMASTER KREG A/JANE A 5045 W COTTONWOOD COVE HASTINGS NE 68901
LININGER DINA G/SHERWIN M 174 STANLEY CIRCLE DR ESTES PARK CO 80517
LITTLE CURRENT CONSULTING LLC PO BOX 1379 LONGMONT CO 80502
LONGWELL VIRGINIA M/DANIEL A 650 HIGHLAND LN ESTES PARK CO 80517
MARGHEIM FREDERICK W/DOROTHY M 610 STEAMER DR ESTES PARK CO 80517
MARSHALL DONNIE K/JILL T PO BOX 2661 ESTES PARK CO 80517
MATTHEWS GARY/IRENE 139 STANLEY CIRCLE DR ESTES PARK CO 80517
MAXWELL LLOYD R/GAYLE PO BOX 1861 ESTES PARK CO 80517
MCKINNEY JOAN ELIZABETH REVOCABLE TRUST 155 STANLEY CIRCLE DR ESTES PARK CO 80517
MI CASA HOA/ETCHCEPTIONAL 1 LLC 836 VISTA LN ESTES PARK CO 80517
MI CASA HOMEOWNERS ASSOC 844 VISTA LN ESTES PARK CO 80517
MILBURN JOHN P/SARAH P 407 S MYRTLE ST GEORGETOWN TX 78626
MINDFUL SOLUTIONS LLC PO BOX 1592 ESTES PARK CO 80517
MOELLERS MARCIA R 447 SKYLINE DR ESTES PARK CO 80517
MOINAT DAVID H/HARRIET 148 STANLEY CIR DR ESTES PARK CO 80517
MONGE KAREN P 1397 GLACIER VIEW LN ESTES PARK CO 80517
MORANO JOLENE S 2220 LONG VIEW DR ESTES PARK CO 80517
MOUNTAINVIEW VACATIONS LLC 742 LAKEWOOD CT ESTES PARK CO 80517
MULHERN RICHARD E/ELIZABETH PO BOX 1569 ESTES PARK CO 80517
MURPHY BRIAN 3620 CAPULIN DR LOVELAND CO 80538
NEWENDORP PAUL D/DONNA L 625A STEAMER DR ESTES PARK CO 80517
PANORAMA LLC 1865 TWIN DR ESTES PARK CO 80517
PIKA PROPERTIES LLC PO BOX 1793 ESTES PARK CO 80517
POCHOP DIANA M DBA MYSTIC/MTN GALLERY PO BOX 58 ESTES PARK CO 80517
POST PROPERTIES LLC 6307 COUNTY ROAD 43 DEVILS G ESTES PARK CO 80517
Visitor Center Transit Facility & Parking Structure
PROSPECT INN LLC PO BOX 2128 ESTES PARK CO 80517
PROSPECT OF ESTES LLC 700 N SAINT VRAIN AVE ESTES PARK CO 80517
RACINE ANN PO BOX 1604 ESTES PARK CO 80517
RAHNE RANDAL R/HUGHES BEVERLY 8253 UTE HWY LONGMONT CO 80503
RAY ALICE CLAIRE 2461 ARAPAHO RD ESTES PARK CO 80517
RENO CHARLES S 21021 SHACKLEFORD HUNTINGTON BEACH CA 92646
RETRUM WILLIAM S 650 FREELAND CT ESTES PARK CO 80517
REVELEY CHRISTOPHER G/FINLEY ANN 665 FREELAND CT ESTES PARK CO 80517
RICCIARDI ANTHONY F/KATHY 837 PANORAMA CIR ESTES PARK CO 80517
RICHARDSON GLENN.ROBERTA/TIMERLINE TRUST 37146 DICKERSON CT SEVERANCE CO 80550
RILEY QUEST LLC 15446 STEVENS PLZ OMAHA NE 68137
RISSMILLER MARK D/JEAN P PO BOX 948 MCKINNEY TX 75070
RKEP LLC 175 REDROCK RD SEDONA AZ 86351
ROCKY MOUNTAIN PARK INN LLC PO BOX 29041 PHOENIX AZ 85038
ROSA DUANE J/LYNN C 6804 BENT OAK DR AMARILLO TX 79124
SAEMISCH RHONDA M/TODD 30 MANZANITA LITTLETON CO 80127
SAFEWAY STORES 46 INC 1371 OAKLAND BLVD STE 200 WALNUT CREEK CA 94596
SAHM RAYMOND C/LUZIA M 700 HIGHLAND LN ESTES PARK CO 80517
SAINT LARRY L/CAMILLA R PO BOX 3338 ESTES PARK CO 80517
SALASEK JOSEPH K/DEANNA 28553 KELSEY PT LAKE BARRINGTON IL 60010
SAXTON CHARLES 1738 FRANKLIN ST UNIT 1-B DENVER CO 80218
SCHMIDT DONALD L/RENA B 18804 N DIAMOND DR SURPRISE AZ 85374
SCHRADER LAND CO LLLP 320 N COLLEGE AVE FORT COLLINS CO 80524
SHIPMAN ROBERT L/JUDITH A 531 HIGHLAND LN ESTES PARK CO 80517
SIECK AND FIND LLC 812 BIRCHWOOD CIR COUNCIL BLUFFS IA 51503
SILAR DONALD F/DEBORAH D 5220 GRIFFITH DR FORT COLLINS CO 80525
SINDELAR JEFFEREY A 356 E ELKHORN AVE UNIT 3 ESTES PARK CO 80517
SMALL MARJORIE L PO BOX 4649 ESTES PARK CO 80517
SMITH CHRISTINE R 620 FINDLEY CT ESTES PARK CO 80517
SMS FINANCIAL XXIII LLC 6829 N 12TH ST PHOENIX AZ 85014
SNOWDEN MARY ANN 395 PARK VIEW LN ESTES PARK CO 80517
SOLIDAY STEVEN L/KATHRYN K 827 PANORAMA CIR ESTES PARK CO 80517
SPALDING WILLIAM J/ELIZABETH J 355 PARKVIEW LN ESTES PARK CO 80517
SPEAR FAMILY TRUST 5495 US HIGHWAY 36 ESTES PARK CO 80517
Visitor Center Transit Facility & Parking Structure
STANDSTEDT PHYLLIS M 1528 64TH AVE CT GREELEY CO 80634
STANLEY HILLS ASSN PO BOX 3344 ESTES PARK CO 80517
STANLEY VIEWS HOA/HAYEK EDWARD/MARLENE 611 FINDLEY CT ESTES PARK CO 80517
STANLEY VILLAGE SHOPPING CENTER LLC 1130 38TH AVE STE B GREELEY CO 80634
STANLEY WELLNESS CENTER LLC 333 E WONDERVIEW AVE ESTES PARK CO 80517
STARK GARY R/LYNNE M 164 STANLEY CIRCLE DR ESTES PARK CO 80517
STARR P CHARLES P/DARLA L REV TRUST 14505 S 158TH BENNET NE 68317
STATE OF COLO HIGHWAY DEPT 1313 SHERMAN ST DENVER CO 80203
STEIN KENNETH A/BEVERLY 203 LEISURE LAKE RD DONIPHAN NE 68832
STEPHENS GEORGE G/HAZEL D 5720 ARROWHEAD DR GREELEY CO 80634
STEVENSON JERRY L/PATRICIA J 950 VISTA LN ESTES PARK CO 80517
SWEARINGEN JAMES P /CHRISTOPHER W/ANN 3781 W 101ST AVE WESTMINSTER CO 80031
SWIFT BRADLEY DAVID 1939 12TH AVE GREELEY CO 80631
TESAR VICKI PO BOX 421 ESTES PARK CO 80517
TESELLE LIVING TRUST 272 SOLOMON DR ESTES PARK CO 80517
THAPA ANITA PO BOX 1066 ESTES PARK CO 80517
THOMAS NANCY P TRUST 160 STANLEY CIR ESTES PARK CO 80517
THOMPSON ENTERPRISES LLC 401K PO BOX 4294 ESTES PARK CO 80517
THORP ROGER M/VERLENE G 1038 KIOWA RD LYONS CO 80540
TIMBERLINE TRUST 37146 DICKERSON CT SEVERANCE CO 80550
TORRICELLI MARK A/CHERYL JOAN 1303 INDIAN SPRINGS DR GLENDORA CA 91741
TOWN OF ESTES PARK PO BOX 1200 ESTES PARK CO 80517
TREAD LIGHTLY PROPERTIES LLC 300 J J KELLY RD LYONS CO 80540
UNITED STATES OF AMERICA GENERAL DELIVERY WASHINGTON DC 20090
UNITED STATES/ROCKY MTN NATL PARK 1311 S COLLEGE AVE FORT COLLINS CO 80524
UNITED STATES DEPT OF INTERIOR PO BOX 1366 FORT COLLINS CO 80522
UNITED VALLEY BANK PO BOX 1210 GYPSUM CO 81637
UNIVERSAL HARMONY LLC 114 TIMBER LN ESTES PARK CO 80517
VESTERMARK KEITHA R 149 STANLEY CIRCLE DR ESTES PARK CO 80517
WAPATI MOUNTAIN RLLP 20080 S 96TH ST HICKMAN NE 68372
WEST BERTHA MAE PO BOX 1336 ESTES PARK CO 80517
WEST 0 FEDERAL LLC 151 WESTON LN ESTES PARK CO 80517
WICKS JOSEPH L JR PO BOX 3619 ESTES PARK CO 80517
WIESNER MARK L/JEAN K A 122 STANLEY CIRCLE DR ESTES PARK CO 80517
Visitor Center Transit Facility & Parking Structure
WILCOCKS ANN M/RONALD L 2711 SUNSET LN ESTES PARK CO 80517
WILLIAMS LLOYD T/AUGUSTA N PO BOX 12 VALE OR 97918
WINDY CITY LLP 3225 DEVILS GULCH RD ESTES PARK CO 80517
WITTE MARY KAY / PEARSON KENNETH/DOUGLAS 1471 29TH LN PUEBLO CO 81006
WOJCIK JULIAN/ELIZABETH 729 PINEWOOD DR LYONS CO 80540
ZELL RODNEY D/JOHNSON CANDACE S 635 STEAMER DR UNIT B ESTES PARK CO 80517
2ONNG. CD-COMMERCIAL DOWNTOWN
GROSS PROJECT AREA (INCLUDES PORTIONS OF MULTIPLE LOTS) 2,569 AC,111 904 S F
801 OF LAND UNDER EFFECTIVE FLOOD PLAIN_ 0203 AC413.829 S F
AREA IN PROPOSED RIGHTS-OFWAY DEDICATIONS_ ▪ ACIO SF
80% OF LAND ABOVE TOEP WATER SERVICE ELEVAT NI' DAGO S.F
I FAST AREA 1) ACID S.F
NET PROJECT AREA 2.367 AC,103.075 S F
NET SITE IMPROVEMENT PROJECT AREA 2202 AC,95,934 S F
GROSS FLOOR AREA
PROPOSED PAFtKWG STRUCTURE (2 LEVELS) 59.987 S F
FUTURE PARKING STRUCTURE (4 LEVELS) 126.6555E
FLOOR AREA RATIO
PROPOSED PARKING STRUCTURE (2 LEVELS). 054
FUTURE PARKING STRUCTURE (4 LEVELS) 1.13
LOT COVERAGE.
EXISTING LOTS, ROADWAYS. OTHER. 37.995 SF
PROPOSED PARKING STRUCTuRE. 33.387 S.F
TOTAL (SITE). 71.382 S.F
LOT COVERAGE RATIO. BA%
STRUCTURE HEIGHT RESTRICTIONS
30 FEET
STRUCTURE HEIGHT.
PROPOSED PARKING STRUCTURE (2 LEVELS)' PARKING STRUCTURE (TOP OF SPANDREL) 1T-2
STAIR CANOPY N/A
UGHT POLE 388"
FUTURE PARKING STRUCTURE (4 LEVELS) PARKING STRUCTURE (TOP OF SPANDREL) 317.-2-
STAR CANOPY 44'-R'
LIGHT POLE BU-6
PARKING SPACES PROVIDED
LEVELS
STANDARD
STALLS
CAR
ACCESSIBLE
VAN
ACCESS. F TOTAL
ENCLOSED
(COVERED)
UNENCLOSED
(UNCOVERED)
GROUND LEVEL 75 6 2 63 63 0
SECOND LEVEL Ti 0 C 77 77 0
TOTAL (PROPOSED STRUCTURE) 152 6 2 160 160 0
FUTURE LEVELS
SECOND LEVEL 24 0 0 24 24 0
THIRD LEVEL 101 0 0 101 78 23
TOP LEVEL 77 0 0 77 0 77
TOTAL (FUTURE STRUCTURE) 202 0 0 202 102 100
SURFACE LOT STALLS 48 2 10 52 52
GRABS TOTAL AT BUILD OUT 403 5 3 414 262 IS,
PARKING/ADA REQUIREMENT ANALYSIS
1 SHE ADA PARKING REQUIREMENTS ARE DERIVED FROM THE 2010 ADA STANDARDS TOR ACCESS BLEIDESIGN.
SECTION 2082 THE SITE SURFACE PARKING IS CONSIDERED A PARKING FACLITY AND THE PARKING
STRUCTURE IS CONSIDERED A PARKING FACILITY. EACH WITH THEIR OWN PARKING REQUIREMENTS.
2 THE SURFACE PARKING WITH 154) TOTAL STALLS REQUIRES (2) CAR ADA STALLS AND 11) VAN ADA STALL THE
PARKING STRUCTURE. AT BUILD OUT, WILL HAVE A TOTAL OF 1366) STALLS: REQUIRING (8) CAR ADA STALLS
AND (2) IAN ADA STALLS
PLANNING COMMISSION CERTIFICATE:
APPROVED AND ACCEPTED BY THE ESTES VALLEY PLANNING COMMISSION ON THIS
DAY OF
20
PLANNING COMMISSION CHAIR ATTEST
SHEET INDEX
COVER SHEET
2 SURVEY PLAN
3 PROPOSED SITE PLAN
• FIRE ACCESS PLAN
5 GROUND LEVEL RAN
8 TOP LEVEL PLAN
7 SECOND AND THIRD LEVEL PLANS . FUTURE
• TOP LEVEL PLAN - FUTURE
9 GRADING PLAN
10 UTILITY PLAN
11 LIGHT SPILL PHOTOMETRIC PLAN
12 PARKING STRUCTURE PHOTOMETRIC FLANS
13 LANDSCAPE PLAN
14 PLANTING DETAILS
15 ARCHITECTURAL ELEVATIONS
16 ARCHITECTURAL ELEVATIONS
17 ARCHITECTURAL ELEVATORS. FUTURE
15 ARCHITECTURAL ELEVATIONS • FUTURE
15 PHOTO SIMULATION - EAST VIEW
20 PHOTO SIMULATION - FUTURE EAST VIEW
21 PHOTO SIMULATION - WEST VIEW
22 PHOTO SIMULATION - FUTURE WEST MEW
23 PHOTO SIMULATION - NORTH VIEW
24 PHOTO SIMULATION - FUTURE NORTH VIEW
25 PHOTO SIMULATION - STAIR ENTRY VIEW
26 PHOTO SIMULATION . FUTURE STAIR ENTRY VIEW
I Town of Estes P.
AlMrrtbn. Grepay P MALonen P E
Putac Works D.C.
[13
•
17D MacGregor Avenue
PO BoR12W
ESTES PARA Eslas Park, 00 00517
COLORADO 970.577.35111
OWNER/APPLICANT
Gnny Gerhart McFarland RA. UEED AP. RCA%
SoaoantoP1ane I AD
P 0 Boa 1845
Estee Park CO 6051 r
303-731-3760
CONTACT PERSON
PRIME CONSULTANT AND
STRUCTURAL ENGINEER ARCHITECT
5350 S. Rcelyn Street
Stole 220
Gnsenwood Wham.
CO 60111
503 694 6922 FT
303 094 0667 f
Contact Dab Stariey
IhAchaal Nash. M56 PC
711871.51larahlYetomse
725 LahaallaSIrtat
Dower. CO, BOOR
30&780.7880
CIVIL ENGINEER MEP ENGINEER
YAN HORN ENGINEERING AND SURVEYING
013 MIX RC • Hens O- 00.03
1••••• au-smt • r. NA) am-oral
SSG -
-7.MEP
SSG MEP. Inc.
VICINITY MAP
SCALE" - 500
'Sow PARKING CONSULTANTS
WALKER
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
GENERAL NOTES:
CERTIFICATION AND APPROVAL:
1 ALL REQUIRED IMPROVEMENTS SHALL SE COMPLETED OR GUARANTEED PRIOR TO THE
ISSUANCE OF A CERTIFICATE OF OCCUPANCY
2 THE OWNER SHAil BE REOUIRED TO PROVIDE FOR HANDICAP ACCESSIBILITY IN ACCORDANCE
PATH THE ADA AND I.B.C.
3 APPROVAL Of THIS PLAN CREATES A VESTED PROPERTY RIGHT PURSUANT TO ARTICLE 58 OF
TITLE 24. C.R.S.. AS AMENDED.
THE UNDERSIGNED. BEING THE OWNERS, 00 HEREBY AGREE THAT THE REAL PROPERTY AS DESCRIBED
IN THE APPLICATION FOR DEVELOPMENT PLAN REVIEW FILED HER EVATH. AND AS SHOWN ON THIS SITE
PLAN SHALL BE SUBJECT TO THE PROVISIONS OF TITLE 17 OF THE MUNICIPAL CODE OF THE TOWN OF
ESTES PARK. COLORADO AND ANY OTHER ORDINANCES OF THE TOWN OF ESTES PARK. COLORADO
PERTAINING THERETO.
STATISTICAL DATA:
TOWN OF ESTES PARK
WILLIAM P1NKHAM. MAYOR
3025 5 Pater Read. Sum I 1011
Aurora. CO 80014-2950
101 08.1601 ha 303.04.0812
me-Rd saroupriccon
COVER SHEET - SHEET 1
ISSUE DATE: 08-11-2015
Copyright 2013. All rights reserved. No port of this document moy be reproduced in any form or by any means .ithout permiss:on from Wolker Parking Consultants/Engineers, Inc
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LEGEND
M ELECTRIC PEDESTALNAULT (SOTS yairi)
ORR POLE
:71 NecATION BOY
0 SEWER 0N41.0LE
STORM SEWER MANHOLE
O 007470.5107 BORE ODLE WARM*
NAFER 0411 4412.E61570*
ElowED 1101061 p7960O1/TNER
001145 (PRPA)--.357114
el ED 11001 op.* (70.47-1035004
EFT'ECTNE IX ANN. 01X090-ELOODWAT
EPICENE IS ANNUAL GN0N1E-11.00001101
••••••• EFFEC714 0.2% APNEA. ENNAX F1000P.04
fw.71- LISTING DECIDUOUS
FINCE-CTISTING
BOLDING SETBACK
NONFAT (AS ACHED)
[15110 5' COMMA ROMs
1010000 I' CONNOR INTERYN.
ROAD aR NON
pRop70y urrt
PkopERTY LIRE
APPRox my.. NCH RATER MARK
0 rams INARNATM IS NOTED
04100 WOUND OR ...NED 0410 9 01174
(00.00 PLATTED OR ram 041604S415
EXISTING EVERGREEN
00G
SAC DISPENSER
01-195.9.961
=96g;
(GM..
(1W) p
SURVEY PLAN - SHEET 2
ISSUE DATE: 08-11-2015
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
BIG THOMPSON RIVER
21 •
16 .13
SCALE - 20,f
fttVEY
0101
„om9S,
J OT t
S6Lsi rp - "mull
IROP/ISION.
ZONED CD
IC.
WIN=
PLATTO
L.I
M
TISTY
(UM
1
1301
cp
- 73 1109
.1
2 .. -..„.....-....-;•....-......,--. .7.-z•
ERmwm•EN.•6•1.8m8•%Rnm..•••••••=1•N
mAIINEMINNIMEradmpfs'....•7-i7.-....,..--
..
geimp-: { 1 Iii s___6-4.''...-.".......ok,••,..• •••• SPI all, .-• ".-- -- - .
1 ---- ---- i i.:••••'-
" • 47 •
- -----
.....
.5____s ___.-- a
..- _---- _.(67--
,.' -... • s. • P, . -
..• -
,-- .....010.... ..... .... ,...---
MOOR
--- SA: _MY ______ IPAI
_.-Ar. NA 1705.7414.28 (MINED)
..
;
.
11.
,2.
7
2
:9176
.
Roa ocy.35C0.55
,77
&
----,__ $ RR .".....;
"
....*
1 \
SEGE OF
NON LAO
FOR GOLF
CAROM
SAISTINO 0D Me
4.00.7
13017071 0010
. •
0
LOT 3
/STANLEY MFADOALS
ADDITION
ZONING N/A
r
(NA
.,,p400000E
kr,ii WATER
Y 20151
FROM ROA.
IMAGE-NOT
L
GOLIINS
ON THE GOLF
CORPSE- SGM
FOR GOLF
GORSE
PARNK SRAM 58-75
WAY ONLY
RON AND P0S7
AOrEt ROSE
esrer 71100
SIGN wel) P461 -
Jar
Leak
rrE
PARNICV"S
448.4419NWA OeyA•PT1uTj 111
ORATE 7970.
.)50199
-7502.59
posanar
(.561.1411 TurEry
7
0.24'
INVELED
WAY
U.S. 36 A-0
(MT) SURVEYOR'* NOTO-S•
11446 SITE PIAN 6 REPRIMORATNNAL DM? MD I NOT TO SE RUED UPON IS A 60AN0ARY SURREY
ND. RAPROVENENT SUNS,
2. CONON. NOAH ARE AT A I' IMIONAL ANO IRE EASED wail or LOCAL GON11104. moos Noon. 67 CCM *RAE R
7E01o0 (/4 RES. w/PLASTO CAP 2604) ESTAOLNED FOR 11.1 40041I04 O< THS SITE RIJN. MS ON E.1.7518
T
0T
CONTRC4. was N10 TO THE Row. RIANCAN OATIN (..y0611) CAPS SURYET LIMING 04Y OUT-7510.3
NOS BENCINARK U.0567. HORIZONTAL GOORDNATES ARE SASED OFF Of MS GRYIROL POINT LII 338
(GOWNS., 0000110 NAN), Nu NOM OPS SUM, 119742 A 00501002 01610 PLANE Nonni (0504)
PROJECTION (AT 1.9041140), NE REANGS AND OINNOES SHOWN HeRfoo ARE 701140.
3. I317 FotioNwo saw. WERE LASED FOR LOT uNC AND EMMERT RESEARCH FOR MC CANTON OF
RFS ME PLAN 007011 CERN. SUENMAON LOT 1(0014 pwCfPflop NO. 2005-0936687). NAT OF
STNS. WEADOM AMMON TO OE TOWN OF ESTES PAN (13306 R. PAGE M. 11.14 40950,4 PLAT OF
LITTLE PROSPECT 100401.4 AMMAN TO IFE TOM Of ESTES PAN (13000 5. P1.00 39. 91.14 02910-1 AND
CONSTRUCTION 00400405 OF ME ENSTING PAIRD40 LOT- TIC *NCR EASAIDAT CO LOT uof NODAL. 025
TO RAN NORM ENGINEERING MO RAWL-ONG.
4. LINTS OF THE EITEGTNE ROMP.. 80071004E5 00 SHOW HEREON ARE FROM A MST FR couomoo. 0.911o. of OAR PANEL 10947 ONG :001007
LAVES COSTING ROADS AND ,EUESTRON WEDGES AS 00710449 041 NF FAN 1.4 COMANSON ANN 714E %AMID =AT.. N 7146 REED OF sae rodtPts.
SOME DISCRENNICIES WERE NOTICE 0in4 GNOMICAL USAINN Of NE AwooPLAN/FLDERNAT 00.00.043 orD SASE FLOOD ELEVATIONS 114 OCNPA.SON
91770 THE S.W.) 71Ev4471015 of 414E 9.4NO0 PRON.. ON * LSE. DUE TO THE UM HONG CREATED MOO TO THE PANONG LOT FIEING
10617174:00, NO MENAI NAS WADE 00 REICALA EI0S CISGREPANCy 01 USE OF MONAULIC INGE.* on orNER fl000pLool DELNEATIoN wows. NE
GRANIGAL LOCAROM OF 112 uNIM AS SKAATI 014 THE row 204 111 0011.1 NON HEIR FIN 100 OnFATCH or rws slt PLAN.
5. onurr Local-Alms wow( HEREON AM PROw L0CA115 AND 1410040 PROM. BY NAISIOOS UTILITY ACE1IC100. ter taxless 0, DM; MFRS
HEREON NIO.D BC GOMSDERED APPROELLIDE ANO ME 10 DE YEN= IN NE FIELD PAN. TO CO1STAvG11001.
NINA LANDSCAPNG .1116104 (FLowl. 0003/040nADDAL 81.151405) ARE NOT SINN.
1, SPANNER HEADS NNE N07 LOWED FOR II* 010.471011 OF 714 5 SITE PLAN. 'OSELE INARATIGN 001,70101 saws 965/1 L4 0100 MD ME NONA HEREON IRRIGATION LAVES WERE 1101 LOWED AND
SASSEED AS A PART 0, THE FIELD EFFORT FOR RI CREATION OF nfo MN
0. Ala oras ANp or. SHOWN 1171170N 5 SINENAD 'ETRE 2 CRIREI APO GUTTEN (2' .OM) woo NE ExcEPTIoN 01 111100.-Ordi -CLOS LOCATED NOAS PAN.1140 SPACES 27-44 (AS view FOR ors brE RAAN 91I1;I4
ILLS A TOTAL NIGH OF 1.3'. 9001146 10017104,15 WERE SURVEYED IN NE ROA MOTHS NO LOADITVERIA EAMES 04 EMIR. GONDRIE 01.460415 RANT 106733 THE RTC
W OEM FOE A
Mt RENNIN?, 911 OUDA1310,S1
-____ ...._,...
--.--_
6 moor erre mg.= -.......
01111100.10) 11RAAN40;"a4"--
----ERNA WAN LOPATIX IT 0 NOT FRO, A
PANTED LOCATE
ON 714E MAINS
7518
SOU.
Air
Copyright 2015. Alt rights reserved. No part of this document may be reproduced in any form or by any means without permission from Welker Parking Consultants/Engineers, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LEGEND:
NOT BITUMINOUS PAVEMENT
(237 TONS TOTAL)
CONCRETE SIDEWALK
(1.110 SY TOTAL)
ratitzq 0....V1181
COMMERCIAL GRADE TDRESTONE
PERMEABLE PAVERS
(6,500 SF TOTAL)
TOWN PROPERTY
U.S.S.R-PROPERTY
REMOVE AND REPLACE
EXISTING RETAINING WALL
TO CONFORM WITH
PARKING STRUCTURE ,•••
LAYOUT
MATCH EXISTING
ROADWAY
LANDSCAPE
ELAND
ROADSIDE LIGHT POLES
AND PLANTERS. TYPICAL
;ROW
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
PARKS
BUILDING
SCALE. I. = 3)T43.
TO1414 P9IP
L1.5".
P
LOT I
VISITOR CENTER SUBDIVISION
ZONING: Cb
OWNER: TOWN OF ESTES PARK
...•••••
EXISTING
PEDESTRIAN
BRIDGE
NET-l'tor+
imG -0-04's
NEW WATER _
OUALITy.. Keg:
..,
I • -IC
.... o in .... to ...." z
0.
-0 0
..),
..- O -
/APPROXIMATE —
33 1,
0 li
WATER (MAY 201 S)
\
•••• \
tit .6 ......-' - '- ...".. ANNUAL NIGH
0.
\
3 ...,....I' .. , ,•'.-
l '' -, '..1•:2. -./ .I
.„ PLANTERD BE t4 ir'S45
SO. VI .....--''.
INA°
EXISTING VAG
PEDESTRIAN
BRIDGE IC7-0' -
RIVER
COMMERCIAL GRADE
TURFS PERMEABLE SETBACK
PAVERS FOR LOW-ROY
AND FIRE TRUCK ACCESS
)
--
LOT 3
STANLEY MEADOWS ADDITION
ZONING: N/A
OWNER U. S. D. R.
TREES
7TH TO REMAIN
GREEN PLANTER BASE WITH 2-RAIL. DOWEL i
PLANTERS, TYPICAL FENCE
NEW ARE
HYDRANT
• TONGA/
• 1725,0, LANDSCAPE
\ BUFFER BETWEENEC>v— EXISTING TREES
TRAIL AND FUTua TO REMAIN
\ CART PATH
PROPOSED SIDEWALK
MATCH
EXISTING
SIDEWALK
- PROPOSED MOUNTABLE
DRIVEWAY CURB RELOCAT
• LIGHTpat
•
REPAVE SURFACE
OT AS REQUIRED.
REMOVE AND
PAVE OVER
EXISTING
LANDSCAPE '
PROPOSED
FOUR LEVEL
PARKING
STRUCTURE
/13,0- WIDE FUTURE
CART PATH
- -
-TUTOR EXISTING
2-RA1L DOWEL FENCE
8-IT WIDE) REALIGNED
ROADWAY
EXISTING
SHELTER
MAINTENANCE
AND. FIRE
ACCESS GATE
LOT 44
LITTLE PROSPECT
MOUNTAIN AOO1TION
ZONING: CO
EXISTING 101 PARKING
STALLS TO REMAIN
REMOVE AND PAVE OVER
EXISTING LANDSCAPE ISLAND pERTT.
LANDSCAPE
TERRACE WALL.
TYPICAL
ASPHALT APRON FOR
LOW-BOY AND FIRE
TRUCK ACCESS
RELOCATED
LIGHT POLE -
PROPOSED SITE PLAN - SHEET 3
ISSUE DATE: 08-11-2015
US 36
(10V ROW)
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE Copyright 2015. Alf rights reserved. No part of this document may be reproduced in on y form or by any means without permission tram Walker Parking COnSuIT0n)5/EngirleerS.
0 30'
SCALE 1, sp. 0.
EXISTING WATER
LINES
1
n
EXISTING WATER
LINE
v— NEW r DIP
70
TOWN PROPERTY
FIRE TRUCK
FEET
wiDTN 8,6"
TRACK
LOCK TO LOCK TIME eD SECONDS
STEERING ANGLE 37 S. R153,0"
TYPICAL
FIRE ACCESS GATE INUN ---
PERMANENT SIGNAGE READING
`EMERGENCY ACCEDE ONLY
NO PARKING FIRE LANE' ON BONI
SIDES OF GATE
ASPHALT APRON FOR
FIRE TRUCK ACCESS
US 36
(100' ROW)
NEW w. DIP \
—NEW HYDRANT II
ASSEMBLY AND
) VALVE
COMMERCIAL GRADE
TURFSTONE PERMEABLE
PAVERS FOR FIRE TRUCK
ACCESS
•-•"' .
PROPOSED MOUNTABLE
DRIVEWAY CURB FOR
ARE TRUCK ACCESS
2-RAL 00WEL
FENCE •
---- r - -
------ - _ -- - - -
/ ----- -
PERMANENT 110 PARKING
FIRE LANE* SIGNAGE ON
BOTH SIDES OF ROAD,
TYP.
w
• NO PUBLIC
ACCESS SIGN
\
PROPOSED 1, FOUR LEVEL
PARKING
TRUCTURE
— 1 , •
DRY STANDPIPE
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
FIRE ACCESS PLAN - SHEET 4
ISSUE DATE: 08-11-2015
Copyright 2015. All rights reserved. No port of this document moy be reproduced in any form or by ony means without permission from Walker Parking Consultants/Engineers. Inc ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE Copyright 2015. All rights reserved. No port of this document may be reproduced in ony form or by any means without permission from Walker Porking Consultants/Engineers. Inc.
EXISTING
PEDESTRTAN
BRIDGE
1004P PROPS
r7ktmElx6tArgRr).PeruRsSrOfiEl 4
PERMEABLE RAVERS TYPICAL '
•
ACCES
RAMP
LANDSCAPE
ISLAND NECHAELEC.
ROOM
U.S.B. R FiROPERTY
REMOVE AND REPLACE EXISTING
RETAINING WALL TO CONFORM WITH
PARKING STRUCTURE LAYOUT
REMOVE AND PAVE OVER EXISTING
LANDSCAPE ISLAND
pcR'EY
E
EXISTING 031
PARKING
STALLS TO
REMAIN
MATCH
EXISTING
CURB AND
GUTTER
MATCH EX STING
SIDEWALK
UINDSCAPE-1
TERRACE
WALL. TYPICAL
ASPHALT APRON FOR
LOW-BOY AND FIRE
TRUCK ACCESS - ROADSIDE LIGHT POLES
AND PLANTERS TYPICAL-
US 36
(100' ROW)
246,01
EXISTING TREES
TO REMAIN
0 rr
r
\0
.0o09-
PLANTER BED
COMMERCIAL GRADE
TURFSTCNE PERMEABLE
PAVERS FOR LOW-BOY
AND FIRE TRUCK ACCESS
ACCESSIBLE ROUTE
PROVIDSED SIDEWALK
BOLLARDS. TYPICAL
RELOCATED
i EXISTING LIGHT POLE
PEDESTRIAN
BRIDGE
MATCH
EXISTING
SIDEWALK EXISTING
SIDEWALK
AND RAMP SLOPE LP
I§ 1.0% .'.e
asouoi
17 SPACES 9#6,61 = 144%6
EXISTING TREES
TO REMAIN
EXISTING CURB
AND GUTTER T51"
REMAIN
BO WIDE FUTURE
CART PATH
6 6. \ 6,
16 /BO
25,01. LANDSCAPE
BUFFER BETWEEN
TRAIL AND FUTURE
CART PATH
6. b 6
16,06 16-01
PROPOSED TRAIL WITH
ATTACHED MOUNTABLE
DRIVEWAY CURB .00*
(7503.501
NO PUBLIC
ACCESS SIGN
_ _ ----
MATCH EXISTING
2-RAIL DOWEL FENCE
LANDSCAP
ISLAN
jr 4 SPACES @VS' 36-tr
EXISTING SURFACE
LOT
SPACES 9/ 724r.
11 SPACES a 4 .93 -W
RAMP U
10}6.1%
15 SPACE-SO Er-or .
1'6 b.4
8,
BP
4.
AC
. i
E
rS_0
3_
RAMP LIN MATCH
EXISTING
\t'°AbWAY
REALIGNED
ROADWAY .2,6' •
(7606.031
- - -
0.0.W1136 TRAIL TO
B47 WIDE MAIL Tit"-
27,0'
I NEW FIRE HYDRANT,
TYPICAL
rs!!!!
SCALE- 25-01
7TH
GREEN
NO PUBLI
ACCESS SIGN
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
_ -
Row
GROUND LEVEL PLAN - SHEET 5
ISSUE DATE: 08-11-2015
0
0
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
0 0 0
0 0 0 0
246-0*
20'
SCALE 1' • 20-0-
451-0. 21-0' 2T-0" 30,0' 45-0.
ROOF OVER
PLANTER
WALL MOUNTED
LICHT F ATURE.
TM.
spAcEs 4-6. • 204.-cr
2T-0-
1 )1
BOLLARDS,
TYPICAL
1
ow 4104',
45,0"
ROOF OVER
ENTRYNEXIT
1T-r
•13,6*
(7517.001
2714"
SLOPE UP
1%
17 SPACES a ow = 144'43'
k 2,0-
(7515.971
27,1'
\—ROOF OVER
ENTRYlEKIT
*POLES. — SIGNAGE
6 SPACES • = 61,0'
ROOF OVER
ENTRY RAMPD61
• • 12,0'
(7515.50)
1•13,11.Y '
(7517.001
e-,910
! ES ON .
-6 ir
_
@6.%
SP ACES 9 B'$ • 76-6-
Rb
TOP LEVEL
(SECOND LEVEL)
TOP LEVEL PLAN - SHEET 6
ISSUE DATE: 08-11-2015
Copyright 2015. A6 rights reserved. No port of this document moy be reproduced in any form or by any means without permission from Walker Parking Consultonts/EngineerS, Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
0
OF OVER
TRIPEXIT
-4A 0
NAGE
TEAS.
PICAL
0
OVER PIL'AefFER
SPSIGNAGE
-..,-...
BED
BOLLARDS.
I—I TY PICAL
- _.
I.i
I i
p , i z
1
111:11I
1111111i
d
mom [
1,,__.
1 '
i J._____
1 2. si.i.c..0 ro . zor-o• 1 1
SLOPE UP ..... i
424.44
(7628.02)
++28-0•
ak---
I 0 1.0%
FUTURE
.IT SPACES ay-8..144W FUTURE FUTURE
I /
(4526.501
2r-I• , Mir 1r 27-1'
,.// I CI
ti. RC
En
14
—=
a a
sh
II SPACES fp BI8 = 42-6- 6 SPACES G EAT • 51,0" 4,
;II
-•••1
1 , RAMP UT RAMP ON
234:6 424,64
15 SP
0 er
FUTU
Ij INT - I2T.i
EE 6 %
F
9 SP ES. E.6 4,11,6"
(TS20.52)
F UTU RE _,,,, IN...,..
(75.211-02)
FUTURE
i_L_____
i
_ __._
—If
_ _ 1 , II
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
0 0 0 0 0 0 0
45,0' 2T-0' 27,4T
RE-0'
NY-IT 2T4T
RooF OVER
PLANTER BED -- —F-FM— - - -1 '
• I
.
BOLLARDS,
TYPICAL
ROOF OVER
ENTRYIEXIT
SLOPE UP
I.0%
EXISTING
.12-2
gs15 STI
EXISTING
20 40'
SCALE 1' = 20-0-
ROOF OVER
ENTRY
4.1243.4
17517.021
EXISTING
REMOVE--,,
,,
,
EXISTING
SPANDREL 4, IF
PANEL
' *1244. I.r.
ITS1T.001 I
EXISTING '
I II
L
R
,
E4VEI5u
s
STIN
TYPIC:Ll
I I
r
11 SPACES ire 43-= 92-e-
RAMP U
CP S.
FUTI11
SPACES (1 =112-6-
L
RAMP, ON
E'Nfo (7515.500
ExISTING
0 0
FUTURE EXISTING
SECOND LEVEL-FUTURE
0 0 0 0 0 0 0 0
24E-0"
FuTuRE FUTURE
THIRD LEVEL - FUTURE
SECOND AND THIRD LEVEL PLANS - FUTURE - SHEET 7
ISSUE DATE: 08-11-2015
Copyright 2015. All rights reserved. No port of this document moy be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers. Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
0 20'
SCALE I' • 20,o-
0 0 0
0 0 0 0 0
2445.0"
4.7-06 27-0. 45'd 2r-o• 45.4r
BOLLARDS,
TyPICAL
4."-• 24 SPACES @ W-ir 204.0 .t.
-s,Ei. J
) --* - FIU-TU3S39"RWr-;
SLOPE UP
17 SPACEFUTUS42:11:.E.S. • 144L6
45. •24LET
F(7u5T-u3TRE.S° ' Ina, 274'
I
1 -- 17V,
„. ... 1.
POLES, —) LIG1iC el
CAL
5 SPACES eV • 51,0” 1.
*35,64
ON
..34,06 1 1 @ 5.1% t
17539.05)
FUTURE ' FUTURE
9 SPACES 0/ 8L6 • 75,6*
0537.551
FUTURE
i SPACES 0
.1.•
643..,r4) _ _ _
FUTURE
TOP LEVEL-FUTURE
(FOURTH LEVEL)
TOP LEVEL PLAN - FUTURE - SHEET 8
ISSUE DATE 08-11-2015
Copyright 2015 AN rights reserved. No part of this document may be reproduced in any form or by ony means without permission from Walker Parking Consultants/Engineers, ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
F•A''VERMC"'i
tlV
404:wee+ taw os.rro
skisniqc DECIDUOUS
EXISTING EVERGREEN
EXISTING DECIDUOUS
TO BE REMUYE12 )c• EXISTING EVERGREEN
TO DE REMOVED
• Oa nti.113
ow no
"
I/O• 1/0- worn
4
1
STANDARD TYPE 2 CURB
AND GUTTER SECTION GRADING PLAN - SHEET 9
ISSUE DATE: 08-11-2015
1' FOR OuTFLON LORD
TS'
GLeaLso com mic-noN)
9 2a 40
RR .
,or'e 1
1
1
1
1
1
1
1
1
1
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
aim
S1G IA-10050S R1NEIR.
TYPICAL INTERNAL/ENTRY DRIVEWAY CROSS—SECTION
TYPE 0 CURD
AND GLITTER
(WHERE- APRJCABLE)
IOU
20' MIN-ONE WAY
24' MIN-TWO WAY
VARIES
tars
watrI4v14L-U
TYPE 2 CURS
ANC GUTTER
(WHERE APRECASLE)
iF COMPACTED ASPHALT IN PLACE
e COMPACTED ADDREGATE ROAD ENSE WITH EINES,
COMPACTER1 WILL BE TO 055 OR SETTER
COMPACTED SUS RiisE krAirRAL, FREE OF
ORGANIC MATERIAL WOOF ROLL TESTED WITH COMPACTION TESTING PRIOR)
A.101.1"
zgy•ANG
7.1, -20151
AP(
o'se
z\c'
MSG
iG,ED
soe'r)`
1,1011.2
WORM PEOESTAVVAULT-TO SE AMOUR/
ELECT. PEOESTAIVAULT (MZES VARY)
UGIV POLE
RRTGAIRON 1164
SERER NANNCIE
STORM SEWER LONNOLE-NEW
VW. WREN luvalou-1U RE Firmo46
Cl/OR Rum uRE-NEW
WATER IR. LANE-EusoNc
sLARA Luw UNE-CHSRINC
BUR= ELEG1mC PRINARy ANo/DR
FIBER 051105 (HRA)-ERHURC
TIBER OFTIR (Evaig-f0151054
unicrivE-1l MICA. civRcY-auotmAs
ETFELIRVE-1t ANNUM 044125-CL0000URI
EFFECOVE-0.25 ANNUAL C•imuS FLOOOPLAN
m-0
untri 061£-TO OE MOVED
G=1 RR. SEWER-NLIR
GOATS Or CRSFURELLRcs.
o C FENCE NEW
EugmG Mum. RaLvem
THSTIRG CONTOUR WENN.
— WISH CONTOUR
ROC ON DAHE-PROPOSSO
NW OR ONIVE-ERSDNG
PALCDITY URE
WM% ANNUAL x054 wATEB mum
C voLNLI 61016.41+7 AS WED
00.00 rolEASIRED CN CALCULATED OINENsIoNs
(1X1.00)PLATTED OR 0£01£12 DINENSIONS
501
- _To --.P0_
DAIr _.141{
'"-"`!:
AuRSTIBIA
. ORO
usa:MY R.T
TV °LS"
__O. • .--051-2161
11.3
111
0
0
NEW MONT Assam., MO SALVE
PaRct-raSINC TO BE RUORED
BULLING SETS..
EASER,LNI (A5 NOTED)
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultonts/Engineers, Inc-
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
ELECTRIC NOTES:
1. INSTALLATION REQUIREMENTS FOR THE UNDERGROUND PRIMARY
CONDUITS HAVE NOT BEEN APPROVED BY ESTES PARK LIGHT &
POWER. CRITERIA SHOWN IS FOR COST ESTIMATE ONLY. ONCE
APPROVED CRITERIA IS CONFIRMED WITH ESTES PARK LIGHT G
POWER, THE DRAWINGS WILL 6E REVISED.
2. ALL UNDERGROUND CONDUITS SHALL BE INSTALLED AT A MINIMUM
OF 35- BELOW FINISHED GRADE.
3. THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH ESTES
PARE LIGHT IS POWER IEPLIT) REGARDING ACCESS AND WORK IN
THE UTILITY VAULT.
4. IN ALL EMPTYISPARE CONDUITS. PROVIDE AND INSTALL A
MINIMUM 700L8 PULL STRING IN EACH CONDUIT
EXISTING WATER
LINE WET TAP EXISTING MAIN WITH VALVE -
RP (HIGH HAZARD) BACKFLOW DEVICE
TO BE INSTALLED DOWNSTREAM OF
PROPOSED CONNECTION ABOVE
GRADE WITH FREEZE PROTECTION
REQUIRED
ELECTRIC KEYED NOTES
1 NEW UTILITY PAD MOUNTED 3-PHASE TRANSFORMER. NEW
TRANSFORMER SHALL BE PROVIDED AND INSTALLED BY
EPLP WITH THE ELECTRICAL CONTRACTOR INSTALLING THE
TRANSFORMER PAD. SIZE OF THE TRANSFORMER TO BE
DETERMINED BY EPLP AND THE ENGINEER DURING DESIGN.
SECONDARY OUTPUT OF THE TRANSFORMER SHALL BE
208/120V, 3-PHASE. 4 WIRE. FINAL LOCATION OF
TRANSFORMER TO BE COORDINATED WITH EPLP,
2 NEW UNDERGROUND ELECTRICAL PRIMARY CONDUITS
BETWEEN THE EXISTING ELECTRICAL VAULT AND 7HE NEW
UTILITY TRANSFORMER, THE ELECTRICAL CONTRACTOR
SHALL PROVIDE AND INSTALL (2)2 (7} 4- AND (2) G'SCH 40
PVC CONDUITS.
3. NEW UNDERGROUND ELECTRICAL SECONDARY CONDUITS
BETWEEN THE NEW UTILITY TRANSFORMER AND THE NEW
ELECTRICAL SERVICE FOR THE TRANSIT FACILITY. THE
ELECTRICAL CONTRACTOR SHALL PROVIDE AND INSTALL (2)
2 AND (2)4' SCR 40 PVC CONDUITS. WIRE INFORMATION
FOR THE ESTIMATED 400AMP SERVICE WILL RE PROVIDE ON
LATER SUBMISSIONS.
t.
EXISTING LIGHT POLE
TOWN PROPERTY
U.S.B.R PROPERTY
EXISTING WATER
LINES
(190*-4
-T044NO
1- p
sR,c'"
7-EXISTING
PEDESTRIAN
&RIDGE
BtG 1°9S°14 °jEll NEW NEW 30' ADS
EXISTING
ELECTRIC
LINE
EXISTING ELECTRIC
PEDESTALSIVAULTS
ILMIALLITYWNAOTETERS: MAIN LINES SHALL BE r (AS NOTED) DUCTILE IRON
PIPE CLASS 52 WITH BONDED JOINTS. FIRE HYDRANT ASSEMBLY'S
MAY USE A GT DUCTILE IRON PEE SO LONG AS THERE ARE NO TAPS
ONTO THE ASSEMBLY. THE ENTIRE WATERMAN EXTENSION
INCLUDING FIRE HYDRANT' ASSEMBLYS MUST BE RESTRAINED
USING MEGALUGS OR TIE-ROOS. GATE VALVES WITH THRUST
BLOCK WILL BE REQUIRED AT THE DEAD END OF BOTH ONES FOR
FUTURE CONNECTIONS.
2. ALL WATER MAIN LINES WILL BE CONSTRUCTED AND BURIED
ACCORDING TO THE TOWN OF ESTES PARK WATERMAN DESIGN
AND MATERIALS SPECIFICATIONS FOR WATERMAN EXTENSIONS.
THE TOWN N
COVERING.
WATER DEPARTMENT WILL NEED TO INSPECT ALL LINES
PRIOR
3. RP (HIGH HAZARD) BACKF LOW DEVICE WILL BE REQUIRED TO BE
INSTALLED ATTIRE CONNECTION POINT OF THE NEW WATER MARL
PRESSURE REDUCTION VALVE MAY BE REQUIRED UPSTREAM OF
THE BACKFLOW DEVICE. RP BACKFLOW DEVICES ARE REQUIRED
TO BE BETWEEN 12 AND GO. ABOVE GRACE. FREEZE PROTECTION
WILL BE NECESSARY. MAINTENANCE AND TESTING OF THE DEVICE
WILL BE THE RESPONSIBILITY OF THE TOW PUBLIC WORKS
DEPARTMENT.
4. 10' MINIMUM HORIZONTAL SEPARATION IS REQUIRED BETWEEN ALL
2-RAIL DOWEL STORM SEWER, SANITARY SEWER AND WATER MAIN ENCASEMENT
FENCE . OF THE UTPLITY MAINS WILL BE REQUIRED WHERE SEPARATION BLIP WIDE FUTURE REQUIREMENTS CANNOT BE MET.
___ _ 7-CART PATH 5.UTILITY LOCATIONS SHOWN HEREON ARE SCHEMATIC FROM UTILITY
LOCATES AND MAPPING PROVIDED BY INDIVIDUAL UTILITY
PROVIDERS. ACTUAL UTILITY LOCATIONS ARE TO BE VERIFIED IN THE
FIELD PRIOR TO COMMENCING CONSTRUCTION ON PROPOSED
UTILITY EXTENSIONS.
7TH
GREEN
IC LINE. SEE
KEYNOTE 7
PROPOSED SIDEWALK
EXISTING TREES
TO REMAIN
-EXISTING ELECTRIC
LINE SAND-OIL ARAT
OR EQUIVALflIT
EXISTIN
24' ADS
CULVER
(RENO
EXISTING SEWER MANHOLE
NEW ELECTRIC VAULT
EXISTING
PEDESTRIAN
BRIDGE
NEW WATER 3 .\
QUALITY POND
.—NEW IP DIP
EXISTING ELECTRICAL
-Le Rcp I VAULT ' . 5>•,,,..
I EXISTING 24' \ \N
I e% -
TRENCH ELLIPTICAL i
DRAIN I RCP CULVERT
RELOCATE
'''.•.
EXISTING
(REMOVE),
•-•
,
-• -1 u1:11.rr HOLE
/2
TYR ,
/
/ i
/ / ' ANEW B' DIP
..---"'
.....1-7--------7:-.
EXISTING
OISRT1NEMAING TREE
,
1
_••••• .
i
\
- --'• NEW HYORAN
II
T
\ VALVE
ASSEMBLY AND
\ .
E
-MECLANICAURECTRICAL
ROD f1
TOWN PROPERTY
f--
NEW ELECTRIC JUNCTION BOX
FOR ELECTRIC VEHICLE STATIONS
0
NEW 24' ACP
STORM SEWER
4h O
NEW SS MH.
TYPICAL
NEW ELECTRIC LINE.
SEE ELECTRIC
KEYNOTE 3
rowN
ROW ASPHALT APRON FOR
LOWBOY AND FIRE
TRUCK ACCESS
US 36 _
(10Cr ROW)
EXISTING
/ 24. RCP
CULVERT
EXISTING SEWER
MANHOLE
NEW ELECTRIC
VAULT
EXISTING FIBER
OPTIC LINE
RETA&SIDE LIGHT POLES
AND PLANTERS. TYPICAL.
EXISTING SEWER
MAIN LINE
EXISTING Ir
• PVC PIPE
(REMOVE)
_-5
EXISTING SEWER
MAIN UNE
NEW HYDRANT
ASSEMBLY AND
VALVE •
EXISTING ELECTRIC
PEDESTALIVAULT
• - - —
EXISTING
24' RCP
CULVERT
0 30'
SCALE:1'd 30,0'
UTILITY PLAN - SHEET 10
ISSUE DATE: 08-11-2015
Copyright 2015. All rights reserved. No port of this document moy be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers. Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE Copyright 2015. All rights reserved. No port or this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, inc
ll'AOMPS°14
_ /0_2
02
tL2 imAG1NARY UNE
USES AS LIMITS
ku OF LIGHT SPILL
ANALYSIS
— /0.2
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO NOTES:
I. LIGHTING TO COMPLY WITH SECTION 7.9 OF THE ESTES VALLEY
DEVELOPMENT CODE.
2. LIGHTING WILL BE EITHER ACTIVATED BY MOTION SENSOR
DEVICES OR TURNED OFF DURING NON-OPERATING HOURS.
S. OPERATING HOURS TO BE DEFINED IN CONSTRUCTION DOCUMENTS.
4. SINCE THE PROJECT CROSSES PROPERTY LINES, WE USED AN
IMAGINARY LINE TO ESTABLISH LIMITS OF LIGHT SPILL ANALYSIS.
20' 40.
SCALE. V 425-T
h.!
/0.0
5,1
IMAGINARY LINE /
0.0
USED AS LIMITS /
OF LIGHT SPILL 0.0
ANALYSIS
/ 0.0
rJ tta \
' tea I
I I b
o
\
/o.0
/ 0.2
45'. vkik'
3
/02
9SCI
-4D3' / 0
'a \C'
/ 02
/02
/ 02
•
-------- --------- -
•
•
PROPERTY
—or—r —or —F—r---T— Thor or o . O o Ca OA OA y—Dr _Thr —or —oAT 0-7 —0.0 ----- --- or
--oT o2 -°7
—Or
/
/01
/
,p,
P-*
P°
P°
P.°
P°
lID
P°
P O
P.° — —0 -,--
OA
LIMITS OF LIGHT SPILL
ANALYSIS. VALUES SHOWN
ARE LIGHT LEVELS IN FOOT
CANDLES. TYPICAL
—or toWNF,R Co- —or ---- ----- ------ —or OOTC
-cfr _Ls _
US 36
(100' ROW)
PAAGINARY UNE
USED AS UNITS
OF LIGHT SPILL
ANALYSIS
/ 0.2
/01
/01
PROPOSED
POUR LEVEL
PARKING
STRUCTURE
LIGHT SPILL PHOTOMETRIC PLAN - SHEET 11
ISSUE DATE: 08-11-2015
b.o
1,0
b.o
10.0
TOWN PROPERTY
00 0.0
0.0 00 0.0 00 00 00
0.0
0.0
0.0
0.0
01
/ /0.1
/0.1
0.1
2,2
241-07
(-1--) 0 0 0 Q 0 0 0
45•-0' I 27
1
, .j. 3-11. -0. 2L-01 4547' 3a-o- 270' 45'4.
El 9.0 9.0 51 3.8 63 6 9.1 8.0 5.0 1 GA 0.6 9.1 0.0 0 la 8.8 6.0 9.1 7.9 4.6 3 5.11 83 9.1 12 3.3 12 8.1 91 6.5 3.8 6.5 14 9.7
r--t
0 41 4.5 3.6 3.0 4.1 .7 4:9 4; 3.5 9. 4.1 4.7 4:9 43 3.1 4.1 4.7 4.9 4.5 -3.4 2P"3.7- 4.5 4.9 4.5 31.27. 3.5 4.4 9.0 .13 4.0 3,1 3.7 4.6 5.1
0110131111
11111111 II
16 97 5.4 4.2 7.9 010,992 54 4. 74 10.4,30,9 67 4,1 73 11610.9 9.1 5.3 3. 6.3 93 *A 9.4 0. 3.5 5.6 9.3 Op , A 72 4.1 51 9A IA i 1.4 -
',1
13
.1
7.9 9.0 82 5.8 41 7.1 A 9.0 81 5,7 • 7.1 16 30 62 7 4.8 7.1 16 91 1.1 5.4 41. 32 8.3 30 4.2 6. 4.1 5.7 6. 10 4 7.0 43 59 9.3 9.1 35 0.
MA 7A 92 53 4. 7. 9.9 10.8 9.1 4,3 7.6 39 103 97 3,3 3. 6.4 9.5 116 9.4 6 3.7 56 9.3 30_6 .7 7,3 12 8.0 9.5 11.1 93 6.
I 2.1 0.6 7.4 6.7 5.6 4.9 83 91 TS 6.7 5.8 43 6.3 7.1 7.5 6.7 6.6 4.9 0.3 7.1 7.4 6.6 5.5 4.2 56 63 7.3 37 51 4.4 5.5 67 7.3 6.9 6.2 4.9 5.7 19 7.4 7.0 5.9
13 39 8.4 95 6.5 5.7 4.6 7.4 p.0 85 95 5.7 4,q 7,1 0.0 93 82 .7 4,6 7.4 9.0 9.5 0.4 5.5 t 6.4 6.7 0.4 6.5 1. 4.1 541 36 6.4 6.8 7.1 4.6 13.1 8.6 9.5 119 6
9.34101 93 5.7 4.4 7.7 1411.0 83 5.7 4. 7.7 1041073 13 7 4.4 7.1 11411.0 9.3 5.5 3.. 6.6 6.3 470 9.5 6. 36 5.0 9.5 iv y,. 7A 4.3 6.1 93 6_0 100 7
77 4.6 4.1 6 3 6.9 9
3
,
2.0 3_54118 9.3 5.7 4.4 7.7 0410.6 9.3 57 4 7.7 10.45).8 9.3 .7 4.4 7.7 10.410.0 9.2 5.5 3. 6.5 9.7 603 9.5 6. 18 38 9.3 43 , .9 7A 4.3 6.0 9.5 ipa 9. 7.J I
4.4 93 103 9.3 5.7 4.4 7.7 ' 90 1E75 10.1
9.3
10.8
6
93 .77
4_7
710.1
13
103
04 5
9.2
,
0.6 17 103
6
9,5 6.1 33
56
58 3 5 10.1 .8 7.4 4.3 6.0 9.5 10.13 10.0 6 7
'21 7.4 .3 14 5.3 4.7 72 A 5.3 /4 5.7 4. 7.3 96.4 ,2 .5 4. 5.4 3 92 .4 7f 8,4 03 _6 5.9 8.4 9.3 8.7
-73-377-5.% 3'.1-U RD /A 5.1 5.0 4.9 04 /.5 r.4 81 5.5 5.0 53 3.1 1.2 b b 5.3 •.. 5.0 5.5 32 80 5.8 4.5 5.h 31 rl' litim..1 41 57 -6.$--.3 6.9
III
ij
Z1 15 9.3 a. 33 V 7.3 .8 9.3 84 5.7 4. 7.3 89 9.4 84 _8 4.1 7.4 8.9 9.3 113 5.5 4. 84 5.6 9.3 6.4 6. 4.7 5,9 6.4 5.3 .7 7.1 4.6 6.0 8.5 9.3 8.6 6.1
0 23 9.6 10.9 9.4 5,7 44 77 0,2 10.2 11.0 83 7 4.4 7.7 103 10.9 10_9 8 10.9 .9 7.4 4.3 63 96 11.0 110 7 10 1 ; 3. 1 r
,
3.0 6.5 9.4 8.5 5.3 4.7 7.3 .0 9.5 35 5.7 4. 73 0.0 33 15 .7 4.8 7.3 9.0 0.5 8.4 5.5 3. 63 8.7 9.4 6.5 9. 41 5.9 6.5 9.4 .7 72 4.6 6.0 16 9.5 6.9 6.
l•
33 114 7.1 6.7 5.6 43 6.3 5.1 7.4 6.7 5.6 4.9 12 7.7 7.4 8.7 6.5 4.9 83 1.1 7.4 6.3 5.3 42'3.8 61 7.3 6.7 51 444 5.8 6.7 7.3 6.9 5.2 43 5.7 5.0 7,4 6.9 5.0,,
[1:1 3.4 11 10 8.1 5.7 4,7 73 .6 0.0 ILI 57 4. 72 63 10 67 .7 4.7 72 9.7 0.1 al 5 5 4_ 8.3 0_3 9.0 1.1 6. 4.1 SA 52 9.0 .4 0.9 •I3 6.0 8.3 9_0 8.5 6.
1 12 156 0.2 56 4.3 7.0 .9.101 12 53 4.
,
7.8 19.136 31
1
6 1.1 7.6 10/101 9.1 5.4 3. 0.4 9.5 40.6 9.4 & 3.7 53 03 196 7 72 4.3 5.9 5.3 :
1
7.5 53 7. , 0
* • I
3.3 95 400 103 131 103 10.1 10.5 0.1 52 3 133 18 10.9 33 16 93 10.8 10.9 I. i 1 i„ a. 20 11 11 BO 5.1 3.0 6.7 6 5.1 80 3.0 6.0 83 9.0 8.0 0 311 BA 18 9,1 7.9 41 3. 5.3 03 97 62 5 33 52 6.1 11 .4 65 31 5.3 67 97 15 5 h I
--
ci
-. 1--711-1217.73.1_,=
,
-.1-1±1415-6.1113.7_4L7L 411-,7731 7.71.1 tT 111_ sla0.1113.-9.117-11_,-137171_71.40._,AIL11_7171314.0.77.1.22_,-.4.111111-43 731,351thl-L-LtIT14
1
.-
-1‘ ,'' • ' \
LUMINAIRE SCHEDULE - TYPH2AL. COVERED LEVEL
ST MBOL QUANTITY LABEL ARRANGEMENT TOTAL LAMP LUMENS LIE DESCRIPTION WM. WATTS
0 26 TEKDEK 73W LED SINGLE NA 0.800 KENALL TD17H0-101-5.6410.0W-721.4310-11CCOV 713.42
LUMINAIRE SCHEDULE - irePICAL. TOP LEVEL
SYMBOL QUANTITY LABEL ARRANGEMENT TOTAL LAMP LUMENS LLF DESCRIPTION
we 1 TWIN 18130 P21 BACK-BACK N/A 0,800 GARDCO PUREFORM P21-5W-180LA-NW
AO 2 TRIPLE 100W P21 131C 50' WA alma GARDCO PUREFORM P21-5W-160LA-NW
CALCULATION SUMMARY - TYPICAL COVERED LEVEL
UNITS AVERAGE MAXIMUM MINIMUM AVERAGE/MIMMUM MAXIMUM/MINIMUM
FOOT CANDLES 7.01 11.13 2.0 331 5.90
0
0
0
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
0 20' 40'
Gi9 1
SCALE: 1' t 20,0'
TYPICAL COVERED LEVEL
0 0 0 0 0 0 0
0
248,0'
45,13. 27,01 2T-0. 45,0' 30,0' 27,01 461701
1.7 4s 9.6 11 1,5 1.4 32
3 1.1 1.6 1.1 19 23 A 2.1 2.1 7.1 2. 2.1 20 2.0 2.9 5 2.1 2.1 2.0 13 2.1 2.1 2 2.0 19 2.0 2.0 2 2D 2.1 2.1
3 1.7 1.11 7.0 2.2 2,3 24 25 LS 21 2A 2.3 3.3 23.,3 2.4 2.4 22 22 7.4 2.3 2.. 73 32 22 22 23 23 2.4 2.4
1.9 LI 2.3 2.5 2.5 2.5 12 2 2.3 2.7 3,7 26 26 126 2.7 2.7 25 25 2.7 2.6 2' 23 23 25 2.8 2.0 2.7 2.7 23
1,6 7.9 22 2.4 2.7
13 2.1 2.4 2. ao
11 20 23 2.7 3.1 14 3.0
I 22 2.5 .9 3.3 33
CALCULATION SUMMARY - TYPICAL TOP LEVEL
UNITS AVERAGE MAXIMUM MINIMUM AVERAGE/MINIMUM MAXIMUWWNIMDM
FOOT CANDLES 2.97 6.2 1.0 2.97 120
23 2.7 it 17 45 5.3 5.8
23 3.7 .1 36 42 4.9 53 3
I f
3.1 25 2. 33 3.9 43 4,9 .6
2.0 2.3 2.7
'
.8
13
33 4.0 .8
; I 13 2.1 2.4 2.7 3.3 3.5 2
''I 1.7 1.9 2,1 2.4 2.7 2.9 0 8
-! 1.5 1.7 1.13 2.1 2.1 25 23 3
13 IS 1.7 1.9 20 22 2.3 20
I 1.2 1.3 13 13 1.8 1.5 3.0 I.7
...
1 1.0 1,1 13 1.1 1.5 1,7 I 7
2.0 7 1,9 1.0 1.7 1.5 1.4
3.4 3.4 3.4 9.6 r 43 4,9 5g
I
I
,.
16 3.5 3.8 3.8 .1 4.4 43 16 5
.5 52 4.6 4.1 15 25 2
57 52 4.4 3.7 21 2
3.0
,s..3 14 3.4 35 37 SA 42 4.5 4.9 5/ ?
.7 2_5 2.5 2.3 2.1 1.8 12
3.9 2.8 21 2.4 2.9.1 110 :111
::
,i!
.5 4.0 4.2 3.7
.4 3.3 13 9.9 33 r 3.9 4.1 43 4,
3 39 37 3
3:
8 LT 2.3 1:
...!' 3.0
1 32 3 15 3.7 3,3 5.
131,
.6 2.6 2.5 2.8 23 '.7 2.8 2.9 2.9
1,03' 3
33 ao 2.7 24 21
.9 23 21 28 2.9 2 33 3. 3
.4. 2.3 2.3 3,3 2.3 12.3 2.4 23 26 29
l
a
22 7.1 2.0 2.1 2.0 .1 2.1 22 23 2
0 ID 1.8 1.7 IA 1.4 1.3 1. .1
9 1.9 1.9 1.8 la 1.9 1.9 1.9 1. 1.6 1.7 1.0 1.5 to 1.3 I 1 1
3.
3. .9 3.2 3.3 3.3 1 1, .9 2 73 2.8 28
3.3 3.9 6.4 3.7 33 3.7 33 3.4 3.3 33 03 3.3 3.4 32 3.1 9.4 13 3/ 11
3.8 4.0 43 4.3 4.2 4.1 3.9 37 17 33 33 3.7 3.7 3.7 3.5 3.7 16 3. 3.4
43 13
.
.5 4.9 4.6 43 4.
,
4.2 4.0 3.9 33 .9 4.0 4.2 42 4.0 4.2 4 31 ,03.7
23 2.7 3.1 3.6 4.2 4.9 3.3 .5 57 54 5.0 4. 4,5 4.3 4.2 4.1 11.3 4.4 4.7 4,7 43 43 4.3 4. 39 39
2.9 2. 3.2 3.7 4.4 3.3 5h .816 08 51 4, 43 4,4 4.3 4.2 _3 46 4.9 5.5 4.0 4.0 43 4. 4.0 3.9
2.4 2 3.2 111 4A 5.4 5
2.3 .0 2.2 2.1 2.0 1.8 1.6 Ie....
2.7 TA 25 2.3 2.3 2.1 1.8 1.7 I.
.0
7 3.2 3.2 3. .0 23 2A 2.1 1.9 1.
3.1 3.1 33 3,3 15 3.6 3.7 16 113 3A 3.2 .7
0
2.4 2.1 t. 6 . 3. L 1
14 14 3.5 3. 3.9 4.0 4.1 42 6 39 1.7 3.3 2.7 23
33 3.7 3.3 4. 4.2 43 4.7 4.6 .5 4.5 42 3.7 33 2.9 2.5 2.
,
ti
3.9 4.1 4.9 4.5 4.8 5.3 5.5 i 3 5.2 43 4.1 15 2.7 3
4.0 47 t 4,6 51 5_6 10 9 17 5.2 4.4 3.7 3. 2.7 2.
a -s3-T.3 -3.4 3 23
4 22 2.1 2,0 1,9 13 1. 1
1
,
TYPICAL TOP LEVEL
PARKING STRUCTURE PHOTOMETRIC PLANS - SHEET 12
ISSUE DATE: 08-11-2015
Copyright 2015 All rights reserved. No part or this document may be reproduced in any form or by ony means without permission from Walker Parking Consultants/Engineers. Inc ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
PLANTING BED (I BLS SF)
X% z 2 X' X x r.
z 14 X. X 1 X X
WEI NATIVE GRASS
SEEDING {12807 SEI
NEW CONIFEROUS TREE (XT)
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
0 YY 60'
SCALE 30,0'
v Eft 0,,,,Rsosg‘
BlG -""‘
WE I NATIVE GRASS
SEEDING (13591 5FI
NEW WATER DUALITY
X X
, M M 2(2::(4 M2(2(XX.
,XXXXX (4 X. (4 03 X X X 11-(7.-* /
.(•(.. (0 .2'...:B.NI:41616)Bir.f4Z--46-6))6X))9'.14
2.1 16 • Y.) 7.: 14- • . e.; z z z z•
'X if. ';.;
(1XXXX.:42( z :XX XXXX X
2-RAIL DOWEL FENCE
PROPOSED SIDEWALK
LEGEND:
WILD FLOWER SEEDING
7 7, WILD FLOWER NATIVE GRASS SEEDING
SHRUB BED
PLANTING BED
CONIFEROUS TREE
DECIDUOUS TREE
s C41°
.cy‘00? PUNTING BED OM
kG
PLANTER BAS
PLANTE
SHRUB BED
(329 SF)
NEW DECIDUOUS
TREE
PROPOSED
FOUR LEVEL
PARKING
STRUCTURE
POND
STRUCTURAL DESIGN
WILL ACCOMMODATE
PLANTING BED (43 SF EACH) WILDFLOWER
FtAN
PLANT4R
n
r
ryF
E
I
WITIE
m
I SEEDING (496 SF)
EXISTING CONIFEROUS
c
r-
TREE 7TH
GREEN
NEW FIRE HYDRANT. TYPICAL
NEW CONIFEROUS TREE (SHALL-1Q2)
NEW DECIDUOUS TREE (SMALL-X19)
CD-6
EXISTING CONIFEROUS
TREE (52)
WIDE FUTURE
CART PATH
EXISTING CONIFEROUS TREE
%X X XXX X X Z. z'4
EW CONFEROUS TREE COL
WR 1 NATIVE SEEDING
(1913 SF)
- -2)( X % 'X X 'X i.Erlef4O .14
'Ct*UrROVir, '
AsNPAL T APRON FOR NEW DECIDUOUS TREE (X9) ROADSIDE LIGHT POLES
LOW-SOY AND FIRE
TRUCE ACCESS
AND PLANTERS. TYPICAL
TOWN PROPERTY
U.S.B.R. PROPERTY
LANDSCAPE PLAN - SHEET 13
ISSUE DATE: 08-11-2015
Copyrsghl 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission 1rom Walker Porking Consultants/Engineers. Inc. ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
EVERGREEN TREES
I. GUY ALL CONIFER TREES AND ALL
DECIDUOUS TREES LARGER THAN 2.1S" CAL. AS
SHOWN,
2. IN SODDED AREAS, CUT SOD IN 36" CIRCLE
AND MULCH. FOR CONIFERS CUT 50D AT DRIP
LINE OF TREE AND MULCH.
3. GUT EVERGREEN TREES IN 3 PLACES AT 45
DEGREE ANGLE SLIGHTLY TAUT ONLY TO
ALLOW SOME MOVEMENT. USE NYLONG
STRAPS (NOT HOSES) WITH METAL GROMMETS
FLAGGING
14.1:4'‘,.000*.eir
ttipr
SET TOP OF ROOT BALL 4" ABOVE LOWEST
ADJACENT GRADE. REMOVE TOP 2/3 OF
WIRE BASKET AND BURLAP.
----WOOD MULCH (4" DEPTH).
6' DEPTH AMENDED SOIL
BACKFILL PIT WITH EXCAVATED SOIL
DECIDUOUS TREES
STAKE TREES USING METAL POSTS WIRED
(SLIGHTLY TAUT). WITH NYLON STRAPS. SET
POSTS VERTICALLY PLUMB. NO RUBBER HOSES,
PROTECTIVE RUBBER CAPS ON POSTS.
PANG FROM BRANCHES WITH I" WITH NYLON STRAP
ANTLER RUB PROTECTION
SHRUBS
PLACE SHRUBS A MINIMUM OF IS" FROM PLANTING BED EDGE
(STEEL HEADER, CURBS. WALKS. WALLS. ETC.) FOR I GALLON
SHRUBS, 3' MINIMUM FOR 5 GALLON DECIDUOUS SHRUBS, 4'
FOR CONIFER SHRUB.
FOR 5 GALLON AND LARGER PLANT MATERIAL CONSTRUCT A
2" HIGH WATERING RING AROUND SHRUB AT EDGE OF
PLANTING PIT. FOR I GALLON MATERIAL, CONSTRUCT A 2" X
IS" DIA. WATER RING AND MULCH WITH WOOD BARK INSIDE OF
THE WATER RING.
IS" MIN.
WRAP TREES TO FIRST BRANCH N THE FALL. IF
PLANTED IN THE SPRING DO NOT WRAP.
REMOVE TOP 3/4 OF WIRE BASKET AND BURLAP.
SET TREE ON COMPACTED SUBGRADE WITH TOP
OF ROOTBALL 3' ABOVE LOWEST ADJACENT GRADE. 2' DIA
NO WEEDBARRIER FABRIC
HAND SPADED EDGE
4" DEPTH
LALLN
4' DEPTH WOOD MULCH AT BASE OF TREE.
30" DIA. MULCH RING IN LAIN AREAS_
6" DEPTH AMENDED SOIL. NO SPECIAL
iL7] I 11 I IE BACKFILL MIX.
=111E11E11 EXISTING SUBGRADE
11E1 I
=III=1117
II kill IF
SHRUB BED FINISHED GRADE
6" DEPTH AMENDED SOIL
Ez-111E111111111E111_111' 111_-111E111.7=-111:- llE m-i=
Ns., 2X ROOT BALL DIA. SCARIFY SIDES
AND BOTTOM,
11,111,111-1 1=1
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
LANDSCAPE COST ESTIMATE
item Quantity Unit Unit Cost Total Cost
landscaping
1 Trees- 8' height (con.) 10 EA $500.00 $5.1:40.00
2A Trees- SMALL (con.) 22 EA $300.00 $6,600.00
2 Trees- 3" Caliper (dec.) 11 EA $500.00 $5,500.00
2A Trees- SMALL (dec.) 19 EA $300.00 $5,700.00
3 Shrubs/Perennials 3576 SF $5.00 $17,880.00
4 Wild Flower /Native Seeding and Ileveg. 28317 SF $1.00 $28,312.00
5 Wild flower Seeding 496 SF $1.00 $496.00
6 Planting Bed (Perrenials /Annuals) 1714 SF $5.00 $8,570.00
7 Irrigation 34103 SF $2.00 $68,206.00
HardScape
8 Mow Edge - 6" concrete curb 43 LF $7.00 $301.00
Mountable curb 67 LF $6.00 $402.00
Site Amenities
10 Feature Stones, Boulders 50 EA $450.00 $22,500.00
11 Planters (Building Budget)
Subtotal
$110,576.00
Soft Costs
121Contingency(15%)
I I I
$16,586.401
TOTAL $127,167.40
General Notes
1 Pricing for general reference only. Landscaping to be provided in-house by EP Parks Dept
2 All Signage not in Landscape Scope of Work.
3 All lighting to be specified and priced by others.
4 All existing hardscape indicated to he integrated with new work.
5 All retaining wall work to be designed and specified by civil engineer and included in base bid.
6 Curved landscaping edge at vehicular entry to be loose rock / boulder edge, included in landscaping.
TREE AND SHRUB INSTALLATION
PLANTING DETAILS - SHEET 14
ISSUE DATE: 08-11-2015
Copyright 2015. All rights reserved. No part of this document may be reproduced in any form or by any means without permission from Walker Parking Consultants/Engineers, Inc ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
0
ro, NORTH ELEVATION PHASE 1
3/32" = 1'.0"
ij
0 0
45 10
TOP LEVEL
34' - 0" \JP
11
THIRD
L
LEVEL
23' - 0"
Lia;;or
IP"
CI El
15
SECOND LEVEL
6
GROUND LEVEL gini
0"
14
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
O EAST ELEVATION PHASE 1
3/32"=1
ELEVATION LEGEND:
1. ACID ETCHED PRECAST CONCRETE SPANDREL OR WALL
2. ACID ETCHED PRECAST CONCRETE SPANDREL WITH TEXTURED SURFACE
3. PRECAST GRAY CONCRETE COLUMN
4 STAINED PRECAST COPING OR INSET PANEL
5. STONE VENEER ON CMU OR PRECAST WALL
6. HEAVY TIMBER
7. LOG COLUMN
8. CORRUGATED. RUSTED FINISH STEEL ROOF
9. PAINTED METAL STAIRS AND GUARDRAIL
10. SIGNAGE
11. LIGHT POLE (AT TOP LEVEL)
12. STREET LIGHT POLE
13. HANGING METAL PLANTER BOX
14. SITE PLANTER WALL WITH VENEER STONE, PRECAST CAP AND CONTAINER
PLANTS
15. WALL MOUNTED LIGHT FIXTURE
16, 1" VERTICAL REVEAL
17. r HORIZONTAL REVEAL
19. LANDSCAPED TERRACE
19. ACID ETCHED PRECAST CONCRETE SHEAR WALL
20. HEAVY TIMBER FASCIA
? 1
21.3; ARCHITECTURAL ELEVATIONS - SHEET 15
SCALE: X32' = iLcr
ISSUE DATE: 06-24-2015
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
1
11 14
1 6
jh SECOND WEST
13° - 6"
11'- t -P I 6-9` 1T -S
26.0` 36-10'
/1
1111111F:,1111:111-11111111,1111111.111
_ TOP WEST
35 - 6' /1111,
12
_ THIRD wesi,
24'- 6"
14
SECOND WEST
13'-6"`111
GROUND )
ELEVATION LEGEND:
1. ACID ETCHED PRECAST CONCRETE SPANDREL OR WALL
2. ACID ETCHED PRECAST CONCRETE SPANDREL WITH TEXTURED SURFACE
3. PRECAST GRAY CONCRETE COLUMN
4. STAINED PRECAST COPING OR INSET PANEL
5. STONE VENEER ON CMU OR PRECAST WALL
6. HEAVY TIMBER
7. LOG COLUMN
O. CORRUGATED. RUSTED FINISH STEEL ROOF
9. PAINTED METAL STAIRS AND GUARDRAIL
10. SIGNAGE
11. LIGHT POLE AT TOP LEVEL)
12, STREET LIGHT POLE
13. HANGING METAL PLANTER BOX
14. SITE PLANTER WALL WITH VENEER STONE. PRECAST CAP AND CONTAINER
PLANTS
15. WALL MOUNTED LIGHT FIXTURE
16. 1" VERTICAL REVEAL
17. 2' HORIZONTAL REVEAL
19. LANDSCAPED TERRACE
19. ACID ETCHED PRECAST CONCRETE SHEAR WALL
20. HEAVY TIMBER FASCIA
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT I, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
O
'9)
ri) SOUTH ELEVATION
Vi 3132"=1-0"
,-;„ WEST ELEVATION
3132" =
SP.6 211' e f
SCALE: 312" = t-ff
ARCHITECTURAL ELEVATIONS - SHEET 16
ISSUE DATE: 06-24-2015
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
11
11
.70"
34' - 0"
TOP LEVEJ___5",
9
_ THIRD LEVElgrk,
23' - 0" "AP 13
k
SECOND LEVEL
12' - 0"
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
c5)
-10P LEVE
ILI 34' - 0"
TOP WEST
35 - 6"
AL THIRD LEVEb,,.
IL/ -
THIRD WEST
SECOND LEVEL
17 - 0"
OUND WEST ill,
1/61,1
14
O NORTH ELEVATION FUTURE
3157' = 1'-0"
19
1$
ELEVATION LEGEND:
1. ACID ETCHED PRECAST CONCRETE SPANDREL OR WALL
2 ACID ETCHED PRECAST CONCRETE SPANDREL WITH TEXTURED SURFACE
3, PRECAST GRAY CONCRETE COLUMN
4, STAINED PRECAST COPING OR INSET PANEL
S. STONE VENEER ON CMU OR PRECAST WALL
6. HEAVY TIMBER
7. LOG COLUMN
8. CORRUGATED, RUSTED FINISH STEEL ROOF
9. PAINTED METAL STAIRS AND GUARDRAIL
10 SIGNAGE
11. LIGHT POLE {AT TOP LEVEL)
12 STREET LIGHT POLE
la. HANGING METAL PLANTER BOX
14. SITE PLANTER WALL WITH VENEER STONE. PRECAST CAP AND CONTAINER
PLANTS
15. WALL MOUNTED LIGHT FIXTURE
16. 1" VERTICAL REVEAL
17. 2" HORIZONTAL REVEAL
19. LANDSCAPED TERRACE
19. ACID ETCHED PRECAST CONCRETE SHEAR WALL
20. HEAVY TIMBER FASCIA
a
a
:Fa
GROUND LEVEL
0"
4
O EAST ELEVATION FUTURE
3/32" = 1*-0"
ARCHITECTURAL ELEVATIONS - FUTURE - SHEET 17
ISSUE DATE: 06-24-2015
106 212;
SCALE:33T
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
11
1110.74p.mming ty _rA
oii111111111
..aig1111111111
a
TOP WEST /ii
35 - 6
12
THIRD WF-F_ts
ELEVATION LEGEND:
1. ACID ETCHED PRECAST CONCRETE SPANDREL OR WALL
2. ACID ETCHED PRECAST CONCRETE SPANDREL WITH TEXTURED SURFACE
3. PRECAST GRAY CONCRETE COLUMN
4. STAINED PRECAST COPING OR INSET PANEL
S STONE VENEER ON CMU OR PRECAST WALL
6. HEAVY TIMBER
7. LOG COLUMN
8. CORRUGATED. RUSTED FINISH STEEL ROOF
9. PAINTED METAL STAIRS AND GUARDRAIL
10. SIGNAGE
11. LIGHT POLE (AT TOP LEVEL)
12. STREET LIGHT POLE
13. HANGING METAL PLANTER BOX
14. SITE PLANTER WALL WITH VENEER STONE. PRECAST CAP AND CONTAINER
PLANTS
15. WALL MOUNTED LIGHT FIXTURE
16. 1" VERTICAL REVEAL
17. 2' HORIZONTAL REVEAL
18. LANDSCAPED TERRACE
19. ACID ETCHED PRECAST CONCRETE SHEAR WALL
20. HEAVY TIMBER FASCIA
24' - 6"
14
_seconowesT
GROUND WEST
1' - 6"
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
SOUTH ELEVATION FUTURE
Q 3/32" .1%6'
a WEST ELEVATION FUTURE
3/32" = 1'4"
0 10.6' 21 ARCHITECTURAL ELEVATIONS - FUTURE - SHEET 18
ISSUE DATE: 06-24-2015
SCALE. liLt =1,0"
r r 1 I
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
1+11.(1K c E
p.p.K.otc
+i Sr./6kt
PHOTO SIMULATION - EAST VIEW - SHEET 19
ISSUE DATE: 06-24-2015
21.3"
SCALE 3/32" = 1,0"
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
141111kr
•
ik*
idhe
f4
T.
ir-
)0LITIMer,431-
E•1 1 '
•E I • f I.
'71 •
4 •
PHOTO SIMULATION - FUTURE EAST VIEW SHEET 20
ISSUE DATE: 06-24-2015
2).3'
SCALE 352-= 1'-0'
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION. LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK. COUNTY OF LARIMER, STATE OF COLORADO
21.7 PHOTO SIMULATION - WEST VIEW SHEET 21
ISSUE DATE: 06-24-2015
SCALE' 3137 .= 1,7
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
10.6' 21.3
1
' 0
I t
SCALE 113T = 1,0"
PHOTO SIMULATION - FUTURE WEST VIEW SHEET 22
ISSUE DATE: 06-24-2015
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
PHOTO SIMULATION - NORTH VIEW - SHEET 23
ISSUE DATE 06-24-2015
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
PHOTO SIMULATION - FUTURE NORTH VIEW - SHEET 24
ISSUE DATE 06-24-2015
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
21.3' PHOTO SIMULATION - STAIR ENTRY VIEW - SHEET 25
ISSUE DATE: 06-24-2015
SCALE: 3/3T =
I I'. -II ,- 7-d I I I-, I ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE
LOT 1, VISITOR CENTER SUBDIVISION, LOT 44, LITTLE PROSPECT MOUNTAIN ADDITION
AND LOT 3, STANLEY MEADOWS ADDITION,
TOWN OF ESTES PARK, COUNTY OF LARIMER, STATE OF COLORADO
0 1,16' >1 1 PHOTO SIMULATION - FUTURE STAIR ENTRY VIEW - SHEET 26
ISSUE DATE: 06-24-2015
SCALE 3137 =1,0'
ESTES PARK TRANSIT FACILITY PARKING STRUCTURE