Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
220_B-10266_2016-01-20_ROOF-FRAMING (1)
220_B-10266_2016-01-20_ROOF-FRAMING (2)
220_B-10266_2016-01-20_ROOF-FRAMING (3)
220_B-10266_2016-01-20_ROOF-FRAMING (4)
220_B-10266_2016-01-20_ROOF-FRAMING (5)
220_B-10266_2016-01-20_ROOF-FRAMING (6)
220_B-10266_2016-01-20_ROOF-FRAMING (7)
220_B-10266_2016-01-20_ROOF-FRAMING (8)
220_B-10266_2016-01-20_ROOF-FRAMING (9)
220_B-9581_2015-12-22_PHOTO-COMMENTS
220_B-9581_2015-12-22_WORK-IN-PROG (1)
220_B-9581_2015-12-22_WORK-IN-PROG (10)
220_B-9581_2015-12-22_WORK-IN-PROG (11)
220_B-9581_2015-12-22_WORK-IN-PROG (12)
220_B-9581_2015-12-22_WORK-IN-PROG (13)
220_B-9581_2015-12-22_WORK-IN-PROG (14)
220_B-9581_2015-12-22_WORK-IN-PROG (15)
220_B-9581_2015-12-22_WORK-IN-PROG (16)
220_B-9581_2015-12-22_WORK-IN-PROG (17)
220_B-9581_2015-12-22_WORK-IN-PROG (18)
220_B-9581_2015-12-22_WORK-IN-PROG (19)
220_B-9581_2015-12-22_WORK-IN-PROG (2)
220_B-9581_2015-12-22_WORK-IN-PROG (20)
220_B-9581_2015-12-22_WORK-IN-PROG (3)
220_B-9581_2015-12-22_WORK-IN-PROG (4)
220_B-9581_2015-12-22_WORK-IN-PROG (5)
220_B-9581_2015-12-22_WORK-IN-PROG (6)
220_B-9581_2015-12-22_WORK-IN-PROG (7)
220_B-9581_2015-12-22_WORK-IN-PROG (8)
220_B-9581_2015-12-22_WORK-IN-PROG (9)
INSPECTION 220 2nd St 2015-12-22
INSPECTION 220 2nd St. beams final 2013-11-27
INSPECTION 220 2nd St. drywall 2016-02-23
INSPECTION 220 2nd St. final CO 2016-04-25
INSPECTION 220 2nd St. framing 2016-01-20
INSPECTION 220 2nd St. framing 2016-02-01
INSPECTION 220 2nd St. HVAC, plumbing, gas 2016-01-20
INSPECTION 220 2nd St. walk-thru 2016-01-18
INSULATION 220 2nd St. builder stmt 2016-02-15
PERMIT 220 2nd St. install wood stove 2016-09-14
PERMIT 220 2nd St. pllumbing 2014-03-19
PERMIT 220 2nd St. replumb-repipe 2015-11-12
PERMIT 220 2nd St. water heater 2019-02-11
PERMIT 220 2nd St. duplex 2014-02-11
PERMIT 220 2nd St. replace beams 213-10-22
Thumbs
TOEP Addressing. 220 2nd St, 2022-03-31